Agenda
Analyzer code updates
- Pull requests
- #239---Feature-Aggregator Add Regressed
- Ready to be merged; I'll merge it later this week.
- #239---Feature-Aggregator Add Regressed
- New feature plans
- Continuing development of minirun functionality
- Data-handlers which can process results from other data-handlers
- I've made some commits, and am testing it this week. Working to resolve conflicts
- BMW first pass extractor
- Cameron has been in contact with Wouter to get started, will follow up this week
- Wouter has a WIP which uses an error flag test to select the events. Need to make sure Beammod has a unique error flag
Prompt analysis toolchain
- WAC checking of parameter files, etc.
- Catherine has a HALog summarizing the normalization BCM changes up to slug 68: https://logbooks.jlab.org/entry/3726581
- Deviaki will carry this analysis forward after slug 68
- A similar analysis would be to look at the double-differences as a function of time, when we had multiple BCMs working
- Catherine has a HALog summarizing the normalization BCM changes up to slug 68: https://logbooks.jlab.org/entry/3726581
- Status on the farm
- I had forgotten to look into requesting more volatile space last week; should follow up this week
- Need to set up the output directories
- Robert is doing some test jobs, and will follow up with me
- Path to migration to japan
- Needs: Correlation/correction done on mini-run basis, BMW extractor
- Do we want to do all of the prompt plots again? Certainly for CREX; let's think about it for PREX
- How much space are we useing in the web directory? Can we keep the PREX prompt, PREX respin, and CREX plots all at once? Robert will look into that
- Dithering analysis status & updates?
- Needs follow up with Victoria and Ye. Cameron had worked with Ye a little bit last week.
- Cameron has a modified way of storing the sensitivities and slipes in aroot file to make it easier to collect
- I think we do want to have this as part of the PREX2 respin.
- Lagrange analysis
- Maybe merge this with dithering analysis in some way? At least for the sensitivity/slope evaluation. Cameron will take a look at connecting it into the dithering toolchain as an additional step.
- Other issues
- Tao asks if the combiner trees can have a summary tree too. I think that should be possible. It may need some of the changes in the data-exchange branch I'm working on, Tao has posted a Github issue (#248)
Other issues
- Let's aim at getting everything ready for a respin by October 23.
- We should have soem understanding about the pedestal changes before we start
- We also need to have the "blessed" set of dithering slopes for all production runs
- Do we want to use the digital downstream as the normalizing BCM for the whole run?
- Caryn says that there are periods in the early run where both digitals were plugged into the same receiver, so the double differences are less meaningful...
- The analogs have better resolution when they are working, so if we use the "hodgepodge" choice we get a improved resoultion
- Kent suggests that for this respin we stick with the "hodgepodge"
- Caryn asks if we should be sure to use the same BCM for normalizing as we used for feedback: Kent says let's not worry about it for now, but we should keep track of which BCM was used in feedback and normalization
- Devi asks if we need to re-evaluate pedestals if we change the normalizing BCM? In fact, in the early runs the pedestals were determined with BCM-DS, but we used BCM-DSx3 as the normalizing BCM. It shouldn't really matter which BCM we used for the pedestal, as long as the BCM was working consistently with the others.
- Are we doing things to fix the analog BCM?
- Cameron has a function generator from J. Musson, to first check linearity at up to 150uA equivalent, but could also use it to check for the appearance on the noise in the BCMs
- Bob is going to move all the PREX2 raw data to the adaq2 disk, so we should just be aware of that
- Let's aim at getting everything ready for a respin by October 23.
Present
Tao, Devi, Don
Phone: Paul K., Cameron, Caryn, Ciprian, Jinlong, Kent, Bob M., Robert R., Sakib, Sangwha, Siyu