WAC Notes September 6 2019
From PREX Wiki
Revision as of 21:20, 6 September 2019 by Weibin (talk | contribs) (→Pedestal/Calibrations Updates)
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions
WAC Notes September 5 2019 << >> WAC Notes September 7 2019
September 6 2019
Daily Meeting BlueJeans
Production Run List - Slug 85
(Wien-left, IHWP-out)
- Good - 4836
- Good - 4837
- Good - 4838
- Good - 4839
- Good - 4840
- Good - 4841
- Good - 4843
- Good - 4844
- Good - 4845
- Good - 4846
- Good - 4847
Production Run List - Slug 86
(Wien-left, IHWP-in)
- Good - 4848
- Good - 4849
- Good - 4850
- Good - 4851
- Good - 4853
- Good - 4854
- Good - 4855
- Good - 4860
- Good - 4861
- Good - 4862
- Good - 4863
- Good - 4864
Production Run List - Slug 87
(Wien-left, IHWP-out)
Production Run List - Slug 88
(Wien-left, IHWP-out [still out, change beam tune], new target: D1-208Pb6-D2)
- Good - 4871
Non-Production Runs and Bad Runs
Pedestal/Calibrations Updates
update injector pedestal map file: prexinj_beamline_pedestal.4858-.map