Difference between revisions of "CREXAuxiliaryMeasurements-Aug2020"
From PREX Wiki
(→Schedule) |
(→Schedule) |
||
(10 intermediate revisions by 2 users not shown) | |||
Line 60: | Line 60: | ||
|Swing (Devi/Siyu) | |Swing (Devi/Siyu) | ||
| Beam recovery and on to production on Ca-48. | | Beam recovery and on to production on Ca-48. | ||
− | | | + | | Compton rates too high, running straight. |
|- | |- | ||
|rowspan="3" | Wednesday Sept 16 | |rowspan="3" | Wednesday Sept 16 | ||
|Owl (Bishnu/Victoria) | |Owl (Bishnu/Victoria) | ||
| Production | | Production | ||
− | | | + | | Running straight. |
|- | |- | ||
|Day (Simona/Eric/B.Yale - standby) | |Day (Simona/Eric/B.Yale - standby) | ||
Line 71: | Line 71: | ||
| Cameron supporting the raster study remotely and Bob locally. | | Cameron supporting the raster study remotely and Bob locally. | ||
|- | |- | ||
− | |Swing (Devi/ | + | |Swing (Devi/Tao) |
− | | Complete raster and target study. | + | | Complete raster and target study. Production |
− | | | + | | No Compton. |
|- | |- | ||
|rowspan="3" | Thursday Sept 17 | |rowspan="3" | Thursday Sept 17 | ||
|Owl (Victoria/Siyu) | |Owl (Victoria/Siyu) | ||
| Production. | | Production. | ||
− | | | + | | No Compton. |
|- | |- | ||
|Day (Rom/Weibin) | |Day (Rom/Weibin) | ||
− | | Production | + | | Production. Pedestal scans, PITA scan. |
− | | | + | | No Compton. |
|- | |- | ||
|Swing (Zeke/Adam) | |Swing (Zeke/Adam) | ||
| Production | | Production | ||
− | | | + | | No Compton. |
|- | |- | ||
|rowspan="3" | Friday Sept 18 | |rowspan="3" | Friday Sept 18 | ||
|Owl (Victoria/Siyu) | |Owl (Victoria/Siyu) | ||
|6am '''SHUTDOWN''' | |6am '''SHUTDOWN''' | ||
− | | | + | | CREX1 is done! Long live CREX2! |
|- | |- | ||
|Day (Rom/Weibin) | |Day (Rom/Weibin) | ||
Line 142: | Line 142: | ||
== Detectors == | == Detectors == | ||
# <font color="blue">Linearity Studies (PITA + current scans)</font> | # <font color="blue">Linearity Studies (PITA + current scans)</font> | ||
− | #* These are ongoing - should continue regularly. | + | #* These are ongoing - should continue regularly. One more, on last day. |
− | + | ||
#* Current scans for detector and BCM pedestals. Skip the BPMs, I think. | #* Current scans for detector and BCM pedestals. Skip the BPMs, I think. | ||
# Linearity LED tests | # Linearity LED tests | ||
#* This will be studied post run, during SAD | #* This will be studied post run, during SAD | ||
− | #* detector crew were left off the SAD access list - | + | #* detector crew were left off the SAD access list - Access will be approved. Reapply for access. |
== Other == | == Other == | ||
− | # <font color=" | + | # <font color="green">Sign check, done</font> |
#* perform at next Moller polarimeter measurement | #* perform at next Moller polarimeter measurement | ||
− | #* run Moller, Compton, and parity DAQ for quick PITA scan | + | #* run Moller, Compton, and parity DAQ for quick PITA scan [https://docs.google.com/document/d/1hdunZgxLKpdrSaBtFsRHE31_419UgXvv1TqUAicKaps/edit] |
− | #<font color="blue">Target/Raster study</font> | + | # <font color="blue">Target/Raster study</font> |
#* Set up for normal production mode. Call in experts (Bob M in person, Cameron remote). | #* Set up for normal production mode. Call in experts (Bob M in person, Cameron remote). | ||
#* With each raster change we start with a brief C12 run for safety, then do a brief Ca48 run. | #* With each raster change we start with a brief C12 run for safety, then do a brief Ca48 run. | ||
Line 159: | Line 158: | ||
== Moller polarimetry == | == Moller polarimetry == | ||
− | # <font color=" | + | # <font color="green">One more measurement, done [https://logbooks.jlab.org/entry/3849466], [https://logbooks.jlab.org/entry/3849477] </font> |
== Compton polarimetry == | == Compton polarimetry == | ||
− | # <font color=" | + | # <font color="green">Spectrum run</font> |
− | # <font color=" | + | # <font color="red">Laser polarization changes - aborted</font> |
# <font color="blue">linearity studies</font> During SAD | # <font color="blue">linearity studies</font> During SAD |
Latest revision as of 17:27, 16 September 2020
CREX Main << August 2020 CREX Run Plan
Contents
Schedule
- This plan is evolving as we move along
Day, Date | Shift | Tasks (Responsible Party) | Comments/Status |
---|---|---|---|
Saturday Sept 12 | Owl | Production | DONE |
Day | Production | DONE | |
Swing (Zeke/Pitt) | Production | DONE | |
Sunday Sept 13 | Owl (Adam/Tao) | Production. | (No scans done.) 39 min ABU! |
Day (Bob/Eric) | Final Q2 measurement. Optics [1] | Acc mostly down; Bob took escorted access and switched to Counting Mode | |
