PREX/CREX Monday, February 9, 2015 3:00pm EDT
From PREX Wiki
Jump to navigationJump to searchLink to the Meeting page PREX/CREX Teleconferences
Last meeting: PREX/CREX Monday, January 26, 2015 3:00pm EDT
The teleconference info is as follows:
Phone #: +1-888-240-2560 or +1-408-740-7256 and See International Numbers Code: 174599135
Agenda
- Optics update by Seamus elog-2966
Present:
Lorenzo,Ciprian,Rakitha, Nickie, KK, Dustin, Kent, Guido, Seamus
Minutes
Optics update
- Preliminary conclusions from this study,
- The CREX target needs to be placed 30 cm from the current PREX target position in order to get 4 deg scattered into the acceptance.
- We can use the same PREX septum for CREX tune with updated CREX target position
- Optics group (Guido, Seamus and Nickie) are looking further into optics tune for CREX
- The elog 2966 shows the PREX tune from the simulation in attachment 1
- The CREX tune with PREX septum and 30 cm upstream target location is shown in the attachment 2
- In the attachment 3 the data is in black and green and red curves are from two different simulations
- The tails in the x and y distributions from simulation but not seen with PREX data needs to be understood
- In the plots the x axis is the dispersion axis
From Last week
- Check the PREX beam dump - Lorenzo and Rakitha
- We may not need to keep tracks after about 3 m into the dump therefore we could add kryptonite
Misc.
- Beam parasitic studies needs a to-do list
TO DO Lists
- It would be nice to have real-time viewer for optics studies in commissioning (disussed in 01/16/2014 meeting)