DAQ Testing and Commissioning Run List
This is a compilation of runs taken during testing and commissioning of the DAQ before Prex/Crex
Summer 2018
Run list - Cameron and Chandan | |||||
---|---|---|---|---|---|
Day | Run Number | Purpose | |||
July 28 2018 | 4040-4067 | Testing R HRS ADC Channels | |||
July 29 2018 | 4068-4104 | Testing L and R HRS ADC Channels | |||
and Counting House channel debugging | |||||
July 30 2018 | 4107-4115 | Fixed control.db, Counting House channel debug | |||
4116-4121 | Replaced bad vqwk ADCs in counting house crate |
Fall 2018
Run list - Cameron, Ye, Bob | |||||
---|---|---|---|---|---|
Day | Run Number | Purpose | |||
October 23 2018 | 4444-4465 | Cameron tests ET deatime | |||
October 24 2018 | 4473-4501 | Cameron tests ET deatime | |||
October 29 2018 | 4503-4528 | Cameron tests ET deatime | |||
November 1 2018 | 4533-4542 | Cameron and Ye check on cavity ADC signals | |||
November 2 2018 | 4548-4554 | Cameron tests ET deatime | |||
November 5 2018 | 4556-4566 | Cameron tests ET deatime | |||
November 6 2018 | 4568 | Cameron and Bob test injector timing | |||
November 11 2018 | Injector: Paul King adjusts FLEXIO timing | ||||
Injector: Caryn fixes control.db | |||||
November 14 2018 | 4611-4614 | Injector: Cameron checks on SIS3801 timing | |||
4615-4617 | Counting House: Ye and Cameron test CntHouse ADCs again | ||||
November 21 2018 | 4631-4642 | MCC High Current test HALOG | |||
November 27 2018 | 4662-4680 | Cameron tests Injector timing delays (4663 helicity benchmark) | |||
December 2 2018 | 4685-4695 | Cameron tests Injector timing delays (4686 helicity benchmark) | |||
December 3 2018 | 4669-4700 | Cameron tests CntHouse ET deadtime (4700 is a long benchmark run, no beam) | |||
December 5 2018 | 4706-4742 | Cameron tests CntHouse ET deadtime (4742 is a benchmark run, no beam) | |||
December 17 2018 | 4776-4812 | Cameron tests CntHouse ET deadtime, makes conclusions | |||
December 19 2018 | 4813-4817 | Cameron tests Banked CRL in injector timing, and BMW commissioning | |||
December 21 2018 | 4818-4822 | Cameron tests new RHRS scaler in PREX config, reads data, incorrectly |
Spring 2019
There was a change of configs, now we have all Banked configs and reset the run number to 1000
Run list - Cameron, Ye, Bob, Tao | |||||
---|---|---|---|---|---|
Day | Run Number | Purpose | |||
January 15 2019 | 1017-1031 | Cameron and Tao test synchronization monitor | |||
January 18 2019 | 1032-1036 | Cameron tests pedestals with 1.6 V battery in ADC channels | |||
January 22 2019 | 1039-1044 and 1098 | Testing synch monitor with new setup with Paul King | |||
January 22 2019 Swing | 1045-1097 | Injector PQB Studies | |||
January 23 2019 | 1100-1104 | Testing JAPAN ET online connection and BMW FLEXIO functionality | |||
February 1-3 2019 | 1105-1192 | Injector studies | |||
February 04 2019 | 1193 | Testing CODA, JAPAN, PANGUIN, and compiled analysis scripts + SAM channel noise floors | |||
February 05 2019 | 1194-1198 | Establishing standard DAQ procedure and HV GUI | |||
February 06 2019 | 1199-1211 | Testing SAMs and ET | |||
February 07 2019 | TEDf Test Stand | Initiating the TEDf test stand | |||
February 12 2019 | Debugging the HelBoard | ||||
February 13 2019 | Debugging the HelBoard and ADC Testing in TEDf stand | ||||
March 14 2019 | Understanding Beam Sync some, cataloging understanding of helicity control | ||||
March 22 2019 | ET Speed limit tests | ||||
April 04 2019 | Documenting DAQ from APEX setup | ||||
April 29 2019 | 2094-2101 | Updating INJ DAQ to fix STR 7200 and SIS3801 signals |