=== Timing Scans === | === Timing Scans === | ||
− | https://logbooks.jlab.org/entry/3689855 | + | Initial https://logbooks.jlab.org/entry/3689855 |
+ | |||
+ | Ramp delay verification https://logbooks.jlab.org/entry/3698934 | ||
+ | |||
+ | Ideal integration gate verification https://logbooks.jlab.org/entry/3698695 | ||
=== Restored timing, updated to be safer === | === Restored timing, updated to be safer === |
Latest revision as of 17:56, 5 July 2019
Back to Main Page >> DAQ Documentation Portal >> DAQ Testing >> DAQ Commissioning Notes
Previous Day of Testing << >> Next Day of Testing
June 18th, 2019 Testers: Cameron Clarke, Paul King, Catherine Feldman
Status
- Doing timing scans of the 4 modes, 240 120 free and beam sync
Timing Scans
Initial https://logbooks.jlab.org/entry/3689855
Ramp delay verification https://logbooks.jlab.org/entry/3698934
Ideal integration gate verification https://logbooks.jlab.org/entry/3698695