− | == Daily Run Plan ==
| |
| | | |
− | Here are details of the daily run plan. See also the [https://prex.jlab.org/wiki/index.php?title=RunPlan Global Run Plan]. The person responsible should ensure that
| + | <br><br> |
− | a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator
| + | [[Main_Page|<B>CREX Main</B>]] << [[Main_Page_PREXII|PREX II Main]] << [[Run Coordinator Tools]] <br><br> |
− | as the situation on the ground changes.
| + | |
| | | |
− | Previous daily run plans can be found here [[PreviousRunPlanDaily]]
| + | [[PREX2RunPlan2019 | PREX Global Run Plan]] -- [[RunPlanDaily_CREX|CREX Daily Run Plan]] |
− | <hr>
| + | |
| + | == Current Daily Run Plans == |
| + | |
| + | The current day is indicated by a color. |
| + | |
| + | {| class="wikitable" border="1" style="width:100%; text-align:left;border-collapse:collapse" |
| + | |- |
| + | ! style="width:10%"| Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status |
| | | |
− | {| border="1"
| |
− | |+ Daily Run Plan for PREX <font color="blue">(latest at bottom)</font>
| |
− | ! Date (2010) !! Shift !!---------- Activity (Responsible) ----------!!--- Status ---
| |
| |- | | |- |
− | | Monday 3 May | + | | rowspan="3" | Wedsday, September 4 |
| | Owl | | | Owl |
− | | | + | | Production 71uA |
− | * Production
| + | |
| | | | | |
| |- | | |- |
− | | Monday 3 May
| |
| | Day | | | Day |
− | | | + | | Moller |
− | * Hall B Pass change 3 -> 5 until ~1:00PM
| + | | |
− | * Compton vacuum, LHRS dipole UPS replacement during the down
| + | |
− | * Bake compton chicane overnight during production, run beam straight through
| + | |
− | * Return to PbD #2 production
| + | |
− | * Large asymmetry run (Jon)
| + | |
− | | | + | |
− | *
| + | |
− | * Baking started, HRS work completed by Heidi
| + | |
| |- | | |- |
− | | Monday 3 May
| |
| | Swing | | | Swing |
− | | | + | | Moller |
− | * Production
| + | |
| | | | | |
| |- | | |- |
− | | Tuesday 4 May | + | | rowspan="3" | Thursday, September 5 |
| | Owl | | | Owl |
− | | | + | | Production 71uA |
− | * Production
| + | |
| | | | | |
| |- | | |- |
− | | Tuesday 4 May
| |
| | Day | | | Day |
− | | | + | | Mott polarimetry measurements |
− | * Work on switch for Pockels cell (start 9:00AM)
| + | | |
− | * Complete Compton beam line bake-out, leak check, cavity alignment
| + | |
− | | | + | |
− | * Pockels cell switch work complete
| + | |
− | * Compton vacuum reopened
| + | |
| |- | | |- |
− | | Tuesday 4 May
| |
| | Swing | | | Swing |
| + | | Production 71uA |
| | | | | |
− | * Production
| |
− | |
| |
− | * Continued Compton realignment/laser polarization measurement
| |
| |- | | |- |
− | | Wednesday 5 May | + | | rowspan="3" | Friday, September 6 |
| | Owl | | | Owl |
| + | | Production 71uA |
| | | | | |
− | * Production
| |
− | |
| |
− | * Stopped work on Compton - still not complete
| |
− | * Changed beam spot size to 200x200um
| |
| |- | | |- |
− | | Wednesday 5 May
| |
| | Day | | | Day |
− | | | + | | Production 85uA |
− | * 12 hours Moller tests, start 9:00AM (Sasha, Jixie)
| + | | |
− | | | + | |
| |- | | |- |
− | | Wednesday 5 May
| |
| | Swing | | | Swing |
− | | | + | | Production 85uA |
− | * Finish Moller tests, 21:00
| + | |
− | * Raster clock tests 22:00-24:00 (KK, Bob, Jon)
| + | |
− | * Production as per raster clock tests
| + | |
| | | | | |
| |- | | |- |
− | | Thursday 6 May | + | | rowspan="3" | Saturday, September 7 |
| | Owl | | | Owl |
− | | | + | | Production 85uA |
− | * Production
| + | |
| | | | | |
| |- | | |- |
− | | Thursday 6 May
| |
| | Day | | | Day |
− | | | + | | Production 85uA |
− | * Beam Studies (8 hours controlled access starting 08:15)
| + | | |
− | ** Finish Compton cavity work (Sirish, Abdurahim)
| + | |
− | ** Start Compton pumping, replace leaky upstream valve? (John Heckman et al)
| + | |
− | ** Remove GEM(s)?? (Alex, Kiad)
| + | |
− | ** Compton Boron installation (Megan)
| + | |
− | | | + | |
− | * Continued compton cavity alignment
| + | |
− | * Boron installed
| + | |
− | * INFN GEMs removed to EEL, (additional UVA GEM installed?
