WAC Notes September 4 2019
From PREX Wiki
Revision as of 13:34, 18 September 2019 by Weibin (talk | contribs) (→Production Run List - Slug 83)
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions
WAC Notes September 3 2019 << >> WAC Notes September 5 2019
September 4 2019
Daily Meeting BlueJeans
Production Run List - Slug 82
(Wien-left, IHWP-in)
- Good - 4796
- cut out large bcm asym in minirun 1: prex_bad_events.4796.map
- Good - 4797
- Good - 4798
- Good - 4799
- Good - 4800
- Good - 4801
- Good - 4802
- Good - 4803
- Good - 4804
- Good - 4805
- Good - 4806 Calibration
- Good - 4807 Calibration
Production Run List - Slug 83
(Wien-left, IHWP-out)
Non-Production Runs and Bad Runs
Pedestal/Calibrations Updates
Update pedestal file: logentry
- prexCH_beamline_pedestal.4808-.map
- prex_sam_pedestal.4808-.map
- prex_maindet_pedestal.4808-.map