Difference between revisions of "RunPlanDaily"
From PREX Wiki
Chandabindu (Talk | contribs) (→Current Daily Run Plans) |
(→Current Daily Run Plans) |
||
Line 39: | Line 39: | ||
|Done | |Done | ||
|- | |- | ||
− | |||
| rowspan="3" | Wednesday, July 17 | | rowspan="3" | Wednesday, July 17 | ||
+ | |Owl | ||
+ | |Production with 50uA with Aq, BMW and Energy-mode:'RF-off' | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | |50-70 microAmp production, FFB, Detector and SAM calibration | ||
+ | |- | ||
+ | |-style="background: #FCF3CF; | ||
+ | | rowspan="3" | Wednesday, July 18 | ||
|Owl | |Owl | ||
|Production with 50uA with Aq, BMW and Energy-mode:'RF-off' | |Production with 50uA with Aq, BMW and Energy-mode:'RF-off' |
Revision as of 10:43, 18 July 2019
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Monday, July 15 | Owl | Production+ analysis. | Except ~3 hour down time, we took good data |
Day | FFB commissioning until 10AM. Take run with FFB (if ready) or w/o FFB (if not ready) until MOLLER experts walk in for MOLLER commissioning. | MOLLER polarimeter commissioning is going on | |
Swing | MOLLER commissioning | ||
Tuesday, July 16 | Owl | MOLLER Polarimeter and FFB commissioning | |
Day | production after pass change | ||
Swing | change IHWP ('out'), BPM and BCM calibration (Caryn) | Done | |
Wednesday, July 17 | Owl | Production with 50uA with Aq, BMW and Energy-mode:'RF-off' | |
Day | |||
Swing | 50-70 microAmp production, FFB, Detector and SAM calibration | ||
Wednesday, July 18 | Owl | Production with 50uA with Aq, BMW and Energy-mode:'RF-off' | |
Day | 70 microAmp production, FFB, Detector and SAM calibration | ||
Swing |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting