Difference between revisions of "PREX/CREX Aug 29 2017 02:30pm EDT"
From PREX Wiki
(→Agenda) |
Ciprian Gal (Talk | contribs) (→Agenda) |
||
Line 14: | Line 14: | ||
== Agenda == | == Agenda == | ||
# Ciprian: dump shielding [https://prex.jlab.org/wiki/images/9/9f/170829_PREX_Dump_CGal.pdf slides] | # Ciprian: dump shielding [https://prex.jlab.org/wiki/images/9/9f/170829_PREX_Dump_CGal.pdf slides] | ||
− | #* | + | #* KP: the tighter collimator is not done correctly. We need to keep the whole bore in line with what we want to cut. CG: will revisit |
+ | #* DM: We should not tighten the collimator acceptance too much since it will start to eat into the SAM acceptance (0.6 \pm 2 deg). | ||
+ | #* KP: we should understand why 2ft of iron is doing worse than 2ft of concrete. | ||
# Seamus: Collaboration Meeting Agenda Draft | # Seamus: Collaboration Meeting Agenda Draft | ||
Revision as of 10:27, 31 August 2017
Back to Main Page >> PREX/CREX_Teleconferences
previous meeting << >> following meeting
Contents
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 PARTICIPANT CODE: 913380354# Room IRL: CEBAF F227
Agenda
- Ciprian: dump shielding slides
- KP: the tighter collimator is not done correctly. We need to keep the whole bore in line with what we want to cut. CG: will revisit
- DM: We should not tighten the collimator acceptance too much since it will start to eat into the SAM acceptance (0.6 \pm 2 deg).
- KP: we should understand why 2ft of iron is doing worse than 2ft of concrete.
- Seamus: Collaboration Meeting Agenda Draft
Sunday, October 1
9:00- 9:30 Welcome/Overview of Issues - Kent 9:30-10:00 Target Chamber, Silviu 10:00-10:20 Coffee 10:20-10:50 Septum Calculations, Jay 10:50-11:20 Radiation Calculations and Beam Dump Summary, Cip 11:20-11:50 Software Summary (Tracking, Simulation), Seamus LUNCH 1:30- 2:00 GEMs and Stand, Dustin 2:00- 2:30 Tyler, SBU Quartz and GEMs 2:30- 3:00 AT Calculation Progress, Richards 3:00- 3:30 PMT Linearity, Dustin 3:20- 3:50 Coffee 3:50- 4:20 Moller, Jones (Sasha?) 4:20- 4:50 Kerr, Fernando 4:50- 5:20 Source, Caryn 5:20- 5:50 Beam Studies, Tao
Monday, October 2
9:00- 9:30 Hall Perspective and Beam Scheduling Thia 9:30-10:00 Design Issues: Vacuum System, Collimators, skyshine Gavalya Robin? 10:00-10:20 Coffee Break 10:20-10:50 Installation, Jessie 10:50-11:20 Accelerator/Source, Grames 11:20-11:50 Compton, Gaskell 11:50-12:20 Compton Photon, Quinn Adjourn