PREX/CREX Nov 6, 2018 10:00am

From PREX Wiki
Revision as of 02:42, 6 November 2018 by Cameronc (talk | contribs)
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Back to Main Page >> PREX/CREX_Teleconferences

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  555 144 462
 Bluejeans link: https://bluejeans.com/555144462
 Offline room:   CEBAF Center F324-325

Minutes

  1. Upcoming November 11-12 collaboration meeting
    • Registration link (Please register if you haven't yet)
  2. analyzer/DAQ update (Bob/Ye/Cameron)
    • Corrected a non-standard wiring of BPMB and corrected some mapping issues in the Pan Control.db
    • Japan can make plots of the Counting House DAQ in standalone mode
    • ET deadtime testing is coming along, Carl Timmer suggests using the Java monitorGui to watch event flow-through
  3. main detector pmt linearity update: Devi ELOG Entry 3563
  4. new SAM insertion tube length spec: Dustin ELOG Entry 3564, Cameron (corrected a 2.2 cm sign error) ELOG Entry 3562
    • comments
  5. SEE BPM noise issues: Cameron ELOG Entry 3566, Tom Powers' references in Entry 3565
    • comments

Present

Excused