− | == Daily Run Plan ==
| |
| | | |
− | Here are details of the daily run plan. See also the global [https://prex.jlab.org/wiki/index.php?title=RunPlan Run Plan]. The person responsible should ensure that
| + | <br><br> |
− | a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator
| + | [[Main_Page|<B>CREX Main</B>]] << [[Main_Page_PREXII|PREX II Main]] << [[Run Coordinator Tools]] <br><br> |
− | as the situation on the ground changes.
| + | |
− | <hr>
| + | [[PREX2RunPlan2019 | PREX Global Run Plan]] -- [[RunPlanDaily_CREX|CREX Daily Run Plan]] |
| + | |
| + | == Current Daily Run Plans == |
| + | |
| + | The current day is indicated by a color. |
| + | |
| + | {| class="wikitable" border="1" style="width:100%; text-align:left;border-collapse:collapse" |
| + | |- |
| + | ! style="width:10%"| Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status |
| | | |
− | {| border="1"
| |
− | |+ Daily Run Plan for PREX (latest at bottom)
| |
− | ! Date (2010) !! Shift !!---------- Activity (Responsible) ----------!!--- Status ---
| |
− | |-
| |
− | | 03/19
| |
− | | Day
| |
− | | pump down; Møller, Compton, septum install; Q2 repair<br />
| |
− | Insert sieve. (Techs)
| |
− | |done
| |
− | |-
| |
− | | 03/19
| |
− | | Swing
| |
− | | Beam restore (B-team)
| |
− | | done
| |
− | |-
| |
− | | 03/20
| |
− | | Owl
| |
− | |
| |
− | * <font color="red">Septum checkout (Michaels: Page when beam imminent & spectrometer ready)</font>
| |
− | also:
| |
− | * Initial look at low current cavity monitors (Zafar: Page when beam imminent & spectrometer ready)
| |
− | * Target alignment (Michaels)
| |
− | * VDC checkout (Michaels)
| |
− | * Quartz detectors checkout (McNulty, Wexler -- page when VDC tracks seen)
| |
− | * GEM checkout (Camsonne -- page when VDC tracks seen, if left dipole is operating)
| |
− | | done
| |
− | ----
| |
− | All at 1-2 µA.<br />
| |
− | Scattered energy ~ beam energy = 1.063 GeV.<br />
| |
− | Quad settings:
| |
− | *Right arm:
| |
− | ** Q1: dI/dP= 411.2474 Amps/GeV/c
| |
− | ** Q2: dI/dP= 436.2014 Amps/GeV/c
| |
− | ** Q3: dI/dP= 433.3897 Amps/GeV/c
| |
− | * Left Arm:
| |
− | ** Q1: dI/dP= 419.8772 Amps/GeV/c
| |
− | ** Q2: dI/dP= 435.6273 Amps/GeV/c
| |
− | ** Q3: dI/dP= 434.9682 Amps/GeV/c
| |
− | "Usual" polarity
| |
− | |-
| |
− | | 03/20
| |
− | | Day
| |
− | | Beam off & hall open 9:00 am<br />
| |
− | Quads repair; Compton install; GEM install; signals debugging. Leave sieves in. (Techs)
| |
− | | done
| |
− | |-
| |
− | | 03/20
| |
− | | Swing
| |
− | |
| |
− | * Close up hall
| |
− | * Benesch tuning (1/2 - 2 hours)
| |
− | * Verify quad polarities (Camsonne)
| |
− | * Cavity monitors basic function test (Zafar)
| |
− | * <font color="red">Low current cavity monitors setup (Musson, Zafar)</font>
| |
− | | done
| |
| |- | | |- |
− | | 3/21 | + | | rowspan="3" | Wedsday, September 4 |
| | Owl | | | Owl |
| + | | Production 71uA |
| | | | | |
− | * <font color="red">Low current cavity monitors setup (Musson, Zafar)</font>
| |
− | * Access for GEM installation (Camsonne)
| |
− | | done but GEMs not ready
| |
| |- | | |- |
− | | 3/21
| |
− | | Day
| |
− | |
| |
− | * <font color="red">Spectrometer checkout:</font>
| |
− | ** Quartz detectors checkout (McNulty, Wexler)
| |
− | ** Lumi checkout (Mercado) (2 µA on Ta)
| |
− | ** GEM checkout (Camsonne?)
