Difference between revisions of "PreviousRunPlanDaily"

From PREX Wiki
Jump to: navigation, search
(Created page with 'This has the previous daily run plans found here RunPlanDaily {| border="1" |+ Daily Run Plan for PREX   <font color="blue">(latest at bottom)</font> ! Date (2010) !! S…')
 
 
(10 intermediate revisions by 2 users not shown)
Line 1: Line 1:
This has the previous daily run plans found here [[RunPlanDaily]]
+
[[PREX I Run Plans]]
 
+
{| border="1"
+
|+ Daily Run Plan for PREX &nbsp; <font color="blue">(latest at bottom)</font>
+
! Date (2010) !! Shift !!---------- Activity (Responsible) ----------!!---&nbsp;Status&nbsp;---
+
|-
+
| 03/19
+
| Day
+
| pump down; Møller, Compton, septum install; Q2 repair<br />
+
Insert sieve. (Techs)
+
|done
+
|-
+
| 03/19
+
| Swing
+
| Beam restore (B-team)
+
| done
+
|-
+
| 03/20
+
| Owl
+
|
+
* Septum checkout (Michaels: Page when beam imminent & spectrometer ready)
+
also:
+
* Initial look at low current cavity monitors (Ahmed: Page when beam imminent & spectrometer ready)
+
* Target alignment (Michaels)
+
* VDC checkout (Michaels)
+
* Quartz detectors checkout (McNulty, Wexler -- page when VDC tracks seen)
+
* GEM checkout (Camsonne -- page when VDC tracks seen, if left dipole is operating)
+
| done
+
----
+
All at 1-2 µA.<br />
+
Scattered energy ~ beam energy = 1.063 GeV.<br />
+
Quad settings:
+
*Right arm:
+
** Q1: dI/dP= 411.2474 Amps/GeV/c
+
** Q2: dI/dP= 436.2014 Amps/GeV/c
+
** Q3: dI/dP= 433.3897 Amps/GeV/c
+
* Left Arm:
+
** Q1: dI/dP= 419.8772 Amps/GeV/c
+
** Q2: dI/dP= 435.6273 Amps/GeV/c
+
** Q3: dI/dP= 434.9682 Amps/GeV/c
+
"Usual" polarity
+
|-
+
| 03/20
+
| Day
+
| Beam off & hall open 9:00 am<br />
+
Quads repair; Compton install; GEM install; signals debugging. Leave sieves in. (Techs)
+
| done
+
|-
+
| 03/20
+
| Swing
+
|
+
* Close up hall
+
* Benesch tuning (1/2 - 2 hours)
+
* Verify quad polarities (Camsonne)
+
* Cavity monitors basic function test (Ahmed)
+
* Low current cavity monitors setup (Musson, Ahmed)
+
| done
+
|-
+
| 3/21
+
| Owl
+
|
+
* Low current cavity monitors setup (Musson, Ahmed)
+
* Access for GEM installation (Camsonne)
+
| done but GEMs not ready
+
|-
+
| 3/21
+
| Day
+
|
+
* Spectrometer checkout:
+
** Quartz detectors checkout (McNulty, Wexler)
+
** Lumi checkout (Mercado) (2 µA on Ta)
+
** GEM checkout (Camsonne?)
+
* A line tuning (Benesch)
+
* Raster checkout
+
* Access:
+
** Low current cavities
+
** Target position
+
** Quartz
+
** Scintillator alignment
+
** LQ2
+
| done
+
|-
+
| 3/21
+
| Swing
+
|
+
* Low current cavity monitors setup (Michaels, Ahmed)
+
* Remove sieves
+
* Initial look at sieve out data
+
* Replace sieves
+
| done
+
|-
+
| 3/22
+
| Owl
+
|
+
* Pointing measurement (Riordan)
+
* Remove sieves
+
* Repeat pointing measurements with no sieves
+
* If done or unable to continue before 4 am page Luis Mercado to do lumi checks
+
* After 4 am page Dustin McNulty for detector work
+
|done
+
|-
+
| 3/22
+
| Day
+
|
+
* Optics (Liyanage) Sieve OUT.  NB Current limit 2 uA!