| + | |
| |- | | |- |
− | | Thursday 6 May
| |
| | Swing | | | Swing |
| + | | Production 85uA |
| | | | | |
− | * Raster clock tests
| |
− | * Production
| |
− | |
| |
− | * CHL trip
| |
| |- | | |- |
− | | Friday 7 May | + | |-style="background: #FCF3CF; |
| + | | rowspan="3" | Sunday, September 8 |
| | Owl | | | Owl |
| + | | Production 85uA |
| | | | | |
− | * Raster clock tests (cont?)
| |
− | * Production
| |
− | |
| |
− | * Tests aborted due to network switch failure in the hall
| |
| |- | | |- |
− | | Friday 7 May
| |
| | Day | | | Day |
− | | | + | | Moller Polarimetry |
− | * Production
| + | | |
− | * Wien flip, QE scan, spot move (nominally 9:00AM)
| + | |
− | | | + | |
− | * Wien flip, QE scan, spot move completed.
| + | |
− | * Compton valve work continued until 2:00
| + | |
− | * Started detector alignment checks
| + | |
− | * Q<sup>2</sup> and establish low-current cavities (Dustin)
| + | |
| |- | | |- |
− | | Friday 7 May
| |
| | Swing | | | Swing |
− | | | + | | Q2 measurement and Spectrometer rescattering |
− | * Tests by KK et al
| + | | https://prex.jlab.org/wiki/index.php/RescatteringPlan |
− | * Production
| + | |
− | | | + | |
| |- | | |- |
− | | Saturday 8 May | + | | rowspan="3" | Monday, September 9 |
| | Owl | | | Owl |
− | | | + | | Production 85uA |
− | * Production
| + | |
| | | | | |
| |- | | |- |
− | | Saturday 8 May
| |
| | Day | | | Day |
− | | | + | | SADness |
− | * Production
| + | | Scheduled Accelerator Down begins |
− | * 2:00PM - Turn off cavity baking
| + | |
− | * 3:00PM - Leak check, turn on ion pumps
| + | |
− | * 4:00PM - Routine Moller Measurement
| + | |
− | | | + | |
− | * Compton vacuum reestablished
| + | |
− | * Replaced valve opens with sufficient vacuum levels
| + | |
− | |-
| + | |
− | | Saturday 8 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Moller
| + | |
− | |
| + | |
− | * Moller measurement gives 91% polarization
| + | |
− | |-
| + | |
− | | Sunday 9 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Sunday 9 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Compton ready?
| + | |
− | * Production
| + | |
− | |
| + | |
− | * Cavity locks at 3kW!
