Power outage recovery
From PREX Wiki
Revision as of 15:54, 6 July 2019 by Cameronc (Talk | contribs) (→Checklist for power outage recovery)
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main<< HOW TOs
This page details the checklists for recovery of power outage. The following things has to be checked:
Checklist for power outage recovery
Counting DAQ
- VME/NIM crates are on
- VDC threshold (3 V) power supplies are on
- GEM low voltage power supplies are on
- Gas flow is working on both arms for VDCs and GEM detectors
- HV crates (LeCroy and GEM) are on
- If linear FIFO is used, check their base line (these values shift after power power recycle). If base line is changed above zero, adjust it and check for discriminator threshold
- Check if motion system is working as expected