+
|done
+
|-
+
| 3/22
+
| Swing
+
|
+
* Optics continued, sieve IN.  NB Current limit 2 uA! (Shift Crew)
+
|done
+
|-
+
| 3/23
+
| Owl
+
|
+
* Quartz detectors resolution studies (KK, Dustin, John W)
+
* Lumi studies (Luis)
+
|done
+
|-
+
| 3/23
+
| Day
+
|
+
* Remove water target. (Target, Techs)
+
* Reconfigure Moller cryo.
+
* '''Beam studies''' ~ 2pm, study of helicity correlated position differences for spin flipper states. (Dalton, Rupesh, Reza)
+
|water cell removed, rest not finished
+
|-
+
| 3/23
+
| Swing
+
|
+
* Target pumpdown
+
|done
+
|-
+
| 3/24
+
| Owl
+
|
+
* Target pumpdown
+
|done
+
|-
+
| 3/24
+
| Day
+
|
+
* Target cooldown
+
|done
+
|-
+
| 3/24
+
| Swing
+
|
+
* Tune high current beam into Hall A
+
|done
+
|-
+
| 3/25
+
| Owl
+
|
+
* Commission lead target, 50 uA (Bob)
+
* Lumis and oversampling tests (KK, Luis, Paul)
+
|in progress
+
|-
+
| 3/25
+
| Day
+
|
+
* Access to fix left dipole
+
|done
+
|-
+
| 3/25
+
| Swing
+
|
+
* Parity Quality commissioning (Kent, Rupesh, Luis, Dustin)
+
* Beam monitor calibrations (Diancheng Wang, Xiaoyan Deng)
+
|postponed
+
|-
+
| 3/26
+
| Owl
+
|
+
* High Luminosity Detector Commissioning
+
|in progress
+
|-
+
| 3/26
+
| Day
+
|
+
*Moller Checkout
+
|postponed
+
|-
+
| 3/26
+
| Swing
+
|
+
*High Current on C12 (thick and thin)
+
|partly done
+
|-
+
| 3/27
+
| Owl
+
|
+
| no beam
+
|-
+
| 3/27
+
| Day
+
|
+
| no beam
+
|-
+
| 3/27
+
| Swing
+
|
+
*High-current on thick C12, adjust HV (Luis or Bob)
+
*Finish the commissioning of thick Pb target (Bob, Ahmed)
+
*Electronic Commissioning (KK, Luis, Paul, Jon et al)
+
|done, high-current tests continue
+
|-
+
| 3/28
+
| Owl
+
|
+
*Continue with the above, if necessary.
+
*High Luminosity Commissioning (Rupesh, Luis, Jon, Bob)
+
*BCM/BPM calibration (Rupesh)
+
*Establishing Parity Measurements, Charge feedback, blinding (Rupesh, Jon)
+
|not finished
+
|-
+
| 3/28
+
| Day
+
|
+
*Comparison Study of Optics Tunes (Seamus, Nilanga, Kiad)
+
*Sometime before Monday, submit the ATLIS plan for Dithering test (Rupesh)
+
|done
+
|-
+
| 3/28
+
| Swing
+
|
+
*Continue Optics if necessary.
+
*Continue High Luminosity Commissioning
+
|done
+
|-
+
| 3/29
+
| Owl
+
|
+
*Mini-production run (shift crew)
+
*Stop beam at 07:00 or whenever Ed Folts asks to.
+
|done
+
|-
+
| 3/29
+
| Day
+
|
+
*Open Hall A to set up Moller and Compton (Ed Folts, Sasha, Sirish, et.al.)
+
*Work on GEMs (Alex, Seamus, et.al.)
+
*MCC to do beam studies while Hall A open
+
*Detector linearity/LED tests (Luis)
+
*Setup WAC analysis (Mark, Mindy)
+
|done
+
|-
+
| 3/29
+
| Swing
+
|
+
*Moller magnet cooldown
+
*Optics and acceptance studies (Seamus, Ahmed, Nilanga)
+
|done
+
|-
+
| 3/30
+
| Owl
+
|
+
*Commission charge feedback (Mark)
+
*Current monitor calibration and pedestals determination (Mark)
+
*Quasi-production on Empty Target (owl shift crew)
+
|done
+
|-
+
| 3/30
+
| Day
+
|
+
*Access do work on Moller and Compton.
+
*Some GEM installation work. (Alex, Seamus, Kiad, Nilanga)
+
*Possible linearity/LED study. (Luis)
+
|done, except linearity
+
|-
+
| 3/30
+
| Swing
+
|
+
*First Commissioning of Moller -- Beam Checks (Sasha, Javier, Roman, Jay)
+
|done
+
|-
+
| 3/31
+
| Owl
+
|
+
*Scans of Septum and quad Q1 for tunes A and B. (Bob)
+
*Beam Studies of Helicity Correlations
+
|done
+
|-
+
| 3/31
+
| Day
+
|
+
*Beam Tuning (Jay Benesch)
+
|done
+
|-
+
| 3/31
+
| Swing
+
|
+
*Either or both of these:
+
* a) Moller Commissioning (Sasha, Javier, Roman, Jay)
+
* b) Tests of Dithering and other Beam-Related things (Kent, Rupesh)
+
|Moller was done
+
|-
+
| 4/1
+
| Owl
+
|
+
*If Kent's tests not done on Swing, continue here. (Kent, Rupesh)
+
*Beam and Septum scan with new tune (Seamus)
+
*Helicity-correlated beam studies (Shift crew)
+
|done
+
|-
+
| 4/1
+
| Day
+
|
+
* Beam Tuning (Jay)
+
|done, successful
+
|-
+
| 4/1
+
| Swing
+
|
+
* More beam tuning if necessary
+
* Moller Commissioning
+
|done
+
|-
+
| Friday 2 April
+
| Owl
+
|
+
*Assuming the HRS tune has been frozen
+
*Check detector alignment
+
*A_T studies
+
*Q<sup>2</sup> Measurements
+
|partly done, needs more work
+
|-
+
| Friday 2 April
+
| Day
+
|
+
*Tuning Beam for Compton
+
|done
+
|-
+
| Friday 2 April
+
| Swing
+
|
+
*  20:00 Obtain sieve runs (optics mini-run plan), Q<sup>2</sup> measurements (Bob)
+
|done, but not Q<sup>2</sup>
+
|-
+
| Saturday 3 April
+
| Owl
+
|
+
* Obtain sieve runs on Ta (Nilanga mini-run plan)
+
* Put in Lead target at low current and do counting-mode runs (Rupesh, Ahmed)
+
* Integrate-mode with Lead at 2 or 3 uA (Luis, Jon)
+
|done
+
|-
+
| Saturday 3 April
+
| Day
+
|
+
* Moller Commissioning <font color="green">(priority activity)</font>
+
* Work on getting into production mode (Mark, Rupesh)
+
|done, but not yet in prod.
+
|-
+
| Saturday 3 April
+
| Swing
+
|
+
* Moller commissioning
+
|done
+
|-
+
| Sunday 4 April
+
| Owl
+
|
+
* Counting data on tune Y (right arm) super-thin carbon
+
* Change to tune B
+
* Integrate-mode with Lead at 2 or 3 uA (Luis, Jon)
+
|done
+
|-
+
| Sunday 4 April
+
| Day
+
|
+
* Integrate-mode with thick carbon 50 uA
+
* Compton QWP1 calibration.
+
|done
+
|-
+
| Sunday 4 April
+
| Swing
+
|
+
* General Compton commissioning and pseudo-production (empty target) parity data at 50 uA.
+
|done
+
|-
+
| Monday 5 April
+
| Owl
+
|
+
* pseudo-production (empty target) parity data and Compton data at 50 uA.
+
|done
+
|-
+
| Monday 5 April
+
| Day
+
|
+
* 12:00 Jay to run optics test (~ 30 mins)
+
* Moller Spin Dance
+
* Set up vertical polarization and measure A_T
+
|done
+
|-
+
| Monday 5 April
+
| Swing
+
|
+
*Continue to setup up vertical polarization
+
*Measurements of A_T on Pb and C12
+
|done
+
|-
+
| Tuesday 6 April
+
| Owl
+
|
+
* Continue measurements of A_T on Pb and C12
+
|partly done
+
|-
+
| Tuesday 6 April
+
| Day
+
|
+
* Possible horizontal scan:  Tune B with sieve slit (Seamus)
+
* When ready: Relocate Quartz Detectors (Dustin, Jack)
+
|postponed: vacuum problems
+
|-
+
| Tuesday 6 April
+
| Swing
+
|
+
* In restricted access.
+
* Any activities that require access.