| + | |
− | * Valve upstream of chicane will not open
| + | |
− | |-
| + | |
− | | Sunday 9 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Monday 10 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | * Left dipole down
| + | |
− | * Compton valve stuck
| + | |
− | |-
| + | |
− | | Monday 10 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Fix left dipole
| + | |
− | * Fix Compton valve
| + | |
− | * Fix target vacuum
| + | |
− | |
| + | |
− | * Left dipole down
| + | |
− | * Compton valve fixed and tested
| + | |
− | * Target vacuum bad
| + | |
− | |-
| + | |
− | | Monday 10 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Standby
| + | |
− | * Empty or C target oversampling runs if valves can be opened
| + | |
− | * 1-arm production if target vacuum < 5E-5
| + | |
− | |
| + | |
− | * Left dipole down
| + | |
− | * Target vacuum bad
| + | |
− | |-
| + | |
− | | Tuesday 11 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Standby
| + | |
− | * Empty or C target oversampling runs if valves can be opened
| + | |
− | * 1-arm production if target vacuum < 5E-5
| + | |
− | |
| + | |
− | |-
| + | |
− | | Tuesday 11 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Wien flip
| + | |
− | * Beam studies -- injector studies
| + | |
− | * Raster setup
| + | |
− | * Fix left dipole
| + | |
− | * Fix target vacuum
| + | |
− | |
| + | |
− | |-
| + | |
− | | Tuesday 11 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Compton tune
| + | |
− | * Oversampling tests
| + | |
− | |
| + | |
− | * Left dipole down
| + | |
− | * Right dipole NMR down
| + | |
− | * Target vacuum bad
| + | |
− | |-
| + | |
− | | Wednesday 12 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | * Left dipole down
| + | |
− | * Right dipole NMR down
| + | |
− | * Target vacuum bad
| + | |
− | |-
| + | |
− | | Wednesday 12 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Repair left dipole PS
| + | |
− | * Repair right dipole NMR
| + | |
− | * Repair right Q3 bad bit
| + | |
− | |
| + | |
− | * Target vacuum bad
| + | |
− | |-
| + | |
− | | Wednesday 12 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Standby
| + | |
− | |
| + | |
− | * Left dipole down
| + | |
− | * Left Q3 controls problem
| + | |
− | * Target vacuum bad
| + | |
− | |-
| + | |
− | | Thursday 13 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Standby
| + | |
− | |
| + | |
− | * Left dipole down
| + | |
− | * Left Q3 controls problem
| + | |
− | * Target vacuum bad
| + | |
− | |-
| + | |
− | | Thursday 13 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Repair left dipole PS
| + | |
− | * Repair left Q3 controls
| + | |
− | * Find and stop target vacuum leak
| + | |
− | * Warm up target
| + | |
− | |
| + | |
− | |-
| + | |
− | | Thursday 13 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Warm up target
| + | |
− | |
| + | |
− | |-
| + | |
− | | Friday 14 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Pump down target
| + | |
− | |
| + | |
− | |-
| + | |
− | | Friday 14 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Pump down target
| + | |
− | |
| + | |
− | |-
| + | |
− | | Friday 14 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Cool target
| + | |
− | * Re-establish beam
| + | |
− | * Raster tests
| + | |
− | |
| + | |
− | * Target vacuum good
| + | |
− | * Both spectrometers good
| + | |
− | |-
| + | |
− | | Saturday 15 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Saturday 15 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Access for left dipole regulation
| + | |
− | |
| + | |
− | * Left dipole regulation failed
| + | |
− | * Target vacuum increase, then decrease with added heating
| + | |
− | |-
| + | |
− | | Saturday 15 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Access for left dipole regulation
| + | |
− | * Re-establish beam
| + | |
− | * Møller
| + | |
− | |
| + | |
− | * Left dipole regulation bad
| + | |
− | * Target vacuum varying, mostly < 1e5
| + | |
− | |-
| + | |
− | | Sunday 16 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Møller
| + | |
− | |
| + | |
− | * Left dipole regulation bad
| + | |
− | * Target vacuum varying, mostly < 1e5
| + | |
− | |-
| + | |
− | | Sunday 16 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Access for left dipole regulation
| + | |
− | |
| + | |
− | * Target vacuum varying, mostly < 1e5
| + | |
− | |-
| + | |
− | | Sunday 16 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Production
| + | |
− | * Background test (L PMTs on)
| + | |
− | |
| + | |
− | * Left dipole regulation bad
| + | |
− | * Target vacuum varying, mostly < 1e5
| + | |
− | |-
| + | |
− | | Monday 17 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Monday 17 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Controlled Access for Left Dipole fix
| + | |
− | * Moller refilled
| + | |
− | |
| + | |
− | * Left dipole working for now
| + | |
− | * Suspect bad silicon-controlled rectifier (SCR)
| + | |
− | * There are 12 needed and only 6 spares
| + | |
− | * Looking for spares and will work during beam studies Tue.
