Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to: navigation, search
(Current Daily Run Plans)
m
 
(235 intermediate revisions by 10 users not shown)
Line 1: Line 1:
<span style="color:red">In the process of editing and updating this page. Please contact Juliette Mammei <B>[mailto:crowder@jlab.org?Subject=PREXwiki crowder@jlab.org]</B> with questions or suggestions.</span>
+
 
 
<br><br>
 
<br><br>
[[Main_Page|<B>PREX Main</B>]] << [[Run Coordinator Tools]] <br><br>
+
[[Main_Page|<B>CREX Main</B>]] << [[Main_Page_PREXII|PREX II Main]] << [[Run Coordinator Tools]] <br><br>
  
[[PREX2RunPlan2019 | Global Run Plan]]
+
[[PREX2RunPlan2019 | PREX Global Run Plan]] -- [[RunPlanDaily_CREX|CREX Daily Run Plan]]
  
 
== Current Daily Run Plans ==
 
== Current Daily Run Plans ==
Line 12: Line 12:
 
|-  
 
|-  
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 +
 
|-
 
|-
| rowspan="3" | Monday, July 15
+
| rowspan="3" | Wedsday, September 4
|Owl
+
| Owl
| Production+ analysis. 
+
| Production 71uA
| Except ~3 hour down time, we took good data
+
|
 
|-
 
|-
 
| Day
 
| Day
| FFB commissioning until 10AM. Take run with FFB (if ready) or w/o FFB (if not ready) until MOLLER experts walk in for MOLLER commissioning.
+
| Moller
| MOLLER polarimeter commissioning is going on
+
|  
 
|-
 
|-
 
| Swing
 
| Swing
|MOLLER commissioning
+
| Moller
 
|
 
|
 
|-
 
|-
| rowspan="3" | Tuesday, July 16
+
| rowspan="3" | Thursday, September 5
|Owl
+
| Owl
|MOLLER Polarimeter and FFB commissioning 
+
| Production 71uA
|  
+
|
 
|-
 
|-
 
| Day
 
| Day
| production after pass change
+
| Mott polarimetry measurements
 
|  
 
|  
 
|-
 
|-
 
| Swing
 
| Swing
|change IHWP ('out'), BPM and BCM calibration (Caryn)
+
| Production 71uA
|Done
+
|
 
|-
 
|-
| rowspan="3" | Wednesday, July 17
+
| rowspan="3" | Friday, September 6
|Owl
+
| Owl
|Production with 50uA with Aq, BMW and Energy-mode:'RF-off' 
+
| Production 71uA
|  
+
|
 
|-
 
|-
 
| Day
 
| Day
|
+
| Production 85uA
 
|  
 
|  
 
|-
 
|-
 
| Swing
 
| Swing
|50-70 microAmp production, FFB, Detector and SAM calibration
+
| Production 85uA
 +
|
 
|-
 
|-
|-style="background: #FCF3CF;
+
| rowspan="3" | Saturday, September 7
| rowspan="3" | Wednesday, July 18
+
| Owl
|Owl
+
| Production 85uA
|Production with 50uA with Aq, BMW and Energy-mode:'RF-off' 
+
|
 +
|-
 +
| Day
 +
| Production 85uA
 
|  
 
|  
 +
|-
 +
| Swing
 +
| Production 85uA
 +
|
 
|-
 
|-
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;
 +
| rowspan="3" | Sunday, September 8
 +
| Owl
 +
| Production 85uA
 +
|
 +
|-
 
| Day
 
| Day
| 70 microAmp production, FFB, Detector and SAM calibration
+
| Moller Polarimetry
 
|  
 
|  
 
|-
 
|-
|-style="background: #FCF3CF;
 
 
| Swing
 
| Swing
|
+
| Q2 measurement and Spectrometer rescattering
 +
| https://prex.jlab.org/wiki/index.php/RescatteringPlan
 +
|-
 +
| rowspan="3" | Monday, September 9
 +
| Owl
 +
| Production 85uA
 
|
 
|
 
|-
 
|-
 +
| Day
 +
| SADness
 +
| Scheduled Accelerator Down begins
 
|}
 
|}
 +
[[Run plan history | <B>Previous Daily Run Plans</B>]]
  
 
== Instructions for RC ==
 
== Instructions for RC ==

Latest revision as of 16:22, 5 December 2019



CREX Main << PREX II Main << Run Coordinator Tools

PREX Global Run Plan -- CREX Daily Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Wedsday, September 4 Owl Production 71uA
Day Moller
Swing Moller
Thursday, September 5 Owl Production 71uA
Day Mott polarimetry measurements
Swing Production 71uA
Friday, September 6 Owl Production 71uA
Day Production 85uA
Swing Production 85uA
Saturday, September 7 Owl Production 85uA
Day Production 85uA
Swing Production 85uA
Sunday, September 8 Owl Production 85uA
Day Moller Polarimetry
Swing Q2 measurement and Spectrometer rescattering https://prex.jlab.org/wiki/index.php/RescatteringPlan
Monday, September 9 Owl Production 85uA
Day SADness Scheduled Accelerator Down begins

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting