WAC Notes July 23 2019
From PREX Wiki
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions
WAC Notes July 22 2019 << >> WAC Notes July 24 2019
July 23 2019
- Slug 12 is the first without the old PREX 1 quartz - from here on we are using different quartz: HALOG
Production Run List
Start Slug 12 at junk run 3583, IHWP In, FFB on always, no RHRS, new PREX II quartz (in LHRS)
- Good - ####
Non-Production Runs and Bad Runs
- Junk 3583: adaq1 test at midnight (slug12 starts here)
- Junk 3584- : Test runs after IHWP in
Pedestal/Calibrations Updates
- Updated prex_maindet.3583-.map
- Removed not_blindable and not_normalizable from RHRS MAIN detectors
- Removed not_normalizable from RHRS AT detectors
- Updated prexCH_beamline_eventcuts.3583-.map for 70uA running
- bcm, bcm_an_ds, 55, 1e6, g, 0.8
- bcm, bcm_an_us, 55, 1e6, g, 0
- all other cuts as of before
- Based on HALOG
- Updated prexCH_beamline_pedestal.3583-.map
- Updated prex_maindet_pedestal.3583-.map
- Updated prex_sam_pedestal.3583-.map
- Pedestal map files need to be updated once we have results from new current scan
Issues
Other Status Updates
- Accumulated charge =
- Slug 12 is the first without the old PREX 1 quartz in LHRS (RHRS still has old PREX 1 quartz)- from here on we are using different quartz: HALOG
- I was informed that the prexPrompt_pass1 root file for run 3425 was accidentally overwritten
- Re-prompted this run