WAC Notes January 27 2020
From PREX Wiki
Jump to navigationJump to searchDocumentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes January 26 2020 << >> WAC Notes January 28 2020
January 27 2020
Daily Meeting BlueJeans
Production Run List - Slug 119 - IHWP OUT - Flip-RIGHT - Production
- Good - Run 5655 - Cut at 150k-170k to remove beam motion (caused by 120 uA running)
Non-Production Runs and Bad Runs
Pedestal/Calibrations Updates
- https://docs.google.com/spreadsheets/d/1mt39fCuIW3Pr8TO7fzhtFjmMFt4Op30jMm5wMQke6Xo/edit?usp=sharing
Issues
- Residual Aq correlation in HRS sometimes
- Large noise in RHRS main det (pedestal noise?)
- Low beam current
- Need calibrations again
- BCM sees noise off the Hall A laser sometimes -> how much, % of experiment data cut?