WAC Notes September 2 2019

From PREX Wiki
Revision as of 14:16, 3 September 2019 by Ajzec (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions

WAC Notes September 1 2019 << >> WAC Notes September 3 2019

September 2 2019

Daily Meeting BlueJeans

Production Run List - Slug 77

Production Run List - Slug 78

Production Run List - Slug 79

NO BEAM INTERLUDE

Non-Production Runs and Bad Runs

No beam during this run:

  • Run 4758
  • Run 4759

Pedestal/Calibrations Updates

Issues

Other Status Updates