== Daily Run Plan ==
 
  
Here are details of the daily run plan.  See also the [https://prex.jlab.org/wiki/index.php?title=RunPlan Global Run Plan].  The person responsible should ensure that
+
<br><br>
a crew of experts is available for the shift.  This schedule will be updated frequently by the Run Coordinator
+
[[Main_Page|<B>CREX Main</B>]] << [[Main_Page_PREXII|PREX II Main]] << [[Run Coordinator Tools]] <br><br>
as the situation on the ground changes. 
+
  
Previous daily run plans can be found here [[PreviousRunPlanDaily]]
+
[[PREX2RunPlan2019 | PREX Global Run Plan]] -- [[RunPlanDaily_CREX|CREX Daily Run Plan]]
<hr>
+
 
 +
== Current Daily Run Plans ==
 +
 
 +
The current day is indicated by a color.
 +
 
 +
{| class="wikitable" border="1" style="width:100%; text-align:left;border-collapse:collapse"
 +
|-
 +
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
  
{| border="1"
 
|+ Daily Run Plan for PREX &nbsp; <font color="blue">(latest at bottom)</font>
 
! Date (2010) !! Shift !!---------- Activity (Responsible) ----------!!---&nbsp;Status&nbsp;---
 
 
|-
 
|-
| Monday 3 May
+
| rowspan="3" | Wedsday, September 4
 
| Owl
 
| Owl
|
+
| Production 71uA
* Production
+
 
|
 
|
 
|-
 
|-
| Monday 3 May
 
 
| Day
 
| Day
|
+
| Moller
* Hall B Pass change 3 -> 5 until ~1:00PM
+
|  
* Compton vacuum, LHRS dipole UPS replacement during the down
+
* Bake compton chicane overnight during production, run beam straight through
+
* Return to PbD #2 production
+
* Large asymmetry run (Jon)
+
|
+
*
+
* Baking started, HRS work completed by Heidi
+
 
|-
 
|-
| Monday 3 May
 
 
| Swing
 
| Swing
|
+
| Moller
* Production
+
 
|
 
|
 
|-
 
|-
| Tuesday 4 May
+
| rowspan="3" | Thursday, September 5
 
| Owl
 
| Owl
|
+
| Production 71uA
* Production
+
 
|
 
|
 
|-
 
|-
| Tuesday 4 May
 
 
| Day
 
| Day
|
+
| Mott polarimetry measurements
* Work on switch for Pockels cell (start 9:00AM)
+
|  
* Complete Compton beam line bake-out, leak check, cavity alignment
+
|
+
 
|-
 
|-
| Tuesday 4 May
 
 
| Swing
 
| Swing
|
+
| Production 71uA
* Production
+
 
|
 
|
 
|-
 
|-
| Wednesday 5 May
+
| rowspan="3" | Friday, September 6
 
| Owl
 
| Owl
|
+
| Production 71uA
* Production
+
 
|
 
|
 
|-
 
|-
| Wednesday 5 May
 
 
| Day
 
| Day
|
+
| Production 85uA
* 12 hours Moller tests?
+
|  
|
+
 
|-
 
|-
| Wednesday 5 May
 
 
| Swing
 
| Swing
|
+
| Production 85uA
* Production
+
 
|
 
|
 
|-
 
|-
| Thursday 6 May
+
| rowspan="3" | Saturday, September 7
 
| Owl
 
| Owl
|
+
| Production 85uA
* Production
+
 
|
 
|
 
|-
 
|-
| Thursday 6 May
 
 
| Day
 
| Day
|
+
| Production 85uA
* Production
+
|  
|
+
 
|-
 
|-
| Thursday 6 May
 
 
| Swing
 
| Swing
|
+
| Production 85uA
* Possible Moller measurement ?  (TBD)
+
* Production
+
 
|
 
|
 
|-
 
|-
| Friday 7 May
+
|-style="background: #FCF3CF;
 +
| rowspan="3" | Sunday, September 8
 
| Owl
 
| Owl
|
+
| Production 85uA
* Q<sup>2</sup> and establish low-current cavities. (Bob)
+
* Production
+
 
