Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to: navigation, search
m
 
(247 intermediate revisions by 11 users not shown)
Line 1: Line 1:
<span style="color:red">In the process of editing and updating this page. Please contact Juliette Mammei <B>[mailto:crowder@jlab.org?Subject=PREXwiki crowder@jlab.org]</B> with questions or suggestions.</span>
+
 
 
<br><br>
 
<br><br>
[[Main_Page|<B>PREX Main</B>]] << [[Run Coordinator Tools]] <br><br>
+
[[Main_Page|<B>CREX Main</B>]] << [[Main_Page_PREXII|PREX II Main]] << [[Run Coordinator Tools]] <br><br>
  
[[PREX2RunPlan2019 | Global Run Plan]]
+
[[PREX2RunPlan2019 | PREX Global Run Plan]] -- [[RunPlanDaily_CREX|CREX Daily Run Plan]]
  
 
== Current Daily Run Plans ==
 
== Current Daily Run Plans ==
Line 12: Line 12:
 
|-  
 
|-  
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 +
 
|-
 
|-
| rowspan="3" | Monday, July 8
+
| rowspan="3" | Wedsday, September 4
|Owl
+
| Owl
| no beam
+
| Production 71uA
 +
|
 +
|-
 +
| Day
 +
| Moller
 
|  
 
|  
 
|-
 
|-
|Day
+
| Swing
|High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
+
| Moller
|Production CW ,
+
|
 
|-
 
|-
|Swing
+
| rowspan="3" | Thursday, September 5
|High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
+
| Owl
|Production CW
+
| Production 71uA
|-
+
|
| rowspan="3" | Tuesday, July 9
+
|Owl
+
| High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
+
| Parasitic CW ,  tuning for higher passes
+
|-
+
|Day
+
| Low current, different triggers on C, Pb
+
| Parasitic CW ,  tuning for higher passes
+
|-
+
|Swing
+
|Low current GEMS,Sieve/switch to integrating (and remove S0?)
+
|Parasitic CW ,  tuning for higher passes
+
|-
+
| rowspan="3" | Wednesday, July 10
+
|Owl
+
| Detector alignment and low current counting mode
+
|CW low current
+
 
|-
 
|-
 
| Day
 
| Day
| High current Isotopic Lead,set HVs, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
+
| Mott polarimetry measurements
| 50uA
+
|  
 
|-
 
|-
 
| Swing
 
| Swing
| Moller commissioning
+
| Production 71uA
| <2uA
+
|
 
|-
 
|-
| rowspan="3" | Thursday, July 11
+
| rowspan="3" | Friday, September 6
|Owl
+
| Owl
|Finish Moller commissioning, 50uA production runs isotopic lead (BMW, Aq feedabck, FFB on)
+
| Production 71uA
|Experts are looking at data, FFB was not working
+
|
 
|-
 
|-
 
| Day
 
| Day
| Hysteresis recovery, machine retuning
+
| Production 85uA
| Hysteresis recovery done, no beam in the hall.
+
|-
+
| Swing
+
| No beam in the hall
+
 
|  
 
|  
|-
 
| rowspan="3" | Friday, July 12
 
|Owl
 
|Planned to 208Pb production and understand noise problem (Cip). Call Paul King+ Cameron for raster sync studies 
 
|No beam in the hall
 
|-
 
| Day
 
| Expecting beam around noon. After beam comes, try for FFB. If it doesn't work within 30min, go to 208Pb production data and understand noise problem (call Ciprian)
 
| No beam in the hall
 
 
|-
 
|-
 
| Swing
 
| Swing
| Try FFB and 208Pb production.
+
| Production 85uA
| No beam in the hall
+
|
|-  
+
|-
| rowspan="3" | Saturday, July 13
+
| rowspan="3" | Saturday, September 7
|Owl
+
| Owl
|Ask MCC to tune 65 uA to dump and then ask them to try fast feedback. Give them ~30 min for FFB. Planned to 208Pb production and understand noise problem (call Ciprian). 
+
| Production 85uA
| no beam in the hall
+
|
 
|-
 
|-
 
| Day
 
| Day
| Continue with owl shift plan.
+
| Production 85uA
| No beam
+
|  
 
|-
 
|-
 
| Swing
 
| Swing
| Continue with today's owl shift plan
+
| Production 85uA
| got beam ~8 pm. Checked raster size and started production data taking without FFB
+
|
 
|-
 
|-
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;
| rowspan="3" | Sunday, July 14
+
| rowspan="3" | Sunday, September 8
|Owl
+
| Owl
| Production+ analysis. FFB (30 min), BMW (30 min), Aq 
+
| Production 85uA
|  
+
|
 
|-
 
|-
|-style="background: #FCF3CF;
 
 
| Day
 
| Day
|  
+
| Moller Polarimetry
 
|  
 
|  
 
|-
 
|-
|-style="background: #FCF3CF;
 
 
| Swing
 
| Swing
|  
+
| Q2 measurement and Spectrometer rescattering
 +
| https://prex.jlab.org/wiki/index.php/RescatteringPlan
 +
|-
 +
| rowspan="3" | Monday, September 9
 +
| Owl
 +
| Production 85uA
 
|
 
|
 
|-
 
|-
 +
| Day
 +
| SADness
 +
| Scheduled Accelerator Down begins
 
|}
 
|}
 +
[[Run plan history | <B>Previous Daily Run Plans</B>]]
  
 
== Instructions for RC ==
 
== Instructions for RC ==

Latest revision as of 16:22, 5 December 2019



CREX Main << PREX II Main << Run Coordinator Tools

PREX Global Run Plan -- CREX Daily Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Wedsday, September 4 Owl Production 71uA
Day Moller
Swing Moller
Thursday, September 5 Owl Production 71uA
Day Mott polarimetry measurements
Swing Production 71uA
Friday, September 6 Owl Production 71uA
Day Production 85uA
Swing Production 85uA
Saturday, September 7 Owl Production 85uA
Day Production 85uA
Swing Production 85uA
Sunday, September 8 Owl Production 85uA
Day Moller Polarimetry
Swing Q2 measurement and Spectrometer rescattering https://prex.jlab.org/wiki/index.php/RescatteringPlan
Monday, September 9 Owl Production 85uA
Day SADness Scheduled Accelerator Down begins

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting