WAC Notes December 15 2019

From PREX Wiki
Revision as of 21:00, 15 December 2019 by Cameronc (talk | contribs)
Jump to navigationJump to search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions

WAC Notes December 14 2019 << >> WAC Notes December 16 2019

December 15 2019

Daily Meeting BlueJeans

Production Run List - Slug 100 - pre-Production

  • Run 5477 - plots - Ca48 150uA

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

BCMs

  • Run 5474 is a current ramp for calibrating BCM Cav 4CQ, AT Rs, and SAM 7

Target/Energy Tolerances

Commissioning

Pedestals and Calibrations (respin first 4 slugs)

https://docs.google.com/spreadsheets/d/1mt39fCuIW3Pr8TO7fzhtFjmMFt4Op30jMm5wMQke6Xo/edit#gid=0

Committed: https://github.com/JeffersonLab/japan/commit/ddb956334b38acb124f67b1e841b5a02c761cc97

Other Status Updates

BMOD Ana

note regarding beammod analysis:

Running the BeamMod analysis for a single run.

From ~/PREX/prompt/bmodAna/ create a new beammod root file from the already prompted run (####) using command root -l -b -q bmodAna.C'(####,"max_input.list")'

then, to plot all combinations of alphas, deltas,and alpha/delta use the common root -l -b -q plotAD.C'("path/to/rootfile/created/by/the/previous/command.root")

Counting Mode Downstream Detectors