WAC Notes August 15 2019
From PREX Wiki
Revision as of 11:00, 15 August 2019 by Cameronc (talk | contribs) (Created page with "{| cellpadding=5 style="margin:7px 30px 0 30px; <!-- --> float:right; border:1px solid #AA6633" |- bgcolor="#fbfeff" |- |Documentation |- | HOW TOs | HOW TOs for shif...")
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions
WAC Notes August 14 2019 << >> WAC Notes August 16 2019
August 15 2019
Daily Meeting BlueJeans
Production Run List - Slug 44 In
- Example - 40??
Non-Production Runs and Bad Runs
Pedestal/Calibrations Updates
Retroactively changed the AT cuts from run 3867-> to allow for AT regression without nuance or annoyance in postpan.
Issues
- RQ1 tripped at 4073-4077.
- RHRS DAQ power fluctuation killed VME RAM during morning access. Fixed by replacing nvram battery.
- Prompt got really slow over night.
- ATs postpan cuts got turned off at the end of slug 42, so reanalyzing with japan cuts from slug 26 onward is necessary (until postpan is fixed properly).
- CODA, Panguin, and Analysis minder died a number of times - possibly due to overworked NFS disk, but also maybe site wide networking issues.
- Fixing NFS server is possible, under guidance of Ole.
- Need to respin slugs 43 and 44 for summary plots and aggregator
- Networking issues killed IOCs, and bug in EPICs reading killed alarm handler. Bug worked around (hopefully) and works again - this glitch caused missed HRS magnet trip for two hours.
- LHRS HV control RPI fixed