Difference between revisions of "RunPlanDaily"
From PREX Wiki
(→Daily Run Plan) |
ZAFAR AHMED (Talk | contribs) (→Daily Run Plan) |
||
Line 26: | Line 26: | ||
* Septum checkout (Michaels: Page when beam imminent & spectrometer ready) | * Septum checkout (Michaels: Page when beam imminent & spectrometer ready) | ||
also: | also: | ||
− | * Initial look at low current cavity monitors ( | + | * Initial look at low current cavity monitors (Ahmed: Page when beam imminent & spectrometer ready) |
* Target alignment (Michaels) | * Target alignment (Michaels) | ||
* VDC checkout (Michaels) | * VDC checkout (Michaels) | ||
Line 58: | Line 58: | ||
* Benesch tuning (1/2 - 2 hours) | * Benesch tuning (1/2 - 2 hours) | ||
* Verify quad polarities (Camsonne) | * Verify quad polarities (Camsonne) | ||
− | * Cavity monitors basic function test ( | + | * Cavity monitors basic function test (Ahmed) |
− | * Low current cavity monitors setup (Musson, | + | * Low current cavity monitors setup (Musson, Ahmed) |
| done | | done | ||
|- | |- | ||
Line 65: | Line 65: | ||
| Owl | | Owl | ||
| | | | ||
− | * Low current cavity monitors setup (Musson, | + | * Low current cavity monitors setup (Musson, Ahmed) |
* Access for GEM installation (Camsonne) | * Access for GEM installation (Camsonne) | ||
| done but GEMs not ready | | done but GEMs not ready | ||
Line 89: | Line 89: | ||
| Swing | | Swing | ||
| | | | ||
− | * Low current cavity monitors setup (Michaels, | + | * Low current cavity monitors setup (Michaels, Ahmed) |
* Remove sieves | * Remove sieves | ||
* Initial look at sieve out data | * Initial look at sieve out data | ||
Line 592: | Line 592: | ||
* Thick Carbon Integrating Mode Run - Rupesh. | * Thick Carbon Integrating Mode Run - Rupesh. | ||
* Thick Carbon Dithering Run - Rupesh + Luis. | * Thick Carbon Dithering Run - Rupesh + Luis. | ||
− | * Take Access: Change to counting mode and put sieve in - | + | * Take Access: Change to counting mode and put sieve in - Ahmed. |
| | | | ||
|- | |- |
Revision as of 11:07, 16 April 2010
Daily Run Plan
Here are details of the daily run plan. See also the Global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.
Date (2010) | Shift | ---------- Activity (Responsible) ---------- | --- Status --- |
---|---|---|---|
03/19 | Day | pump down; Møller, Compton, septum install; Q2 repair Insert sieve. (Techs) |
done |
03/19 | Swing | Beam restore (B-team) | done |
03/20 | Owl |
also:
|
done
All at 1-2 µA.
"Usual" polarity |
03/20 | Day | Beam off & hall open 9:00 am Quads repair; Compton install; GEM install; signals debugging. Leave sieves in. (Techs) |
done |
03/20 | Swing |
|
done |
3/21 | Owl |
|
done but GEMs not ready |
3/21 | Day |
|
done |
3/21 | Swing |
|
done |
3/22 | Owl |
|
done |
3/22 | Day |
|
done |
3/22 | Swing |
|
done |
3/23 | Owl |
|
done |
3/23 | Day |
|
water cell removed, rest not finished |
3/23 | Swing |
|
done |
3/24 | Owl |
|
done |
3/24 | Day |
|
done |
3/24 | Swing |
|
done |
3/25 | Owl |
|
in progress |
3/25 | Day |
|
done |
3/25 | Swing |
|
postponed |
3/26 | Owl |
|
in progress |
3/26 | Day |
|
postponed |
3/26 | Swing |
|
partly done |
3/27 | Owl | no beam | |
3/27 | Day | no beam | |
3/27 | Swing |
|
done, high-current tests continue |
3/28 | Owl |
|
not finished |
3/28 | Day |
|
done |
3/28 | Swing |
|
done |
3/29 | Owl |
|
done |
3/29 | Day |
|
done |
3/29 | Swing |
|
done |
3/30 | Owl |
|
done |
3/30 | Day |
|
done, except linearity |
3/30 | Swing |
|
done |
3/31 | Owl |
|
done |
3/31 | Day |
|
done |
3/31 | Swing |
|
Moller was done |
4/1 | Owl |
|
done |
4/1 | Day |
|
done, successful |
4/1 | Swing |
|
done |
Friday 2 April | Owl |
|
partly done, needs more work |
Friday 2 April | Day |
|
done |
Friday 2 April | Swing |
|
done, but not Q2 |
Saturday 3 April | Owl |
|
done |
Saturday 3 April | Day |
|
done, but not yet in prod. |
Saturday 3 April | Swing |
|
done |
Sunday 4 April | Owl |
|
done |
Sunday 4 April | Day |
|
done |
Sunday 4 April | Swing |
|
done |
Monday 5 April | Owl |
|
done |
Monday 5 April | Day |
|
done |
Monday 5 April | Swing |
|
done |
Tuesday 6 April | Owl |
|
partly done |
Tuesday 6 April | Day |
|
postponed: vacuum problems |
Tuesday 6 April | Swing |
|
|
Wednesday 7 April | Owl |
|
|
Wednesday 7 April | Day |
|
Leak found at O-ring connection between target chamber and collimator box |
Wednesday 7 April | Swing |
|
|
Thursday 8 April | Owl |
|
|
Thursday 8 April | Day |
|
Target chamber open, found that the 4th foil in Optics target blown off |
Thursday 8 April | Swing |
|
|
Friday 9 April | Owl |
|
|
Friday 9 April | Day |
|
|
Friday 9 April | Swing |
|
|
Saturday 10 April | Owl |
|
|
Saturday 10 April | Day |
|
|
Saturday 10 April | Swing |
|
|
Sunday 11 April | Owl |
|
|
Sunday 11 April | Day |
|
|
Sunday 11 April | Swing |
|
|
Monday 12 April | Owl |
|
|
Monday 12 April | Day |
|
|
Monday 12 April | Swing |
|
|
Tuesday 13 April | Owl |
|
|
Tuesday 13 April | Day |
|
|
Tuesday 13 April | Swing |
|
Tungsten collimator modified and installed. Target pump down started and initially successful. |
Wednesday 14 April | Owl |
|
Target pump down. |
Wednesday 14 April | Day |
|
Done. Vacuum good. Target cold. |
Wednesday 14 April | Swing |
|
|
Thursday 15 April | Owl |
|
|
Thursday 15 April | Day |
|
|
Thursday 15 April | Swing |
If possible, depending on heat load test:
|
|
Friday 16 April | Owl |
|
|
Friday 16 April | Day |
|
|
Friday 16 April | Swing |
|
|
Saturday 17 April | Owl |
|
|
Saturday 17 April | Day |
|
|
Saturday 17 April | Swing |
|
|
Sunday 18 April | Owl |
|
|
Sunday 18 April | Day |
|
|
Sunday 18 April | Swing |
|
|
Monday 19 April | Owl |
|
|
Monday 19 April | Day |
|
|
Monday 19 April | Swing |
|
|
Tuesday 20 April | Owl |
|
|
Tuesday 20 April | Day |
|
|
Tuesday 20 April | Swing |
|
|
Wednesday 21 April | Owl |
|
|
Wednesday 21 April | Day |
|
|
Wednesday 21 April | Swing |
|
|
Thursday 22 April | Owl |
|
|
Thursday 22 April | Day |
|
|
Thursday 22 April | Swing |
|