|
 
|
 
|-
 
|-
| Friday 7 May
 
 
| Day
 
| Day
|
+
| Moller Polarimetry
* Production
+
|  
* Wien flip
+
|
+
 
|-
 
|-
| Friday 7 May
 
 
| Swing
 
| Swing
|
+
| Q2 measurement and Spectrometer rescattering
* Production
+
| https://prex.jlab.org/wiki/index.php/RescatteringPlan
|
+
 
|-
 
|-
| Saturday 8 May
+
| rowspan="3" | Monday, September 9
 
| Owl
 
| Owl
|
+
| Production 85uA
* Production
+
 
|
 
|
 
|-
 
|-
| Saturday 8 May
 
 
| Day
 
| Day
|
+
| SADness
* Production
+
| Scheduled Accelerator Down begins
|
+
|-
+
| Saturday 8 May
+
| Swing
+
|
+
* Production
+
|
+
|-
+
| Wednesday 5 May
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Wednesday 5 May
+
| Day
+
|
+
* Production
+
|
+
|-
+
| Wednesday 5 May
+
| Swing
+
|
+
* Production
+
|
+
|-
+
| Thursday 6 May
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Thursday 6 May
+
| Day
+
|
+
* Production
+
|
+
|-
+
| Thursday 6 May
+
| Swing
+
|
+
* Production
+
|
+
|-
+
| Friday 7 May
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Friday 7 May
+
| Day
+
|
+
* Production
+
|
+
|-
+
| Friday 7 May
+
| Swing
+
|
+
* Production
+
|
+
|-
+
| Saturday 8 May
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Saturday 8 May
+
| Day
+
|
+
* Production
+
|
+
|-
+
| Saturday 8 May
+
| Swing
+
|
+
* Production
+
|
+
|-
+
| Sunday 9 May
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Sunday 9 May
+
| Day
+
|
+
* Production
+
|
+
|-
+
| Sunday 9 May
+
| Swing
+
|
+
* Production
+
|
+
|-
+
| Monday 10 May
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Monday 10 May
+
| Day
+
|
+
* Production
+
|
+
|-
+
| Monday 10 May
+
| Swing
+
|
+
* Production
+
|
+
|-
+
| Tuesday 11 May
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Tuesday 11 May
+
| Day
+
|
+
* Production
+
|
+
|-
+
| Tuesday 11 May
+
| Swing
+
|
+
* Production
+
|
+
|-
+
| Wednesday 12 May
+
| Owl
+
|
+
* Production
+
|
+
|-
+
| Wednesday 12 May
+
| Day
+
|
+
* Production
+
|
+
 
|}
 
|}
 +
[[Run plan history | <B>Previous Daily Run Plans</B>]]
 +
 +
== Instructions for RC ==
 +
 +
* Let the day shift know what to do while you attend the MCC meeting
 +
* Copy the daily run plans for the previous week to the [[Run plan history]]
 +
* Copy the [[Run Plan Template]] table to this page and change the dates
 +
* Update the plan above (if necessary) after the MCC meeting
 +
 +
[[Category:HOW TO]] [[Category:SL]] [[Category:RC]]
 +
 +
<hr>

Latest revision as of 16:22, 5 December 2019



CREX Main << PREX II Main << Run Coordinator Tools

PREX Global Run Plan -- CREX Daily Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Wedsday, September 4 Owl Production 71uA
Day Moller
Swing Moller
Thursday, September 5 Owl Production 71uA
Day Mott polarimetry measurements
Swing Production 71uA
Friday, September 6 Owl Production 71uA
Day Production 85uA
Swing Production 85uA
Saturday, September 7 Owl Production 85uA
Day Production 85uA
Swing Production 85uA
Sunday, September 8 Owl Production 85uA
Day Moller Polarimetry
Swing Q2 measurement and Spectrometer rescattering https://prex.jlab.org/wiki/index.php/RescatteringPlan
Monday, September 9 Owl Production 85uA
Day SADness Scheduled Accelerator Down begins

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting