Back to Main Page >> DAQ Documentation Portal >> DAQ Meetings
previous meeting << >> following meeting
Contents
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 475 839 391 Bluejeans link: https://bluejeans.com/475839391
Agenda
- Bob : Replace bad NIM crate with new one and ensure that original functionality is still there, including the delayed T_Settle output to the STR7200 Scaler
- Bob : Get Bank data structure incorporated in Prex_ts_banks.crl functionality
Minutes
- Replace NIM crate in Injector Parity DAQ
- We replaced the bad NIM crate with a new one from Riad
- We noted the wires and put everything back
- We also restored the T_Settle delayed-to-STR7200 module
- The delay offset is not behaving as expected when twisting knobs - Ask Paul King
- Run 4122 is an Injector.crl run in TI-standalone triggering mode
- Run 4123 is another - data looks good in both
- Check if the helicity signal looks good
- Amali's notes for checking helicity signal -
- Adding in Bank structures to Prex_ts_banks.crl
- Bob says that putting a bank around groups of similar modules is fine, rather than having a bank per individual module
- This could get complicated for the current configuration that has some conditional flags determining which modules are read for the same old-style header