20190213-Analyzer-Mtg

From PREX Wiki
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Back to Main Page >> Analyzer_Meeting

previous meeting << >> following meeting

Logistic information

Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  419 045 306
 Bluejeans link: https://bluejeans.com/419045306

Agenda

  1. New branch "operations"
    • Should be checked out as the production analyzer on adaq
    • Only parameter file changes should go to this branch; all other development should be based on "develop"
  2. online plots
  3. regression analysis
  4. feedback
  5. DAQ issues
  6. VQWK adcs
  7. Pull requests:
  8. DAQ tasklist:
  9. PREX Collab Meeting talks
  10. Other issues
    • Item
      • comment

Bob's DAQ tasklist

 TO-DO list for Parity DAQ
   updated Jan 4, 2019
Cameron & Bob: 1, 2, 4, 5, 6, 11, 12, 13
Tao & Cameron: 8, 9
Bob: 3, 6, 10
Cip, Cameron, Tao: 13  
1 Doing - Timing: mostly understood, still small mysteries (LNE)
2 Doing - Synchronization-check system. w/help from Ed Jastrzembski
3 Done - File naming, reset run num, finalize configs (INJ, CH, ALL) 
4 Done - Fix scalers on spectrometer crates.
5 To Do - Clean up cabling, labels, fasteners - First need to examine all signals
6 Clean up CRL -- eliminate so-called "dirty trick"
7 Check the 7200 scaler setup at injector, find a spare 7200.
8 Doing - Pedestal studies, aka cross-talk.  
9 Done - Test JAPAN. Need cable map & labels. Possibly maintain "pan" ?
10 Green Monster maintenance.
11 Doing - Test spares.  Repair bad modules.
12 Doing - Document everything.  Circuit diagrams, cable map, "how to".
13 Online software, a bit undefined since software is changing.
    (a) automatic production of run-dependent database
    (b) alarms like end-of-run voice (Bob)
    (c) feedback
    (d) coil-pulsing aka modulation aka dithering (Victoria)
    (e) panguin (GUI showing real-time plots)
    (f) prompt analysis
    (g) e-logbook entries 
    (h) archiving EPICs data
Accomplished
 * Revive all crates.
 * Deploy all ADCs needed and test each channel.
 * Build various DAQ configs with subsets of the DAQ crates.
 * Timing diagram, check timing of external signals and readout.
 * ET system upgrade, test rate limits, ensure deadtime zero.
 * Implement Bank structure.

Present

Excused