Difference between revisions of "RunPlanDaily"
From PREX Wiki
(→Current Daily Run Plans) |
(→Current Daily Run Plans) |
||
Line 45: | Line 45: | ||
|- | |- | ||
| Day | | Day | ||
− | | | + | | HallB tuning no beam and frame hunting I |
| | | | ||
|- | |- | ||
| Swing | | Swing | ||
− | | | + | |frame hunting II, current scan, Detector and SAM calibration and 70uA production with 12x7.2 raster |
+ | |SAM3 saturation at 70uA? | ||
|- | |- | ||
|-style="background: #FCF3CF; | |-style="background: #FCF3CF; | ||
| rowspan="3" | Wednesday, July 18 | | rowspan="3" | Wednesday, July 18 | ||
|Owl | |Owl | ||
− | | | + | |IA, PITA scan at 70uA, 50uA production with with Aq (HallA and C), BMW and FFB off |
| | | | ||
|- | |- | ||
|-style="background: #FCF3CF; | |-style="background: #FCF3CF; | ||
| Day | | Day | ||
− | | | + | | 50 microAmp production, PQB study, FFB test, BPM gain calibration at 70uA, BCM gain setting, Moller DAQ, BCM, Compton |
| | | | ||
|- | |- |
Revision as of 11:14, 18 July 2019
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Monday, July 15 | Owl | Production+ analysis. | Except ~3 hour down time, we took good data |
Day | FFB commissioning until 10AM. Take run with FFB (if ready) or w/o FFB (if not ready) until MOLLER experts walk in for MOLLER commissioning. | MOLLER polarimeter commissioning is going on | |
Swing | MOLLER commissioning | ||
Tuesday, July 16 | Owl | MOLLER Polarimeter and FFB commissioning | |
Day | production after pass change | ||
Swing | change IHWP ('out'), BPM and BCM calibration (Caryn) | Done | |
Wednesday, July 17 | Owl | Production with 50uA with Aq, BMW and Energy-mode:'RF-off' | |
Day | HallB tuning no beam and frame hunting I | ||
Swing | frame hunting II, current scan, Detector and SAM calibration and 70uA production with 12x7.2 raster | SAM3 saturation at 70uA? | |
Wednesday, July 18 | Owl | IA, PITA scan at 70uA, 50uA production with with Aq (HallA and C), BMW and FFB off | |
Day | 50 microAmp production, PQB study, FFB test, BPM gain calibration at 70uA, BCM gain setting, Moller DAQ, BCM, Compton | ||
Swing |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting