May 4th, 2019 Testers: Cameron Clarke

Status

  • Test new 7200 scaler
  • Add HAPTB to INJ

New 7200

  • I finished testing the 7200 in the injector (straight swap) - it works - run 2153
  • I set the original one back in after - still works (run 2154)

INJ HAPTB

  • I added a HAPTB to INJ crate - it hasn't been configured yet, should match CH when done
    • I added 16 bit DAC connection into vqwk_10_05 channel
    • HAPTB Tsettle LNE required splitting the SIS3801's VETO into a 726 trans - looks good on scope...