May 4th, 2019 Testers: Cameron Clarke
Status
- Test new 7200 scaler
- Add HAPTB to INJ
New 7200
- I finished testing the 7200 in the injector (straight swap) - it works - run 2153
- I set the original one back in after - still works (run 2154)
INJ HAPTB
- I added a HAPTB to INJ crate - it hasn't been configured yet, should match CH when done
- I added 16 bit DAC connection into vqwk_10_05 channel
- HAPTB Tsettle LNE required splitting the SIS3801's VETO into a 726 trans - looks good on scope...