Difference between revisions of "20190213-Analyzer-Mtg"

From PREX Wiki
Jump to: navigation, search
(Created page with "Back to Main Page >> Analyzer_Meeting previous meeting << >> following meeting == Logistic informatio...")
 
(Bob's DAQ tasklist)
Line 44: Line 44:
 
  Bob: 3, 6, 10
 
  Bob: 3, 6, 10
 
  Cip, Cameron, Tao: 13   
 
  Cip, Cameron, Tao: 13   
  1 Timing: mostly understood, still small mysteries (LNE)
+
  1 Doing - Timing: mostly understood, still small mysteries (LNE)
  2 Synchronization-check system. w/help from Ed Jastrzembski
+
  2 Doing - Synchronization-check system. w/help from Ed Jastrzembski
  3 File naming, reset run num, finalize configs (INJ, CH, ALL)  
+
  3 Done - File naming, reset run num, finalize configs (INJ, CH, ALL)  
  4 Fix scalers on spectrometer crates.
+
  4 Done - Fix scalers on spectrometer crates.
  5 clean up cabling, labels, fasteners.
+
  5 '''To Do''' - Clean up cabling, labels, fasteners - First need to examine all signals
 
  6 Clean up CRL -- eliminate so-called "dirty trick"
 
  6 Clean up CRL -- eliminate so-called "dirty trick"
 
  7 Check the 7200 scaler setup at injector, find a spare 7200.
 
  7 Check the 7200 scaler setup at injector, find a spare 7200.
  8 Pedestal studies, aka cross-talk.   
+
  8 Doing - Pedestal studies, aka cross-talk.   
  9 Test JAPAN. Need cable map & labels. Possibly maintain "pan" ?
+
  9 Done - Test JAPAN. Need cable map & labels. Possibly maintain "pan" ?
 
  10 Green Monster maintenance.
 
  10 Green Monster maintenance.
  11 Test spares.  Repair bad modules.
+
  11 Doing - Test spares.  Repair bad modules.
  12 Document everything.  Circuit diagrams, cable map, "how to".
+
  12 Doing - Document everything.  Circuit diagrams, cable map, "how to".
 
  13 Online software, a bit undefined since software is changing.
 
  13 Online software, a bit undefined since software is changing.
 
     (a) automatic production of run-dependent database
 
     (a) automatic production of run-dependent database

Revision as of 14:06, 13 February 2019

Back to Main Page >> Analyzer_Meeting

previous meeting << >> following meeting

Logistic information

Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  419 045 306
 Bluejeans link: https://bluejeans.com/419045306

Agenda

  1. New branch "operations"
    • Should be checked out as the production analyzer on adaq
    • Only parameter file changes should go to this branch; all other development should be based on "develop"
  2. online plots
  3. regression analysis
  4. feedback
  5. DAQ issues
  6. VQWK adcs
  7. Pull requests:
  8. DAQ tasklist:
  9. PREX Collab Meeting talks
  10. Other issues
    • Item
      • comment

Bob's DAQ tasklist

 TO-DO list for Parity DAQ
   updated Jan 4, 2019
Cameron & Bob: 1, 2, 4, 5, 6, 11, 12, 13
Tao & Cameron: 8, 9
Bob: 3, 6, 10
Cip, Cameron, Tao: 13  
1 Doing - Timing: mostly understood, still small mysteries (LNE)
2 Doing - Synchronization-check system. w/help from Ed Jastrzembski
3 Done - File naming, reset run num, finalize configs (INJ, CH, ALL) 
4 Done - Fix scalers on spectrometer crates.
5 To Do - Clean up cabling, labels, fasteners - First need to examine all signals
6 Clean up CRL -- eliminate so-called "dirty trick"
7 Check the 7200 scaler setup at injector, find a spare 7200.
8 Doing - Pedestal studies, aka cross-talk.  
9 Done - Test JAPAN. Need cable map & labels. Possibly maintain "pan" ?
10 Green Monster maintenance.
11 Doing - Test spares.  Repair bad modules.
12 Doing - Document everything.  Circuit diagrams, cable map, "how to".
13 Online software, a bit undefined since software is changing.
    (a) automatic production of run-dependent database
    (b) alarms like end-of-run voice (Bob)
    (c) feedback
    (d) coil-pulsing aka modulation aka dithering (Victoria)
    (e) panguin (GUI showing real-time plots)
    (f) prompt analysis
    (g) e-logbook entries 
    (h) archiving EPICs data
Accomplished
 * Revive all crates.
 * Deploy all ADCs needed and test each channel.
 * Build various DAQ configs with subsets of the DAQ crates.
 * Timing diagram, check timing of external signals and readout.
 * ET system upgrade, test rate limits, ensure deadtime zero.
 * Implement Bank structure.

Present

Excused