+
* Shift canceled
+
|
+
|-
+
| Wednesday 7 April
+
| Owl
+
|
+
* Shift cancelled
+
|
+
|-
+
| Wednesday 7 April
+
| Day
+
|
+
*Shift cancelled
+
* Investigate target vacuum problem
+
* Move quartz detectors (Dustin, Jack)
+
|Leak found at O-ring connection between target chamber and collimator box
+
|-
+
| Wednesday 7 April
+
| Swing
+
|
+
*Shift cancelled
+
|
+
|-
+
| Thursday 8 April
+
| Owl
+
|
+
*Shift cancelled
+
|
+
|-
+
| Thursday 8 April
+
| Day
+
|
+
*Shift cancelled
+
|Target chamber open, found that the 4th foil in Optics target blown off
+
|-
+
| Thursday 8 April
+
| Swing
+
|
+
*Shift cancelled
+
|
+
|-
+
| Friday 9 April
+
| Owl
+
|
+
*Shift cancelled
+
|
+
|-
+
| Friday 9 April
+
| Day
+
|
+
* To be determined.
+
* When ready: Install GEMs
+
|
+
|-
+
| Friday 9 April
+
| Swing
+
|
+
* Cancelled
+
|
+
|-
+
| Saturday 10 April
+
| Owl
+
|
+
* Cancelled
+
|
+
|-
+
| Saturday 10 April
+
| Day
+
|
+
* Cancelled
+
|
+
|-
+
| Saturday 10 April
+
| Swing
+
|
+
* Cancelled
+
|
+
|-
+
| Sunday 11 April
+
| Owl
+
|
+
* Cancelled
+
|
+
|-
+
| Sunday 11 April
+
| Day
+
|
+
* Cancelled
+
|
+
|-
+
| Sunday 11 April
+
| Swing
+
|
+
* Cancelled
+
|
+
|-
+
| Monday 12 April
+
| Owl
+
|
+
* Cancelled
+
|
+
|-
+
| Monday 12 April
+
| Day
+
|
+
* Cancelled
+
|
+
|-
+
| Monday 12 April
+
| Swing
+
|
+
* Cancelled
+
|
+
|-
+
| Tuesday 13 April
+
| Owl
+
|
+
* Cancelled
+
|
+
|-
+
| Tuesday 13 April
+
| Day
+
|
+
* Cancelled
+
|
+
|-
+
| Tuesday 13 April
+
| Swing
+
|
+
* Cancelled
+
|Tungsten collimator modified and installed.  Target pump down started and initially successful.
+
|-
+
| Wednesday 14 April
+
| Owl
+
|
+
* Cancelled
+
| Target pump down.
+
|-
+
| Wednesday 14 April
+
| Day
+
|
+
* Cancelled -- no shift workers (might need a TO)
+
* Target pump down and leak checking.
+
* When ready, begin target cooldown. (Dave Meekins and JP)
+
| Done.  Vacuum good.  Target cold.
+
|-
+
| Wednesday 14 April
+
| Swing
+
|
+
* Beam restore in Hall A
+
* Harp Scan - Shifters
+
* Raster size scan (goal is 3x3mm on empty cell) - Shifters.
+
* Detector Alignment - Dustin
+
* Dithering run with Septum On/Off - Rupesh.
+
|
+
|-
+
| Thursday 15 April
+
| Owl
+
|
+
<!--#* Beam restore in Hall A
+
#* When ready, begin <font color="blue">PREX recovery program:</font>
+
#* Check alignment of collimator.  Check temperature vs beam current. (Bob)
+
#* Check alignment of PREX quartz detector. (Dustin)
+
#* Check alignment of sieve slits, verify they did not change. (Seamus or Bob)
+
* Check alignment of Pb/diamond target and optimal raster size. (Bob)-->
+
* Thick Carbon Integrating Mode Run - Rupesh.
+
* Thick Carbon Dithering Run - Rupesh + Luis.
+
* Take Access: Change to counting mode and put sieve in - Ahmed.
+
|
+
|-
+
| Thursday 15 April
+
| Day
+
|
+
* Beam Studies -- establishing good beam in Hall A and Compton (Jay and B team)
+
|
+
|-
+
| Thursday 15 April
+
| Swing
+
|
+
* Detector Alignment - Dustin.
+
* Pb Alignment - Bob.
+
* Take access and put sieve in - Seamus.
+
* Sieve Alignment - Seamus.
+
* Take Access to remove sieve (Seamus) + switch to integrating mode (Jon) - '''Page Guy and Bob'''.
+
* Heat load test '''(run up to 500C)''' - Bob + Guy.
+
If possible, depending on heat load test:
+
* Relative Rate 12C/Pb Runs - Bob / Dustin.
+
* Start production (Rupesh, Luis, Kent, Krishna)
+
|
+
|-
+
| Friday 16 April
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Friday 16 April
+
| Day
+
|
+
* Production
+
|
+
|-
+
| Friday 16 April
+
| Swing
+
|
+
* Production @ 40uA
+
* Ramp up to 50uA (Guy + Bob)
+
|
+
|-
+
| Saturday 17 April
+
| Owl
+
|
+
* Production @ 50uA
+
|
+
|-
+
| Saturday 17 April
+
| Day
+
|
+
* Production @ 50uA
+
* Moller Checks + Measurement Starting 9am (Sasha)
+
|
+
|-
+
| Saturday 17 April
+
| Swing
+
|
+
* Moller till 7pm (Sasha).
+
* Compton (Jay Benesch + Megan).
+
* Production @ 50uA.
+
|
+
|-
+
| Sunday 18 April
+
| Owl
+
|
+
* Production @ 50uA
+
|
+
|-
+
| Sunday 18 April
+
| Day + Swing
+
|
+
* Production @ 50uA.
+
* Staring 3pm:
+
# Compton test (Jay Benesch + Megan).
+
# Page Dustin + Jon + Bob + Sasha.
+
# Q^2 Measurement (Bob)
+
# Call Compton Experts
+
# Access:
+
## Refill Moller Magnet.
+
## Check Compton HV.
+
## Remove S0.
+
## Go to counting mode (Dustin).
+
## Compton Stuff.
+
## Detector Mapping (Jon).
+
# Detector Alignment (Dustin).
+
# Q^2 Measurement (Bob).
+
# Relative Rate Measurement (Bob).
+
# Access to Return to Integrating Mode.
+
* Production @ 50uA
+
|-
+
| Monday 19 April
+
| Owl
+
|
+
* Production @ 50uA
+
|
+
|-
+
| Monday 19 April
+
| Day
+
|
+
* Production @ 50uA
+
|
+
|-
+
| Monday 19 April
+
| Swing
+
|
+
* Production
+
|
+
|-
+
| Tuesday 20 April
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Tuesday 20 April
+
| Day
+
|
+
* Production
+
* Beam studies from approx. 11 am to 2 pm
+
* Hall A Activities:
+
* -- Compton 1/4wave stepper (Abdurahim)
+
* -- Check R-HRS Q2 and switch to remote mode (Heidi)
+
* -- Adjust R-HRS A_T (Dustin)
+
* -- Take pedestal data (Jon)
+
* -- Check 4th GEM and possibly install 5th (Alex, Jon)
+
* -- Test motion of A_T detector R-HRS (Jon)
+
* -- Possible Compton shielding / HV check (Megan)
+
* -- Ramp Moller magnet, measure stray fields. (Sasha)
+
* -- Parasitic work on floor (Yi Qiang)
+
|
+
|-
+
| Tuesday 20 April
+
| Swing
+
|
+
* Tune up Compton
+
* Production
+
|
+
|-
+
 
+
| Wednesday 21 April
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Wednesday 21 April
+
| Day
+
|
+
* Production
+
|
+
|-
+
| Wednesday 21 April
+
| Swing
+
|
+
* Production
+
|
+
|-
+
| Thursday 22 April
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Thursday 22 April
+
| Day
+
|
+
* Beam studies.  Transverse Phase Space Study in Wien.  (Reza, Mark, Rupesh)
+
* At ~2 pm start Moller commissioning
+
|
+
|-
+
| Thursday 22 April
+
| Swing
+
|
+
* Finish Moller (10 hours)
+
* Resume Production
+
* Don't forget the beam recovery procedure
+
|
+
|-
+
| Friday 23 April
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Friday 23 April
+
| Day
+
|
+
* Q<sup>2</sup> Studies (3 hrs) -- Dustin, Bob
+
* GEM studies are only parasitic.
