Difference between revisions of "DAQ Testing/20181111"

From PREX Wiki
Jump to: navigation, search
Line 3: Line 3:
 
[[File:Timing-Injector-Flexio-11-11-2018.png|frame|Old-Example Timing Diagram, Injector, FLEXIO - Contains all Helicity Signals]]
 
[[File:Timing-Injector-Flexio-11-11-2018.png|frame|Old-Example Timing Diagram, Injector, FLEXIO - Contains all Helicity Signals]]
  
[[DAQ_Testing/20181106|Previous Day of Testing]] << >> [[DAQ_Testing/20181112|Next Day of Testing]]
+
[[DAQ_Testing/20181106|Previous Day of Testing]] << >> [[DAQ_Testing/20181114|Next Day of Testing]]
  
 
November 6th, 2018
 
November 6th, 2018

Revision as of 21:00, 14 November 2018

Back to Main Page >> DAQ Documentation Portal >> DAQ Testing >> DAQ Commissioning Notes

Old-Example Timing Diagram, Injector, FLEXIO - Contains all Helicity Signals

Previous Day of Testing << >> Next Day of Testing

November 6th, 2018 Testers: Bob, Cameron, Paul King, Amali

See Today's Meeting Notes

Goals

Fix the timing in the FLEXIO so that it latches LNE after the events are read out (at least ~1us after Tstable, can use 112 VQweak wait signal) instead of right at Tstable as it was

FLEXIO Scaler

New setting, delays FLEXIO latch LNE

The FLEXIO scaler is used to count all of the helicity related information in 4 input channels, with a 100 us delayed (50 ns long) Tstable used to latch LNE, needed to correct helicity sequence errors

  • Channel 0 = HEL+
  • Channel 1 = HEL-
  • Channel 2 = MPS/QRT/MultiSync
  • Channel 4 = Pair Sync
  • All channels are the standard helicity information with no surprises
  • New-Timing Diagram, Injector, FLEXIO

Was, as of 11/6/2018 test

The FLEXIO scaler is used to count all of the helicity related information in 4 input channels, with Tstable was used to latch LNE

  • Channel 0 = HEL+
  • Channel 1 = HEL-
  • Channel 2 = MPS/QRT/MultiSync
  • Channel 4 = Pair Sync
  • All channels are the standard helicity information with no surprises
  • Old-Timing Diagram, Injector, FLEXIO

Results

  • We changed the FLEXIO latch LNE to be delayed until after the prior event was read out, adding a new delayed Tsettle with a 100 us delay and 50 ns gate length (irrelevant).

To Do

  • It turns out that the timing diagram for the SIS3801 appears to conflict with the readouts, in that it looks like the SIS3801 is reading the current event (like the FLEXIO has now been changed to be, when it is supposed to be reading the prior one.
  • We should double check the old timing diagram and fix the delay if the drawing was drawn wrong, and figure out what is going on with the helicity information if the drawing is correct (since it seems to be behaving differently).