Difference between revisions of "RunPlanDaily"
From PREX Wiki
(→Current Daily Run Plans) |
|||
Line 237: | Line 237: | ||
| Day | | Day | ||
| Compton tuning | | Compton tuning | ||
− | | | + | | |
|-style="background: #FCF3CF; | |-style="background: #FCF3CF; | ||
| Swing | | Swing | ||
− | | Production | + | | Production 71uA<br>Energy measurement |
− | | | + | | Parasitic energy measurement during production |
|- | |- | ||
| rowspan="3" | Wednesday, August 28 | | rowspan="3" | Wednesday, August 28 |
Revision as of 14:24, 27 August 2019
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Monday, August 12 | Owl | Production running at 70uA with | |
Day |
|
||
Swing | Production running at 70uA | ||
Tuesday, August 13 | Owl | Production running at 70uA | |
Day |
| ||
Swing | Transverse Polarized Measurement | roduction running until beam was taken away for Hall B. | |
Wednesday, August 14 | Owl | Transverse Polarized Measurement | |
Day |
|
| |
Swing
|
Production running at 70uAroduction running until beam was taken away for Hall B. |
| |
Thursday, August 15 | Owl | Production running at 70uA | |
Day | Production running at 70uA | ||
Swing | Production running at 70uA |
| |
Friday, August 16 | Owl | Production running at 70uA | Beam off at 7 AM to cool down the hall prior to Compton work |
Day |
|
| |
Swing | Production running at 70uA | No beam due to CHL and Hall B restore | |
Saturday, August 17 | Owl | Production running at 70uA | No beam due to CHL and Hall B restore |
Day | Production running at 70uA |
| |
Swing | Production running at 70uA | Garrett | |
Sunday, August 18 | Owl | Production running at 70uA | |
Day | Moller measurement | ||
Swing | Production running at 70uA |
| |
Monday, August 19 | Owl | Production running at 70uA | |
Day | Production running at 70uA | ||
Swing | Production running at 70uA | ||
Tuesday, August 20 | Owl | Production running at 70uA | |
Day | Production running at 70uA | ||
Swing | Production running at 70uA | ||
Wednesday, August 21 | Owl | Production running at 70uA | |
Day | Moller | Moller measurement reproduced the previous results, seeing ~2% difference between IHWP IN/OUT. Compton shows the similar difference. | |
Swing | Q2 measurement | Ran smoothly based on the run plan, measured Qsq for difference Pb targets that were used, initial analysis shows stable Qsq for diff targets. Also took data for C 1% and 40Ca. Wrapped up by midnight. | |
Thursday, August 22 | Owl | Production running at 70uA | Production running on Pb5. High compton background rates observed (3-3.5kHz). Need to address it after Wien flip. |
Day | Wien flip | Beam taken away at 8:30. Mott measurements before Wien flip. MCC will have an access to fix a viewer. Caryn's injector work (IHWP, PC check) in the meantime. | |
Swing | Wien flip and beam restoration | Mott measurement after the Wien flip, shows consistent results between IHWP IN and OUT within uncertainty. Followed by PQB check. | |
Friday, August 23 | Owl | Production, 70uA | Beam restoration starting with Hall B tuning. Beam back to Hall A around the middle of swing, recived 70uA, straight through. |
Day | Production, 70uA | Production running until beam was taken away for Hall B and Hall A Compton. Compton commissioning (to reduce downstream background rates). Injector re-tune. | |
Swing | Production running at 70uA | Beam back to Hall A (mid-swing), sent through the Compton Chicane. Compton backgrounroduction running until beam was taken away for Hall B.d rates are still higher than before (fluctuating between 4-5kHz) | |
Saturday, August 24 | Owl | Production, 70uA | |
Day | Production, 70uA | Beam taken away for Hall B tuning around noon. 6.5hours of total downtime. opportunistic access in the meantime to reset AHU, more shielding added, left side camera control box reset. | |
Swing | Production running at 70uA | Beam back at 6pm. Steady production running since then. | |
Sunday, August 25 | Owl | Production, 70uA | |
Day | Production, 70uA | ||
Swing | Production running at 70uA | ||
Monday, August 26 | Owl | Production, 70uA | |
Day | Moller | ||
Swing | Production, 70uA | No compton, got straight through beam | |
Tuesday, August 27 | Owl | Production, 70uA | No compton, got straight through beam |
Day | Compton tuning | ||
Swing | Production 71uA Energy measurement |
Parasitic energy measurement during production | |
Wednesday, August 28 | Owl | ||
Day | |||
Swing |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting