Line 45: Line 45:
 
|-
 
|-
 
| Day
 
| Day
|
+
| HallB tuning no beam and frame hunting I
 
|  
 
|  
 
|-
 
|-
 
| Swing
 
| Swing
|50-70 microAmp production, FFB, Detector and SAM calibration
+
|frame hunting II, current scan, Detector and SAM calibration and 70uA production with 12x7.2 raster
 +
|SAM3 saturation at 70uA?
 
|-
 
|-
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;
 
| rowspan="3" | Wednesday, July 18
 
| rowspan="3" | Wednesday, July 18
 
|Owl
 
|Owl
|Production with 50uA with Aq, BMW and Energy-mode:'RF-off'  
+
|IA, PITA scan at 70uA, 50uA production with with Aq (HallA and C), BMW and FFB off   
 
|  
 
|  
 
|-
 
|-
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;
 
| Day
 
| Day
| 70 microAmp production, FFB, Detector and SAM calibration  
+
| 50 microAmp production, PQB study, FFB test, BPM gain calibration at 70uA, BCM gain setting, Moller DAQ, BCM, Compton   
 
|  
 
|  
 
|-
 
|-

Revision as of 11:14, 18 July 2019

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Monday, July 15 Owl Production+ analysis. Except ~3 hour down time, we took good data
Day FFB commissioning until 10AM. Take run with FFB (if ready) or w/o FFB (if not ready) until MOLLER experts walk in for MOLLER commissioning. MOLLER polarimeter commissioning is going on
Swing MOLLER commissioning
Tuesday, July 16 Owl MOLLER Polarimeter and FFB commissioning
Day production after pass change
Swing change IHWP ('out'), BPM and BCM calibration (Caryn) Done
Wednesday, July 17 Owl Production with 50uA with Aq, BMW and Energy-mode:'RF-off'
Day HallB tuning no beam and frame hunting I
Swing frame hunting II, current scan, Detector and SAM calibration and 70uA production with 12x7.2 raster SAM3 saturation at 70uA?
Wednesday, July 18 Owl IA, PITA scan at 70uA, 50uA production with with Aq (HallA and C), BMW and FFB off
Day 50 microAmp production, PQB study, FFB test, BPM gain calibration at 70uA, BCM gain setting, Moller DAQ, BCM, Compton
Swing

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting