PREX/CREX Monday, September 14, 2015 2:00pm EDT
From PREX Wiki
Jump to navigationJump to searchLink to the Meeting page PREX/CREX Teleconferences
Last meeting: PREX/CREX Thursday, September 3, 2015 3:00pm EDT
The teleconference info is as follows:
Phone #: +1-888-240-2560 or +1-408-740-7256 and See International Numbers Code: 174599135
Agenda
Present:
Kent, KK, Dustin, Seamus, Tyler, Nickie, Ciprian, Rakitha, Bob
Minutes
- A CAD step file is available with PREX target ladder and scattering chamber designed according to our simulation geometry elog-2999
- Tentative time for beam studies would be later November.
- What are possible targets and maximum beam current
- Beam current is set probably due to limit the radiation damage to the DVSC-ECAL
- Kent and KK will talk to Charles about this
- Dustin will estimates expected rates and lumi widths
- Dustin will talk to Ed about setting up a gas supply for Lumi
- We will need a task list with priorities - Kent
- Moller studies
- DAQ needs - for now we will have 16 VQWK channels and 16 HAPPEX ADC channels
- How many pre-amps we need
- How many ADC channels we need
- How many BPM/BCM would be available
- What are the cabling needs
- What helicity rate we will run? start with 120 or 240 Hz but we would like to go to 960 Hz
- We will need delayed helicity reporting
- PAN and online analyzer needs to be ready by the time of beam studies : we will need more man power for this
- Bob and Rakitha will work on setting up the Injector DAQ
Misc.
- Beam parasitic studies needs a to-do list
TO DO Lists
- It would be nice to have real-time viewer for optics studies in commissioning (disussed in 01/16/2014 meeting)