| |
− | * A line tuning (Benesch)
| |
− | * Raster checkout
| |
− | * Access:
| |
− | ** Low current cavities
| |
− | ** Target position
| |
− | ** Quartz
| |
− | ** Scintillator alignment
| |
− | ** LQ2
| |
− | | done
| |
− | |-
| |
− | | 3/21
| |
− | | Swing
| |
− | |
| |
− | * <font color="red">Low current cavity monitors setup (Michaels, Zafar)</font>
| |
− | * Remove sieves
| |
− | * Initial look at sieve out data
| |
− | * Replace sieves
| |
− | | done
| |
− | |-
| |
− | | 3/22
| |
− | | Owl
| |
− | |
| |
− | * <font color="red">Pointing measurement (Riordan)</font>
| |
− | * Remove sieves
| |
− | * Repeat pointing measurements with no sieves
| |
− | * If done or unable to continue before 4 am page Luis Mercado to do lumi checks
| |
− | * After 4 am page Dustin McNulty for detector work
| |
− | |done
| |
− | |-
| |
− | | 3/22
| |
− | | Day
| |
− | | <font color="red">
| |
− | * Optics (Liyanage)</font>Sieve OUT. NB Current limit 2 uA!
| |
− | |done
| |
− | |-
| |
− | | 3/22
| |
− | | Swing
| |
− | |
| |
− | * Optics continued, sieve IN. NB Current limit 2 uA! (Shift Crew)
| |
− | |done
| |
− | |-
| |
− | | 3/23
| |
− | | Owl
| |
− | |
| |
− | * Quartz detectors resolution studies (KK, Dustin, John W)
| |
− | * Lumi studies (Luis)
| |
− | |
| |
− | |-
| |
− | | 3/23
| |
| | Day | | | Day |
| + | | Moller |
| | | | | |
− | * Remove water target. (Target, Techs)
| |
− | * Reconfigure Moller cryo.
| |
− | * '''Beam studies''' ~ 2pm, study of helicity correlated position differences for spin flipper states. (Dalton, Rupesh, Reza)
| |
− | |water cell removed, rest not finished
| |
| |- | | |- |
− | | 3/23
| |
| | Swing | | | Swing |
| + | | Moller |
| | | | | |
− | * Target pumpdown
| |
− | |done
| |
| |- | | |- |
− | | 3/24 | + | | rowspan="3" | Thursday, September 5 |
| | Owl | | | Owl |
| + | | Production 71uA |
| | | | | |
− | * Target pumpdown
| |
− | |done
| |
| |- | | |- |
− | | 3/24
| |
| | Day | | | Day |
| + | | Mott polarimetry measurements |
| | | | | |
− | * Target cooldown
| |
− | |done
| |
| |- | | |- |
− | | 3/24
| |
| | Swing | | | Swing |
| + | | Production 71uA |
| | | | | |
− | * Tune high current beam into Hall A
| |
− | |done
| |
| |- | | |- |
− | | 3/25 | + | | rowspan="3" | Friday, September 6 |
| | Owl | | | Owl |
| + | | Production 71uA |
| | | | | |
− | * Commission lead target, 50 uA (Bob)
| |
− | * Lumis and oversampling tests (KK, Luis, Paul)
| |
− | |in progress
| |
| |- | | |- |
− | | 3/25
| |
| | Day | | | Day |
| + | | Production 85uA |
| | | | | |
− | * Access to fix left dipole
| |
− | |done
| |
| |- | | |- |
− | | 3/25
| |
| | Swing | | | Swing |
| + | | Production 85uA |
| | | | | |
− | * Parity Quality commissioning (Kent, Rupesh, Luis, Dustin)
| |
− | * Beam monitor calibrations (Diancheng Wang, Xiaoyan Deng)
| |
− | |postponed
| |
| |- | | |- |
− | | 3/26 | + | | rowspan="3" | Saturday, September 7 |
| | Owl | | | Owl |
| + | | Production 85uA |
| | | | | |
− | * High Luminosity Detector Commissioning
| |
− | |in progress
| |
