20190213-Analyzer-Mtg
From PREX Wiki
Back to Main Page >> Analyzer_Meeting
previous meeting << >> following meeting
Logistic information
Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 419 045 306 Bluejeans link: https://bluejeans.com/419045306
Agenda
- New branch "operations"
- Should be checked out as the production analyzer on adaq
- Only parameter file changes should go to this branch; all other development should be based on "develop"
- online plots
- regression analysis
- feedback
- DAQ issues
- VQWK adcs
- Pull requests:
- DAQ tasklist:
- PREX Collab Meeting talks
- Other issues
- Item
- comment
- Item
Bob's DAQ tasklist
TO-DO list for Parity DAQ updated Jan 4, 2019
Cameron & Bob: 1, 2, 4, 5, 6, 11, 12, 13 Tao & Cameron: 8, 9 Bob: 3, 6, 10 Cip, Cameron, Tao: 13 1 Doing - Timing: mostly understood, still small mysteries (LNE) 2 Doing - Synchronization-check system. w/help from Ed Jastrzembski 3 Done - File naming, reset run num, finalize configs (INJ, CH, ALL) 4 Done - Fix scalers on spectrometer crates. 5 To Do - Clean up cabling, labels, fasteners - First need to examine all signals 6 Clean up CRL -- eliminate so-called "dirty trick" 7 Check the 7200 scaler setup at injector, find a spare 7200. 8 Doing - Pedestal studies, aka cross-talk. 9 Done - Test JAPAN. Need cable map & labels. Possibly maintain "pan" ? 10 Green Monster maintenance. 11 Doing - Test spares. Repair bad modules. 12 Doing - Document everything. Circuit diagrams, cable map, "how to". 13 Online software, a bit undefined since software is changing. (a) automatic production of run-dependent database (b) alarms like end-of-run voice (Bob) (c) feedback (d) coil-pulsing aka modulation aka dithering (Victoria) (e) panguin (GUI showing real-time plots) (f) prompt analysis (g) e-logbook entries (h) archiving EPICs data Accomplished * Revive all crates. * Deploy all ADCs needed and test each channel. * Build various DAQ configs with subsets of the DAQ crates. * Timing diagram, check timing of external signals and readout. * ET system upgrade, test rate limits, ensure deadtime zero. * Implement Bank structure.