WAC Notes August 3 2019
From PREX Wiki
Revision as of 12:41, 5 August 2019 by Vowen (talk | contribs) (Created page with "{| cellpadding=5 style="margin:7px 30px 0 30px; <!-- --> float:right; border:1px solid #AA6633" |- bgcolor="#fbfeff" |- |Documentation |- | HOW TOs | HOW TOs for shif...")
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions
WAC Notes August 2 2019 << >> WAC Notes August 4 2019
August 3 2019
Daily Meeting BlueJeans
Production Run List
- Slug 27, Wein_Left, IHWP_IN
- continued from 2August (runs 3811-3813)
- runs 3814-3821
- temperature increases in collimator lead to a lowering of beam current by shift crew
- beam current consistently lowered throughout the slug to find temperature stability
- main detector widths increased throughout the slug as well
- target changed from D9-208Pb-D10 (this target experienced ~20C over its lifetime, ~15 good)
- good production running
- runs 3822
- new target D7-208Pb-D8
- good production running
- collimator temperatures low and stable
- run 3823
- good production running
- increased raster size
- Slug 28, Wein_Left, IHWP_OUT
- runs 3824-3838,3840 : good production running : ended on 4 Aug.
- run 3839: suspicious, large MD width
Non-Production Runs and Bad Runs
Pedestal/Calibrations Updates
Issues
- increased widths as target D9-208Pb-D10 degraded (through run 3821); improved with new target (run 3822)