| |- | | |- |
− | | 3/26
| |
| | Day | | | Day |
| + | | Production 85uA |
| | | | | |
− | *Moller Checkout
| |
− | |postponed
| |
| |- | | |- |
− | | 3/26
| |
| | Swing | | | Swing |
| + | | Production 85uA |
| | | | | |
− | *High Current on C12 (thick and thin)
| |
− | |partly done
| |
| |- | | |- |
− | | 3/27 | + | |-style="background: #FCF3CF; |
| + | | rowspan="3" | Sunday, September 8 |
| | Owl | | | Owl |
| + | | Production 85uA |
| | | | | |
− | | no beam
| |
| |- | | |- |
− | | 3/27
| |
| | Day | | | Day |
| + | | Moller Polarimetry |
| | | | | |
− | | no beam
| |
| |- | | |- |
− | | 3/27
| |
| | Swing | | | Swing |
− | | | + | | Q2 measurement and Spectrometer rescattering |
− | *High-current on thick C12, adjust HV (Luis or Bob)
| + | | https://prex.jlab.org/wiki/index.php/RescatteringPlan |
− | *Finish the commissioning of thick Pb target (Bob, Ahmed)
| + | |
− | *Electronic Commissioning (KK, Luis, Paul, Jon et al)
| + | |
− | |done, high-current tests continue | + | |
| |- | | |- |
− | | 3/28 | + | | rowspan="3" | Monday, September 9 |
| | Owl | | | Owl |
| + | | Production 85uA |
| | | | | |
− | *Continue with the above, if necessary.
| |
− | *High Luminosity Commissioning (Rupesh, Luis, Jon, Bob)
| |
− | *BCM/BPM calibration (Rupesh)
| |
− | *Establishing Parity Measurements, Charge feedback, blinding (Rupesh, Jon)
| |
− | |not finished
| |
| |- | | |- |
− | | 3/28
| |
| | Day | | | Day |
− | | | + | | SADness |
− | *Comparison Study of Optics Tunes (Seamus, Nilanga, Kiad)
| + | | Scheduled Accelerator Down begins |
− | *Sometime before Monday, submit the ATLIS plan for Dithering test (Rupesh)
| + | |} |
− | |done | + | [[Run plan history | <B>Previous Daily Run Plans</B>]] |
− | |- | + | |
− | | 3/28 | + | |
− | | Swing
| + | |
− | |
| + | |
− | *Continue Optics if necessary.
| + | |
− | *Continue High Luminosity Commissioning
| + | |
− | |done
| + | |
− | |-
| + | |
− | | 3/29
| + | |
− | | Owl
| + | |
− | |
| + | |
− | *Mini-production run (shift crew)
| + | |
− | *Stop beam at 07:00 or whenever Ed Folts asks to.
| + | |
− | |done
| + | |
− | |-
| + | |
− | | 3/29
| + | |
− | | Day
| + | |
− | |
| + | |
− | *Open Hall A to set up Moller and Compton (Ed Folts, Sasha, Sirish, et.al.)
| + | |
− | *Work on GEMs (Alex, Seamus, et.al.)
| + | |
− | *MCC to do beam studies while Hall A open
| + | |
− | *Detector linearity/LED tests (Luis)
| + | |
− | *Setup WAC analysis (Mark, Mindy)
| + | |
− | |done
| + | |
− | |-
| + | |
− | | 3/29
| + | |
− | | Swing
| + | |
− | |
| + | |
− | *Moller magnet cooldown
| + | |
− | *Optics and acceptance studies (Seamus, Ahmed, Nilanga)
| + | |
− | |done
| + | |
− | |-
| + | |
− | | 3/30
| + | |
− | | Owl
| + | |
− | |
| + | |
− | *Commission charge feedback (Mark)
| + | |
− | *Current monitor calibration and pedestals determination (Mark)
| + | |
− | *Quasi-production on Empty Target (owl shift crew)
| + | |
− | |done
| + | |
− | |-
| + | |
− | | 3/30
| + | |
− | | Day
| + | |
− | |
| + | |
− | *Access do work on Moller and Compton.