| + | |
− | |-
| + | |
− | | Monday 17 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Production with both arms!
| + | |
− | |
| + | |
− | |-
| + | |
− | | Tuesday 18 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Production (hopefully with both arms!)
| + | |
− | |
| + | |
− | * No Left Dipole issues all night
| + | |
− | |-
| + | |
− | | Tuesday 18 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Beam Studies, beginning 9am (8hrs)
| + | |
− | * Wien Flip
| + | |
− | * Maintenance on the Left Dipole Power supply
| + | |
− | |
| + | |
− | * Wien Flip completed before beam studies
| + | |
− | * Beam studies completed
| + | |
− | * Measurements performed on Left Dipole Power supply
| + | |
− | |-
| + | |
− | | Tuesday 18 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Production
| + | |
− | * Oversample tests (Rupesh)
| + | |
− | |
| + | |
− | * Compton not done
| + | |
− | * Oversample tests not done
| + | |
− | |-
| + | |
− | | Wednesday 19 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Production
| + | |
− | * Oversample tests
| + | |
− | |
| + | |
− | * Oversample tests completed
| + | |
− | |-
| + | |
− | | Wednesday 19 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Compton Tuning (1-2hrs, start around 10am)
| + | |
− | * Raster tests during 'target vacuum recovery'
| + | |
− | * Production
| + | |
− | |
| + | |
− | * Injector tuning did not help Compton rates
| + | |
− | * Jay and Yan are asking for advice
| + | |
− | * Compton tuning during beam studies tomorrow
| + | |
− | |-
| + | |
− | | Wednesday 19 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Production
| + | |
− | * Q2 and detector alignment (2-3hrs, around 8pm)
| + | |
− | |
| + | |
− | * short Q2 measurement
| + | |
− | * Target vacuum tripped valves closed -> no beam
| + | |
− | |-
| + | |
− | | Thursday 20 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | * No beam - target operator only
| + | |
− | |-
| + | |
− | | Thursday 20 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Beam Studies (start at 8:30am, afternoon for Compton tuning)
| + | |
− | * Some measurements on left dipole power supply by Jack in Hall
| + | |
− | * Production
| + | |
− | |
| + | |
− | * Compton tuning needs to be rescheduled
| + | |
− | * Jack did some work in hall
| + | |
− | |-
| + | |
− | | Thursday 20 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | | We lost the target vacuum. Will need to warm up target and replace O-ring after letting radiation subside. Plan to replace O-ring on Monday May 24.
| + | |
− | |-
| + | |
− | | Friday 21 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Friday 21 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Friday 21 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Saturday 22 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Saturday 22 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Saturday 22 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Sunday 23 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Sunday 23 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Sunday 23 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Monday 24 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Monday 24 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Various tests
| + | |
− | **Pedestal runs
| + | |
− | **linearity studies
| + | |
− | **detector time constant tests
| + | |
− | **GEM studies
| + | |
− | * Target repairs - replace o-ring with silicon one temporarily
| + | |
− | * Keep target warm and pump down
| + | |
− | * Leak check
| + | |
− | |
| + | |
− | |-
| + | |
− | | Monday 24 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Pedestal runs
| + | |
− | |
| + | |
− | |-
| + | |
− | | Tuesday 25 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Tuesday 25 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Beam Studies (until between 10am and noon)
| + | |
− | * Pedestal runs
| + | |
− | |Kalres O-ring installed ahead of schedule. Pumping down.
