PREX-CREX-2017ERR

From PREX Wiki
Revision as of 16:36, 31 July 2017 by Rom (Talk | contribs) (Results of ERR 2017)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Overview

The PREX and C-REX Experiments

2016 Experimental Readiness Review

Results of ERR 2017

The bottom line is that we are "ready" and can submit a beam time request. Indeed, one was submitted on July 28, 2017.

Experimental Readiness Review 2017

Time and Location

  • Date: 17 May 2017 (Wednesday)
  • Location: JLab CEBAF F326/327
  • ERR Charge (pdf)
  • ERR Committee (docx)

Helpful Documents

  • Experiment Design Document (pdf)
  • Report from 2016 ERR (report)
  • Run plan from PREX-I (serves as example, will be updated) (RunPlan) and (DailyPlan)

Agenda (talks)

8:00 Closed Session
8:20 Remarks from Chair and Charge Chair
8:30 Overview of Preparations (Charge Items 1 & 9) (pdf) Kent Paschke (25+15)
9:10 Summary of Recommendations (pdf) Seamus Riordan (20+10)
9:40 Radiation (Charge Item 8) (pdf) Kent Paschke (30+15)
10:25 Break
10:55 Septum Magnet, new HRS Quads (Charge Items 4 & 5) (pdf) Juliette Mammei (15+10)
11:20 Beam (Charge Items 5 & 7) (pptx ) (pdf ) Yves Roblin (12+8)
11:40 Working Lunch
13:00 PREX and CREX Targets (Charge Item 2 and 3) (pdf) Seamus Riordan (20+10)
13:30 Target Chamber (Charge Item 2 and 3) (tgtchamber_err2_17may2017.pdf) Silviu Covrig Dusa (20+10)
14:00 Hall Configuration and Design Status (Charge Item 6) (prex-crex-err2017-rw.pdf) Robin Wines (20+10)
14:30 Equipment Installation Plan (Charge Items 1, 9, 10) (PREXIIERR_Installation_JButler.pdf) (schedule) Jessie Butler (20+10)
15:00 Documentation (Charge Items 6, 10, 11) (SafetyDoc.pdf) Robert Michaels (10+5)
Draft of COO (PREX-CREX-COO.pdf)
Draft of ERG (PREX-CREX-ERG.pdf) and Chart (ERG_chart.pdf)
Draft of ESAD (PREX-CREX-ESAD.pdf)
RSAD (RSAD_PREX_CREX.doc)
RSAD Budget Form (RSAD_Budget_Form_PREXII.pdf)
PREX-I Septum OSP (Septum_PREX_osp.docx)
Draft OSP for targets (Target_osp.docx)
Draft OSP for collimator (Collimator_osp.docx)
Draft OSP for shielding (Shielding_osp.docx)
Draft OSP for detectors (Detector_osp.docx)
OSP for Moller Polarimeter (MollerOSP.pdf)
LOSP for Compton Polarimeter (halla_compton_losp.pdf)
15:15 Closed Session
17:00 Close Out