Difference between revisions of "PREX/CREX Monday, January 11, 2016 2:00pm EDT"
From PREX Wiki
Jump to navigationJump to searchLine 20: | Line 20: | ||
* BPM analysis for beam study follow up - Caryn | * BPM analysis for beam study follow up - Caryn | ||
* BCM analysis for beam study follow up - Ciprian and Kent | * BCM analysis for beam study follow up - Ciprian and Kent | ||
+ | * For SAM monitors we need to cable them to hall A counting house for diagnostic studies | ||
== Misc.== | == Misc.== |
Revision as of 16:09, 11 January 2016
Link to the Meeting page PREX/CREX Teleconferences
Last meeting: PREX/CREX Monday, January 4, 2016 2:00pm EDT
The teleconference info is as follows:
Phone #: +1-888-240-2560 or +1-408-740-7256 and See International Numbers Code: 8540081197
Agenda
Present:
Kent, Bob, Nickie, Ciprian, Dustin, Caryn, Ricky, Josh, Guido
- Summary of fall beam studies by Ciprian elog-3055
Minutes
- Possibility of using VQWK for all the channels
- We need to do an accounting for how many channels we needs - Ciprian
- Do we have enough VQWK pre-amps
- No. of available VQWK modules - Rakitha
- BPM analysis for beam study follow up - Caryn
- BCM analysis for beam study follow up - Ciprian and Kent
- For SAM monitors we need to cable them to hall A counting house for diagnostic studies
Misc.
TO DO Lists
- It would be nice to have real-time viewer for optics studies in commissioning (discussed in 01/16/2014 meeting)