Difference between revisions of "Check-list For taking Counting runs and Going back to Production"
From PREX Wiki
Line 2: | Line 2: | ||
** Turn '''ON S0 and S3''' ('''L0.0, L0.1, L0.2, L0.3, L0.4''' in both arm's HV GUI) | ** Turn '''ON S0 and S3''' ('''L0.0, L0.1, L0.2, L0.3, L0.4''' in both arm's HV GUI) | ||
** For '''Raster Check in C-Hole''' | ** For '''Raster Check in C-Hole''' | ||
− | *** Ask low current <2uA such that '''T1 rate < | + | *** Ask low current <2uA such that '''T1 rate <100kHz''' |
*** Ask for appropriate raster size and position lock as in '''WHITE BOARD''' | *** Ask for appropriate raster size and position lock as in '''WHITE BOARD''' | ||
*** Follow [[HVgui | Checking the HV]] HOW TOs for shift crew if you need to | *** Follow [[HVgui | Checking the HV]] HOW TOs for shift crew if you need to | ||
Line 8: | Line 8: | ||
** For '''Detector alignment Check''' | ** For '''Detector alignment Check''' | ||
*** Ask for low current (0.3uA on Ca-48 target) | *** Ask for low current (0.3uA on Ca-48 target) | ||
− | *** make sure the '''T1 rate is ~ | + | *** make sure the '''T1 rate is ~200kHz''' |
*** turn '''ON VDC''' ('''L6.0, L6.3''' in LHRS and '''L4.5, L4.7''' in RHRS) if the T1 rate is good | *** turn '''ON VDC''' ('''L6.0, L6.3''' in LHRS and '''L4.5, L4.7''' in RHRS) if the T1 rate is good | ||
*** set Downstream MAIN detectors HV to '''-1900V''' ('''L1.1 in both arms'''), and turn them ON | *** set Downstream MAIN detectors HV to '''-1900V''' ('''L1.1 in both arms'''), and turn them ON |
Revision as of 15:02, 5 February 2020
- Before taking Counting Runs:
- Turn ON S0 and S3 (L0.0, L0.1, L0.2, L0.3, L0.4 in both arm's HV GUI)
- For Raster Check in C-Hole
- Ask low current <2uA such that T1 rate <100kHz
- Ask for appropriate raster size and position lock as in WHITE BOARD
- Follow Checking the HV HOW TOs for shift crew if you need to
- You can start runs once the position and HV read-back are settled
- For Detector alignment Check
- Ask for low current (0.3uA on Ca-48 target)
- make sure the T1 rate is ~200kHz
- turn ON VDC (L6.0, L6.3 in LHRS and L4.5, L4.7 in RHRS) if the T1 rate is good
- set Downstream MAIN detectors HV to -1900V (L1.1 in both arms), and turn them ON
- once the position and HV read-back are settled, take runs
- follow Taking MAIN detector Counting Run if you need to analyse data
- Once you are done with counting Runs:
- Turn OFF S0, S3, Downstream MAIN detectors, and VDCs and set Downstream MAIN detectors HV to 0.0V
- Ask for high current (production) only after turning OFF the detectors mentioned in the previous step