Check-list For taking Counting runs and Going back to Production
From PREX Wiki
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
- Before taking Counting Runs:
- Ask for low current (0.3uA for Ca-48 target for detector alignment check and <2uA for C-Hole raster check)
- Turn ON S0 and S3 (L0.0, L0.1, L0.2, L0.3, L0.4 in both arm's HV GUI). Follow HVgui in wiki howto if you need to
- For Raster check on C-Hole, you can start runs once the position and HV read-back are settled
- For Detector alignment Check,
- make sure the T1 rate is ~200k
- turn ON VDC (L6.0, L6.3 in LHRS and L4.5, L4.7 in RHRS) if the T1 rate is good
- set Downstream MAIN detectors HV to -1900V (L1.1 in both arms), and turn them ON
- once the position and HV read-back are settled, take runs
- Once you are done with counting Runs:
- Turn OFF S0, S3, Downstream MAIN detectors, and VDCs and set Downstream MAIN detectors HV to 0.0V
- Ask for high current only after turning OFF the detectors mentioned in the previous step