PREX-CREX-2017ERR
From PREX Wiki
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Overview
The PREX and C-REX Experiments
2016 Experimental Readiness Review
Experimental Readiness Review 2017
Time and Location
Draft Agenda (talks)
8:00 | Closed Session | |
8:20 | Remarks from Chair and Charge | Chair |
8:30 | Overview of Preparations (Charge Items 1 & 9) (TBA) | Kent Paschke (25+15) |
9:10 | Summary of Recommendations (TBA) | Seamus Riordan (20+10) |
9:40 | Radiation (Charge Item 8) (TBA) | Kent Paschke (25+15) |
10:20 | Break | |
10:50 | Septum Magnet, new HRS Quads (Charge Items 4 & 5) (TBA) | Juliette Mammei (15+10) |
11:15 | Beam (Charge Items 5 & 7) (TBA) | Yves Roblin (12+8) |
11:35 | Working Lunch | |
13:00 | PREX and CREX Targets (Charge Item 2) (TBA) | Seamus Riordan (20+10) |
13:30 | Target Chamber (TBA) | Silviu Covrig (20+10) |
14:00 | Hall Configuration and Design Status (Charge Item 6) (TBA) | Robin Wines (20+10) |
14:30 | Equipment Installation Plan (Charge Items 1, 9, 10) (TBA) | Jessie Butler (20+10) |
15:00 | Documentation (Charge Items 6, 10, 11) (SafetyDoc.pdf) | Robert Michaels (10+5) |
Draft of COO (PREX-CREX-COO.pdf) | ||
Draft of ERG (PREX-CREX-ERG.pdf) | ||
Draft of ESAD (PREX-CREX-ESAD.pdf) | ||
RSAD (RSAD_PREX_CREX.doc) | ||
RSAD Budget Form (RSAD_Budget_Form_PREXII.pdf) | ||
PREX-I Septum OSP (Septum_PREX_osp.docx) | ||
Draft OSP for targets (TBA) | ||
Draft OSP for collimator (Collimator_osp.docx) | ||
Draft OSP for shielding (Shielding_osp.docx) | ||
Draft OSP for detectors (Detector_osp.docx) | ||
Old OSP for Moller Polarimeter (MollerUpgrade_OSP.pdf) | ||
Old OSP for Moller Polarimeter (MollerUpgrade_OSP.pdf) | ||
15:15 | Closed Session | |
17:00 | Close Out |