PREX-CREX-2017ERR
From PREX Wiki
Contents
Overview
The PREX and C-REX Experiments
2016 Experimental Readiness Review
Results of ERR 2017
The bottom line is that we are "ready" and can submit a beam time request. Indeed, one was submitted on July 28, 2017.
- ERR 2017 Committee report June 14, 2017: (Committee Report).
- Our response to the report's questions (Collaboration Response)
- Final response to our response (pdf)
Experimental Readiness Review 2017
Time and Location
Helpful Documents
- Experiment Design Document (pdf)
- Report from 2016 ERR (report)
- Run plan from PREX-I (serves as example, will be updated) (RunPlan) and (DailyPlan)
Agenda (talks)
8:00 | Closed Session | |
8:20 | Remarks from Chair and Charge | Chair |
8:30 | Overview of Preparations (Charge Items 1 & 9) (pdf) | Kent Paschke (25+15) |
9:10 | Summary of Recommendations (pdf) | Seamus Riordan (20+10) |
9:40 | Radiation (Charge Item 8) (pdf) | Kent Paschke (30+15) |
10:25 | Break | |
10:55 | Septum Magnet, new HRS Quads (Charge Items 4 & 5) (pdf) | Juliette Mammei (15+10) |
11:20 | Beam (Charge Items 5 & 7) (pptx ) (pdf ) | Yves Roblin (12+8) |
11:40 | Working Lunch | |
13:00 | PREX and CREX Targets (Charge Item 2 and 3) (pdf) | Seamus Riordan (20+10) |
13:30 | Target Chamber (Charge Item 2 and 3) (tgtchamber_err2_17may2017.pdf) | Silviu Covrig Dusa (20+10) |
14:00 | Hall Configuration and Design Status (Charge Item 6) (prex-crex-err2017-rw.pdf) | Robin Wines (20+10) |
14:30 | Equipment Installation Plan (Charge Items 1, 9, 10) (PREXIIERR_Installation_JButler.pdf) (schedule) | Jessie Butler (20+10) |
15:00 | Documentation (Charge Items 6, 10, 11) (SafetyDoc.pdf) | Robert Michaels (10+5) |
Draft of COO (PREX-CREX-COO.pdf) | ||
Draft of ERG (PREX-CREX-ERG.pdf) and Chart (ERG_chart.pdf) | ||
Draft of ESAD (PREX-CREX-ESAD.pdf) | ||
RSAD (RSAD_PREX_CREX.doc) | ||
RSAD Budget Form (RSAD_Budget_Form_PREXII.pdf) | ||
PREX-I Septum OSP (Septum_PREX_osp.docx) | ||
Draft OSP for targets (Target_osp.docx) | ||
Draft OSP for collimator (Collimator_osp.docx) | ||
Draft OSP for shielding (Shielding_osp.docx) | ||
Draft OSP for detectors (Detector_osp.docx) | ||
OSP for Moller Polarimeter (MollerOSP.pdf) | ||
LOSP for Compton Polarimeter (halla_compton_losp.pdf) | ||
15:15 | Closed Session | |
17:00 | Close Out |