GEM Meeting/20190531
From PREX Wiki
Jump to navigationJump to searchThe printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Back to Main Page >> GEM_Meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 998 903 0149 Bluejeans link: https://bluejeans.com/9989030149
Agenda
- Chandan: The seventh GEM is working. The TreeSearch and PREX-counting repositories are installed on a-onl account. DAQ is working upto 450 Hz.
- Bob: Is the rate limit from FADC or MPD? For production data we will take data using mode 9.
- Chandan: Not sure, Will check.
- Dustin: Jack said the Ar/CO2 mixture can change within few percent. The pressure can change a bit.
- Seamus: May not be a problem if we monitor the flow rate when we will use the GEM detectors.
- Bob: Can we calibrate the pedestal of GEM detectors and getrid-off unnecessary data.
- Seamus: May not be possible with current MPD resources.
- Seamus: ISU, SBU and UVa group should come up with run plan - Pedestal, efficiency, etc.
- Dustin: Will try to be comeup with a run plan
- Nilanga: Do we have online scripts?
- Seamus: TreeSearch and PREX-counting repository is already installed on the aonl accounts.
Minutes
Present
Dustin, Bryan, Ye Tian, Chandan, Ryan, Seamus, Devi, Siyu, Bob Michaels, Nilanga