Swing (Zeke/Pitt) | Optics [2] | Sanghwa for Analysis and remote assistance. Mostly completed optics. | |
Monday Sept 14 | Owl (Adam/Amali) | Inelastic spectrum. Poletip study [3] | Chandan for Analysis and remote assistance. Finished optics, inelastic spectrum, poletip study |
Day (Thia/Bob) | 10am - noon Beam studies 1: Hall in Controlled Access (CA) - Install blind At PMT, Blind main Detector; noon - 4:15pm Beam available to ready Halls - we take data with blinded tubes. | Devi required for tube blinding | |
Swing (Weibin/Eric, Devi on-call) | 4:15pm - 8:15pm Beam studies 2: Hall in CA - restore US PMTs, Compton e-Det work; 8:15pm - 9:15pm Beam recovery and onward delivery. Production. | ||
Tuesday Sept 15 | Owl (Adam/Amali) | Pedestal Scans, PITA scan. Production. | |
Day (Rom/Eric) | SAD Safety Meeting 9-11am https://primetime.bluejeans.com/a2m/live-event/tkcbphay ; Production if beam available | 7:45am South Linac down, cold box trip in CHL1, recovery 11.5 hours | |
Swing (Devi/Siyu) | Beam recovery and on to production on Ca-48. | Compton rates too high, running straight. | |
Wednesday Sept 16 | Owl (Bishnu/Victoria) | Production | Running straight. |
Day (Simona/Eric/B.Yale - standby) | 8am start Moller measurement. Sign check. Followed by raster and Target study | Cameron supporting the raster study remotely and Bob locally. | |
Swing (Devi/Tao) | Complete raster and target study. Production | No Compton. | |
Thursday Sept 17 | Owl (Victoria/Siyu) | Production. | No Compton. |
Day (Rom/Weibin) | Production. Pedestal scans, PITA scan. | No Compton. | |
Swing (Zeke/Adam) | Production | No Compton. | |
Friday Sept 18 | Owl (Victoria/Siyu) | 6am SHUTDOWN | CREX1 is done! Long live CREX2! |
Day (Rom/Weibin) | ----- |
Optics and Q2
- Q2 measurement (Done)
- Repeat of Q2 measurement, with improved pedestal noise control.
- Detector counting mode.
- S0 trigger
- production raster and beam position
- Optics Data (Done)
- Sieve IN, dp=+1, 0, (maybe -1). Raster/no raster thin C, raster H20
- Priority is 1 dp change (both arms!) plus backout, and 10 runs. Watercell runs should be long.
- Assume 3 hours for magnet changes and 2 hours for data taking. ~ 1 shift
- See grid on optics data spreadsheet
- Energy Measurement (Done)
- Doug did a parasitic energy measurement Sun, Sep 13 at 20:24 [4].
Backgrounds
- Blinded At PMTs (Done)
- Longish access to setup and back out, but short data taking period (production conditions).
- Reconfigure AT PMTs to use blinding cap, attach to US PMTs.
- This will be done during the long beam studies break on Monday
- software blinding on the AT PMTs must be disabled
- Check pedestal noise in counting and in integrating mode. We need low noise is the blinded tube, and we can't add noise to our main detector!
- Integrating measurement for asymmetry measurement
- (Do we want counting mode measurement for rate in blinded At tube?)
- (yield only normalizable using table-gain gain curves).
- Blinded Main detector? (Done)
- Need 2 hours to blind main detectors. Then another hour after meaurement to unblind.
- short-ish yield runs in integrating mode.
- Software blinding must be disabled on the blinded MD tubes for this study
- short counting mode run to get relative rate
- Then return. Keep AT blinded piggybacked for asymmetry measurement.
- Inelastic spectrum scan (Done)
- Needs a detailed run plan
- Counting mode. Current 0.5uA or so? Turn quartz HV off.
- Measure dp spectrum form dp=nominal to dp=-25%, in 5% steps. Use LHRS only.
- should scale all spectrometer magnets (including septum)
- Pole tip re-scattering (Done)
- Counting mode (VDC tracking). Counting mode on detector is ok (and helpful) but not needed.
- Q3 turned off.
- Run three septum setpoints: nominal, -5%, and +5%. Need ~1M S0 trigger events per run (and more is better).
Detectors
- Linearity Studies (PITA + current scans)
- These are ongoing - should continue regularly. One more, on last day.
- Current scans for detector and BCM pedestals. Skip the BPMs, I think.
- Linearity LED tests
- This will be studied post run, during SAD
- detector crew were left off the SAD access list - Access will be approved. Reapply for access.
Other
- Sign check, done
- perform at next Moller polarimeter measurement
- run Moller, Compton, and parity DAQ for quick PITA scan [5]
- Target/Raster study
- Set up for normal production mode. Call in experts (Bob M in person, Cameron remote).
- With each raster change we start with a brief C12 run for safety, then do a brief Ca48 run.
- Raster Scan Run Plan
Moller polarimetry
Compton polarimetry
- Spectrum run
- Laser polarization changes - aborted
- linearity studies During SAD