WAC Notes January 29 2020
From PREX Wiki
Revision as of 12:16, 30 January 2020 by Weibin (talk | contribs) (→Non-Production Runs and Bad Runs)
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes January 27 2020 << >> WAC Notes January 30 2020
January 29 2020
Daily Meeting BlueJeans
Production Run List - Slug 121 - IHWP OUT - Flip-RIGHT - Production
Non-Production Runs and Bad Runs
- Recover needed - Run 6035, sync problem
Pedestal/Calibrations Updates
- https://docs.google.com/spreadsheets/d/1mt39fCuIW3Pr8TO7fzhtFjmMFt4Op30jMm5wMQke6Xo/edit?usp=sharing
Issues
- FFB and orbit locks seem to be breaking, so there is no beam delivery for now
Updates
- New sign corrected Grand Agg plots have been added to the WAC toolchain (make_grand_plots.sh)
- We still need to do 1H01 BMOD tuning
- And we need to get a fresh calibration run (which will be relevant for all data taken with the NEW target)
- After that calibration run Ryan will likely move an AT or two (and need another calibration run)
- Cameron is trying to get bmw corrected data into the WAC chain