Difference between revisions of "20190213-Analyzer-Mtg"

From PREX Wiki
Jump to: navigation, search
(Bob's DAQ tasklist)
Line 14: Line 14:
 
== Agenda ==
 
== Agenda ==
 
#  New branch "operations"
 
#  New branch "operations"
#* Should be checked out as the production analyzer on adaq
+
#* PK: Should be checked out as the production analyzer on adaq
#* Only parameter file changes should go to this branch; all other development should be based on "develop"
+
#* PK: Only parameter file changes should go to this branch; all other development should be based on "develop"
#*
+
#* PK: once APEX goes into production and we have gone through all the calibrations we should push config changes back to develop
 
# online plots  
 
# online plots  
#*
+
#* WD: the map file seems to have been restored. Still woking to make sure it is ready for prime time.
 +
#* PK: we still are working on getting Japan to work with the double ET system.
 +
#* CG: we should keep the macro folder in panguin for configuration files only.
 
# regression analysis
 
# regression analysis
#*
+
#* PK: RR has all the 3 data handler classes working. Is now setting up configurations to run on prex data.
 
#  feedback
 
#  feedback
#*
+
#* PK: talked to Amali and showed her what Japan feedback is doing and pointed her to where she should be looking (including the epics communications class)
 +
#* PK: we will turn off the compilation of the feedback in the develop branch and have it working only in the operations branch.
 
# DAQ issues
 
# DAQ issues
#*  
+
#* Cleaning counting house crate
 +
#** PK: Cameron and I will take a look at it the week of the 24th Feb
 
# VQWK adcs
 
# VQWK adcs
#*
+
#* PK: Cameron replaced the VQK that had BPM 8 plugged in. And will meet with Chris Cuevas to talk about repair and testing.
 
# Pull requests:
 
# Pull requests:
#*
+
#* CG: please do NOT just merge a pull request by yourself. Wait for review.
 
# DAQ tasklist:
 
# DAQ tasklist:
#*  
+
#* CC: updated below
# PREX Collab Meeting talks
+
 
# Other issues
 
# Other issues
#* Item
+
#* Change to the PC HVs
#** comment
+
#** KP: create new feedback script and remove the +x from all the other scripts
  
 
== Bob's DAQ tasklist ==
 
== Bob's DAQ tasklist ==
Line 74: Line 77:
  
 
== Present ==
 
== Present ==
 
+
Cameron C, Robert R, Tao Y, Iris H, Ciprian G, Paul K, Ye T, Devi A, Kent P, Wouter D, Jinlong Z,
 
===Excused===
 
===Excused===
  
 
[[Category:Meetings]]
 
[[Category:Meetings]]
 
[[Category:Analyzer_Meeting]]
 
[[Category:Analyzer_Meeting]]

Revision as of 15:28, 13 February 2019

Back to Main Page >> Analyzer_Meeting

previous meeting << >> following meeting

Logistic information

Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  419 045 306
 Bluejeans link: https://bluejeans.com/419045306

Agenda

  1. New branch "operations"
    • PK: Should be checked out as the production analyzer on adaq
    • PK: Only parameter file changes should go to this branch; all other development should be based on "develop"
    • PK: once APEX goes into production and we have gone through all the calibrations we should push config changes back to develop
  2. online plots
    • WD: the map file seems to have been restored. Still woking to make sure it is ready for prime time.
    • PK: we still are working on getting Japan to work with the double ET system.
    • CG: we should keep the macro folder in panguin for configuration files only.
  3. regression analysis
    • PK: RR has all the 3 data handler classes working. Is now setting up configurations to run on prex data.
  4. feedback
    • PK: talked to Amali and showed her what Japan feedback is doing and pointed her to where she should be looking (including the epics communications class)
    • PK: we will turn off the compilation of the feedback in the develop branch and have it working only in the operations branch.
  5. DAQ issues
    • Cleaning counting house crate
      • PK: Cameron and I will take a look at it the week of the 24th Feb
  6. VQWK adcs
    • PK: Cameron replaced the VQK that had BPM 8 plugged in. And will meet with Chris Cuevas to talk about repair and testing.
  7. Pull requests:
    • CG: please do NOT just merge a pull request by yourself. Wait for review.
  8. DAQ tasklist:
    • CC: updated below
  9. Other issues
    • Change to the PC HVs
      • KP: create new feedback script and remove the +x from all the other scripts

Bob's DAQ tasklist

 TO-DO list for Parity DAQ
   updated Jan 4, 2019
Cameron & Bob: 1, 2, 4, 5, 6, 11, 12, 13
Tao & Cameron: 8, 9
Bob: 3, 6, 10
Cip, Cameron, Tao: 13  
1 Doing - Timing: mostly understood, still small mysteries (LNE)
2 Doing - Synchronization-check system. w/help from Ed Jastrzembski
3 Done - File naming, reset run num, finalize configs (INJ, CH, ALL) 
4 Done - Fix scalers on spectrometer crates.
5 To Do - Clean up cabling, labels, fasteners - First need to examine all signals
6 Clean up CRL -- eliminate so-called "dirty trick"
7 Check the 7200 scaler setup at injector, find a spare 7200.
8 Doing - Pedestal studies, aka cross-talk.  
9 Done - Test JAPAN. Need cable map & labels. Possibly maintain "pan" ?
10 Green Monster maintenance.
11 Doing - Test spares.  Repair bad modules.
12 Doing - Document everything.  Circuit diagrams, cable map, "how to".
13 Online software, a bit undefined since software is changing.
    (a) automatic production of run-dependent database
    (b) alarms like end-of-run voice (Bob)
    (c) feedback
    (d) coil-pulsing aka modulation aka dithering (Victoria)
    (e) panguin (GUI showing real-time plots)
    (f) prompt analysis
    (g) e-logbook entries 
    (h) archiving EPICs data
Accomplished
 * Revive all crates.
 * Deploy all ADCs needed and test each channel.
 * Build various DAQ configs with subsets of the DAQ crates.
 * Timing diagram, check timing of external signals and readout.
 * ET system upgrade, test rate limits, ensure deadtime zero.
 * Implement Bank structure.

Present

Cameron C, Robert R, Tao Y, Iris H, Ciprian G, Paul K, Ye T, Devi A, Kent P, Wouter D, Jinlong Z,

Excused