PREX-CREX-2017ERR
From PREX Wiki
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Overview
The PREX and C-REX Experiments
2016 Experimental Readiness Review
Results of ERR 2017
The bottom line is that we are "ready" and can submit a beam time request. Indeed, one was submitted on July 28, 2017.
- ERR 2017 Committee report June 14, 2017: (Committee Report).
- Our response to the report's questions (Collaboration Response)
- Final response to our response (pdf)
Experimental Readiness Review 2017
Time and Location
Helpful Documents
- Experiment Design Document (pdf)
- Report from 2016 ERR (report)
- Run plan from PREX-I (serves as example, will be updated) (RunPlan) and (DailyPlan)
Agenda (talks)
8:00 | Closed Session | |
8:20 | Remarks from Chair and Charge | Chair |
8:30 | Overview of Preparations (Charge Items 1 & 9) (pdf) | Kent Paschke (25+15) |
9:10 | Summary of Recommendations (pdf) | Seamus Riordan (20+10) |
9:40 | Radiation (Charge Item 8) (pdf) | Kent Paschke (30+15) |
10:25 | Break | |
10:55 | Septum Magnet, new HRS Quads (Charge Items 4 & 5) (pdf) | Juliette Mammei (15+10) |
11:20 | Beam (Charge Items 5 & 7) (pptx ) (pdf ) | Yves Roblin (12+8) |
11:40 | Working Lunch | |
13:00 | PREX and CREX Targets (Charge Item 2 and 3) (pdf) | Seamus Riordan (20+10) |
13:30 | Target Chamber (Charge Item 2 and 3) (tgtchamber_err2_17may2017.pdf) | Silviu Covrig Dusa (20+10) |
14:00 | Hall Configuration and Design Status (Charge Item 6) (prex-crex-err2017-rw.pdf) | Robin Wines (20+10) |
14:30 | Equipment Installation Plan (Charge Items 1, 9, 10) (PREXIIERR_Installation_JButler.pdf) (schedule) | Jessie Butler (20+10) |
15:00 | Documentation (Charge Items 6, 10, 11) (SafetyDoc.pdf) | Robert Michaels (10+5) |
Draft of COO (PREX-CREX-COO.pdf) | ||
Draft of ERG (PREX-CREX-ERG.pdf) and Chart (ERG_chart.pdf) | ||
Draft of ESAD (PREX-CREX-ESAD.pdf) | ||
RSAD (RSAD_PREX_CREX.doc) | ||
RSAD Budget Form (RSAD_Budget_Form_PREXII.pdf) | ||
PREX-I Septum OSP (Septum_PREX_osp.docx) | ||
Draft OSP for targets (Target_osp.docx) | ||
Draft OSP for collimator (Collimator_osp.docx) | ||
Draft OSP for shielding (Shielding_osp.docx) | ||
Draft OSP for detectors (Detector_osp.docx) | ||
OSP for Moller Polarimeter (MollerOSP.pdf) | ||
LOSP for Compton Polarimeter (halla_compton_losp.pdf) | ||
15:15 | Closed Session | |
17:00 | Close Out |