| + | |
− | |
| + | |
− | |-
| + | |
− | | Tuesday 25 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Pedestal runs
| + | |
− | |
| + | |
− | |-
| + | |
− | | Wednesday 26 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Wednesday 26 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Accelerator Vacuum Group in Hall for Leak checks
| + | |
− | * Switch box arrived for activate remotely the heating and cooling of thetarget
| + | |
− | |
| + | |
− | * Found a leak, but pressure stable at 675 mtor
| + | |
− | * Electrician will install the appropriate outlet; R. Michaels is working on the remote control.
| + | |
− | |
| + | |
− | |-
| + | |
− | | Wednesday 26 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Thursday 27 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Thursday 27 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Accelerator Vacuum Group in Hall for Leak checks
| + | |
− | |
| + | |
− | |-
| + | |
− | | Thursday 27 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Friday 28 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Friday 28 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Shift workers on Standby
| + | |
− | * Accelerator Vacuum Group in Hall for Leak checks
| + | |
− | |
| + | |
− | |-
| + | |
− | | Friday 28 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Saturday 29 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Saturday 29 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Saturday 29 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Sunday 30 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Sunday 30 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Sunday 30 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Monday 31 May
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Monday 31 May
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Monday 31 May
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Tuesday 1 June
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Tuesday 1 June
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Tuesday 1 June
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Wednesday 2 June
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Wednesday 2 June
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Wednesday 2 June
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Thursday 3 June
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Canceled
| + | |
− | |
| + | |
− | |-
| + | |
− | | Thursday 3 June
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Cooling down target (more likely to start on Swing)
| + | |
− | * Day shift on standby.
| + | |
− | |
| + | |
− | |-
| + | |
− | | Thursday 3 June
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Swing shift workers are needed.
| + | |
− | **PREX detector in counting mode
| + | |
− | ** resume beam in Compton chicane ( MCC )
| + | |
− | ** harp scan for beam profile and beam position ( Shift crew - MCC )
| + | |
− | ** raster check ( Shift crew )
| + | |
− | ** Long down target recovery procedure ( Shift crew )
| + | |
− | * Alignment checks, Q2 ( Dustin Mc Nulty ).
| + | |
− | ** put sieve in
| + | |
− | ** take alignement data
| + | |
− | ** put sieve out
| + | |
− | ** Q2 measurement
| + | |
− | ** Ask for access to go to integrating mode ( Jon Wrexler or Amhed Zafar )
| + | |
− | * Restart Production
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Friday 4 June
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Friday 4 June
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Friday 4 June
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Saturday 5 June
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Saturday 5 June
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Saturday 5 June
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Sunday 6 June
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Sunday 6 June
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Sunday 6 June
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Monday 7 June
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Monday 7 June
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Monday 7 June
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Tuesday 8 June
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Tuesday 8 June
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Tuesday 8 June
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Wednesday 9 June
| + | |
− | | Owl
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Wednesday 9 June
| + | |
− | | Day
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
− | |-
| + | |
− | | Wednesday 9 June
| + | |
− | | Swing
| + | |
− | |
| + | |
− | * Production
| + | |
− | |
| + | |
| |} | | |} |
| + | [[Run plan history | <B>Previous Daily Run Plans</B>]] |
| + | |
| + | == Instructions for RC == |
| + | |
| + | * Let the day shift know what to do while you attend the MCC meeting |
| + | * Copy the daily run plans for the previous week to the [[Run plan history]] |
| + | * Copy the [[Run Plan Template]] table to this page and change the dates |
| + | * Update the plan above (if necessary) after the MCC meeting |
| + | |
| + | [[Category:HOW TO]] [[Category:SL]] [[Category:RC]] |
| + | |
| + | <hr> |
The current day is indicated by a color.