| + | |
− | *Some GEM installation work. (Alex, Seamus, Kiad, Nilanga)
| + | |
− | *Possible linearity/LED study. (Luis)
| + | |
− | |
| + | |
− | |-
| + | |
− | | 3/30
| + | |
− | | Swing
| + | |
− | |
| + | |
− | *First Commissioning of Moller -- Beam Checks (Sasha, Javier, Roman, Jay)
| + | |
− | |
| + | |
− | |-
| + | |
− | | 3/31
| + | |
− | | Owl
| + | |
− | |
| + | |
− | *Scans of Septum and quad Q1 for tunes A and B. (Bob)
| + | |
− | *Beam Studies of Helicity Correlations
| + | |
− | |
| + | |
− | |-
| + | |
− | | 3/31
| + | |
− | | Day
| + | |
− | |
| + | |
− | *Beam Tuning (Jay Benesch)
| + | |
− | |
| + | |
− | |-
| + | |
− | | 3/31
| + | |
− | | Swing
| + | |
− | |
| + | |
− | *Either or both of these:
| + | |
− | * a) Moller Commissioning (Sasha, Javier, Roman, Jay)
| + | |
− | * b) Tests of Dithering and other Beam-Related things (Kent, Rupesh)
| + | |
− | |
| + | |
− | |-
| + | |
− | | 4/1
| + | |
− | | Owl
| + | |
− | |
| + | |
− | *Beam and Septum scan with new tune
| + | |
− | *Helicity-correlated beam studies
| + | |
− | |
| + | |
− | |-
| + | |
− | | 4/1
| + | |
− | | Day
| + | |
− | |
| + | |
− | *One of these:
| + | |
− | * a) Beam Tuning (MCC)
| + | |
− | * b) Access to work on Moller or Compton
| + | |
− | * c) Moller Commissioning
| + | |
− | |
| + | |
− | |-
| + | |
− | | 4/1
| + | |
− | | Swing
| + | |
− | |
| + | |
− | *
| + | |
− | |
| + | |
− | |-
| + | |
− | | 4/2
| + | |
− | | Owl
| + | |
− | |
| + | |
− | *Assuming the HRS tune has been frozen
| + | |
− | *Check detector alignment
| + | |
− | *A_T studies
| + | |
− | *Q<sup>2</sup> Measurements
| + | |
− | |
| + | |
− | |-
| + | |
− | | 4/2
| + | |
− | | Day
| + | |
− | |
| + | |
− | *|
| + | |
− | |-
| + | |
− | | 4/2
| + | |
− | | Swing
| + | |
− | |
| + | |
− | *Moller Commissioning ?
| + | |
− | |
| + | |
− | |-
| + | |
− | | 4/3
| + | |
− | | Owl
| + | |
− | |
| + | |
− | *Production Checkout
| + | |
− | |
| + | |
− | |-
| + | |
− | | 4/3
| + | |
− | | Day
| + | |
− | |
| + | |
− | *
| + | |
− | |
| + | |
− | |-
| + | |
− | | 4/3
| + | |
− | | Swing
| + | |
− | |
| + | |
− | *
| + | |
− | |
| + | |
− | |-
| + | |
− | | 4/4
| + | |
− | | Owl
| + | |
− | |
| + | |
− | *
| + | |
− | |
| + | |
− | |-
| + | |
− | | 4/4
| + | |
− | | Day
| + | |
− | |
| + | |
− | *
| + | |
− | |
| + | |
− | |-
| + | |
− | | 4/4
| + | |
− | | Swing
| + | |
− | |
| + | |
− | *
| + | |
− | |
| + | |
− | |-
| + | |
− | | 4/5
| + | |
− | | Owl
| + | |
− | |
| + | |
− | *
| + | |
− | |
| + | |
− | |-
| + | |
| | | |
| + | == Instructions for RC == |
| | | |
− | |}
| + | * Let the day shift know what to do while you attend the MCC meeting |
| + | * Copy the daily run plans for the previous week to the [[Run plan history]] |
| + | * Copy the [[Run Plan Template]] table to this page and change the dates |
| + | * Update the plan above (if necessary) after the MCC meeting |
| + | |
| + | [[Category:HOW TO]] [[Category:SL]] [[Category:RC]] |
| + | |
| + | <hr> |
The current day is indicated by a color.