WAC Notes January 31 2020

From PREX Wiki
Revision as of 16:46, 1 February 2020 by Weibin (talk | contribs) (→‎Issues)
Jump to navigationJump to search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes January 30 2020 << >> WAC Notes February 1 2020

January 31 2020

Daily Meeting BlueJeans


Production Run List - Slug 121 - IHWP OUT - Flip-RIGHT - Production

continue slug 121 on January 29:



Production Run List - Slug 122 - IHWP IN - Flip-RIGHT - Production

start the new slug at ~ 7 am

continue slug 122 on February 1

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

BeamMod Commissioning calibration runs: 6076 - 6084

Issues

  • There are some issues in the injector, resulting in large bcm asym in two runs (6086, 6087)
  • run 6087: after cut, there are still some miniruns with large injector asym in asym_bpm2i01WS, should I cut them out?
  • quite large bcm asym (324 ppm) in run 6099, don't know why. the asym in injector asym_bpm2i01WS is quite large: -8.67 compare to grand average value (< 5ppm)

Updates