20191028-Analyzer-Mtg
From PREX Wiki
Jump to navigationJump to searchBack to Main Page >> Analyzer_Meeting
previous meeting << >> following meeting
Logistic information
Meeting room at JLab: CC F226
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 385 600 867 Bluejeans link: https://bluejeans.com/385600867
This meeting immediately follows the PREX2 Analysis meeting, which is dedicated to tasks directly related to the PREX-II analysis.
Agenda
Analyzer code updates
- Paul's work on analyzer updates had stalled last week
Prompt analysis toolchain
- WAC checking of parameter files, etc.
- Devaki was going to carry Catherine's analysis (https://logbooks.jlab.org/entry/3726581) summarizing the normalization BCM changes after slug 68. She sent it to Tao, and he's posted it in the HAPlog
- She will also be looking at the double-differences to piece out when various BCMs went bad, and figure out which double-differences we can trust
- For the double-differences, we look at the RMS, but we also care about the central value
- The question of "can we trust BCMs when they are noisy" is a separate question that Cameron is working on. For this analysis, we should exclude double -differences when they are noisy
- Status on the farm
- Robert is getting the output directories ready.
- How much space are we using in the web directory? Can we keep the PREX prompt, PREX respin, and CREX plots all at once? Robert will look into that
- I had forgotten to look into requesting more volatile space last week; should follow up this week
- Robert is getting the output directories ready.
- Path to migration to japan
- We won't wait on the migration to start the PREX-2 respin
- For CREX, we want JAPAN to do correlation/correction done on mini-run basis, BMW extractor
- Dithering analysis status & updates?
- Victoria is working on getting the "blessed" set of dithering slopes for all production runs
- Kent brings up doing a "residual correlation" analysis of the modulation asymmetry data, especially with the coil that was not used in getting the slopes
- Lagrange analysis
- Maybe merge this with dithering analysis in some way? At least for the sensitivity/slope evaluation. Cameron will take a look at connecting it into the dithering toolchain as an additional step.
- Other issues
- Tao asks if the combiner trees can have a summary tree too. I think that should be possible. It may need some of the changes in the data-exchange branch I'm working on, Tao has posted a Github issue (#248)
Other issues
- Let's aim at getting everything ready for a respin
by October 23soon.- We should have some understanding about the pedestal changes before we start
- We also need to have the "blessed" set of dithering slopes for all production runs
- We will use the same set of normalizing BCM as we used during the run
- Are we doing things to fix the analog BCM?
- Cameron has a function generator from J. Musson, to first check linearity at up to 150uA equivalent, but could also use it to check for the appearance on the noise in the BCMs
- The PREX-2 raw data has been moved to adaq2 disk; Paul should make a set-up script to analyze those runs on adaq
- Let's aim at getting everything ready for a respin
Present
Tao, Dmitri, Weibin, Devi, Ryan, Jinlong
Phone: Paul K., Cameron, Caryn, Ciprian, Devaki, Kent, Robert R., Sakib, Sangwha, Ye Tian, Siyu