+
|
+
|-
+
| Friday 23 April
+
| Swing
+
|
+
* Production
+
|
+
|-
+
| Saturday 24 April
+
| Owl
+
|
+
* Production on thick C12
+
|
+
|-
+
| Saturday 24 April
+
| Day
+
|
+
* Production on thick C12
+
* At about 2 pm switch to 120 Hz, still C12
+
* Run briefly on C12 at 120 Hz
+
* Switch to thick Pb target (120 Hz)
+
|
+
|-
+
| Saturday 24 April
+
| Swing
+
|
+
* Production on Pb at 120 Hz
+
|
+
|-
+
| Sunday 25 April
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Sunday 25 April
+
| Day
+
|
+
* Q<sup>2</sup> measurements - Bob, Dustin
+
* Otherwise production
+
|done
+
|-
+
| Sunday 25 April
+
| Swing
+
|
+
* Production
+
|
+
|-
+
| Monday 26 April
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Monday 26 April
+
| Day
+
|
+
* Wien flip
+
|Wien flip postponed until Tues
+
|-
+
| Monday 26 April
+
| Swing
+
|
+
* Production
+
|-
+
| Tuesday 27 April
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Tuesday 27 April
+
| Day
+
|
+
* Beam Studies
+
* Wien Flip
+
* Checks of laser at polarized source (Kent and EGG)
+
* Adiabatic Damping Study (Yves Roblin)
+
|
+
Done
+
|-
+
| Tuesday 27 April
+
| Swing
+
|
+
* Compton Tune
+
* 4 hrs on Thick Carbon (RD=0, IT=500us)
+
* flip half-wave plate
+
* 4 hrs on Thick Carbon
+
|
+
|-
+
| Wednesday 28 April
+
| Owl
+
|
+
* Finish Swing Plan
+
* Yves Roblin Measurement (if possible)
+
* Run on Carbon (RD=0, IT=1535)
+
|
+
|-
+
| Wednesday 28 April
+
| Day
+
|
+
* Moller
+
|
+
|-
+
| Wednesday 28 April
+
| Swing
+
|
+
* Finish Moller
+
* Production
+
|
+
|-
+
| Thursday 29 April
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Thursday 29 April
+
| Day
+
|
+
* Production
+
|Access to repair target leak
+
|-
+
| Thursday 29 April
+
| Swing
+
|
+
* Production
+
|Could not close hall due to faulty fire suppression system
+
|-
+
| Friday 30 April
+
| Owl
+
|
+
* Production
+
|Could not close hall due to faulty fire suppression system
+
|-
+
| Friday 30 April
+
| Day
+
|
+
* 08:00 Beam Stops for Open House
+
|
+
|-
+
| Friday 30 April
+
| Swing
+
|
+
* No Beam
+
* Injector studies
+
|
+
|-
+
| Friday 30 April
+
| Owl
+
|
+
* No Beam
+
* Injector studies
+
|
+
|-
+
| Saturday 1 May
+
| Day
+
|
+
* Open House
+
* Detector work
+
* Compton work
+
|
+
|-
+
| Saturday 1 May
+
| Swing
+
|
+
* Restore Beam. 
+
* Check Beam Properties.  (shift)
+
* Pulsed Beam Test. (Mark, Luis)
+
|
+
|-
+
| Sunday 2 May
+
| Owl
+
|
+
* Continue with Above Tests
+
* Raster and Pb Target Tests (Bob)
+
|
+
|-
+
| Sunday 2 May
+
| Day
+
|
+
* Continue Above Tests if necessary
+
* Start Production
+
* Get cavities to work at high current.  (Ahmed)
+
* (The check of cavities at low current is postponed.)
+
|
+
|-
+
| Sunday 2 May
+
| Swing
+
|
+
* Production
+
|
+
|-
+
| Monday 3 May
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Monday 3 May
+
| Day
+
|
+
* Pass change 3 -> 5 for Hall B until ~1:00PM
+
* Compton vacuum, LHRS dipole UPS replacement during the down
+
* Return to PbD #2 production
+
|
+
|-
+
| Monday 3 May
+
| Swing
+
|
+
* Production
+
|
+
|-
+
| Tuesday 4 May
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Tuesday 4 May
+
| Day
+
|
+
* Beam studies
+
* Installation of new switch for Pockels cell (as per Kent)
+
* 8 hour Compton beam line bake-out, leak check
+
|
+
|-
+
| Tuesday 4 May
+
| Swing
+
|
+
* Low -> high current cavity switch test (Bob, Ahmed) (??)
+
* Production
+
|
+
|-
+
|}
+

Latest revision as of 13:21, 10 June 2019

PREX I Run Plans