WAC Notes August 15 2019

From PREX Wiki
Revision as of 11:00, 15 August 2019 by Cameronc (talk | contribs) (Created page with "{| cellpadding=5 style="margin:7px 30px 0 30px; <!-- --> float:right; border:1px solid #AA6633" |- bgcolor="#fbfeff" |- |Documentation |- | HOW TOs | HOW TOs for shif...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions

WAC Notes August 14 2019 << >> WAC Notes August 16 2019

August 15 2019

Daily Meeting BlueJeans

Production Run List - Slug 44 In


Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Retroactively changed the AT cuts from run 3867-> to allow for AT regression without nuance or annoyance in postpan.

Issues

  • RQ1 tripped at 4073-4077.
  • RHRS DAQ power fluctuation killed VME RAM during morning access. Fixed by replacing nvram battery.
  • Prompt got really slow over night.
  • ATs postpan cuts got turned off at the end of slug 42, so reanalyzing with japan cuts from slug 26 onward is necessary (until postpan is fixed properly).
  • CODA, Panguin, and Analysis minder died a number of times - possibly due to overworked NFS disk, but also maybe site wide networking issues.
  • Fixing NFS server is possible, under guidance of Ole.
  • Need to respin slugs 43 and 44 for summary plots and aggregator
  • Networking issues killed IOCs, and bug in EPICs reading killed alarm handler. Bug worked around (hopefully) and works again - this glitch caused missed HRS magnet trip for two hours.
  • LHRS HV control RPI fixed

Other Status Updates