Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to: navigation, search
(Current Daily Run Plans)
(Current Daily Run Plans)
Line 39: Line 39:
 
|Done
 
|Done
 
|-
 
|-
|-style="background: #FCF3CF;
 
 
| rowspan="3" | Wednesday, July 17
 
| rowspan="3" | Wednesday, July 17
 +
|Owl
 +
|Production with 50uA with Aq, BMW and Energy-mode:'RF-off' 
 +
|
 +
|-
 +
| Day
 +
 +
|
 +
|-
 +
| Swing
 +
|50-70 microAmp production, FFB, Detector and SAM calibration
 +
|-
 +
|-style="background: #FCF3CF;
 +
| rowspan="3" | Wednesday, July 18
 
|Owl
 
|Owl
 
|Production with 50uA with Aq, BMW and Energy-mode:'RF-off'   
 
|Production with 50uA with Aq, BMW and Energy-mode:'RF-off'   

Revision as of 10:43, 18 July 2019

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Monday, July 15 Owl Production+ analysis. Except ~3 hour down time, we took good data
Day FFB commissioning until 10AM. Take run with FFB (if ready) or w/o FFB (if not ready) until MOLLER experts walk in for MOLLER commissioning. MOLLER polarimeter commissioning is going on
Swing MOLLER commissioning
Tuesday, July 16 Owl MOLLER Polarimeter and FFB commissioning
Day production after pass change
Swing change IHWP ('out'), BPM and BCM calibration (Caryn) Done
Wednesday, July 17 Owl Production with 50uA with Aq, BMW and Energy-mode:'RF-off'
Day
Swing 50-70 microAmp production, FFB, Detector and SAM calibration
Wednesday, July 18 Owl Production with 50uA with Aq, BMW and Energy-mode:'RF-off'
Day 70 microAmp production, FFB, Detector and SAM calibration
Swing

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting