Difference between revisions of "RunPlanDaily"
From PREX Wiki
(→Current Daily Run Plans) |
(→Current Daily Run Plans) |
||
Line 14: | Line 14: | ||
|- | |- | ||
|-style="background: #FCF3CF; | |-style="background: #FCF3CF; | ||
+ | | rowspan="3" | Friday, July 19 | ||
+ | |Owl | ||
+ | |Moller measurement | ||
+ | |ready for the spin dance, may need short measurement to be complete. | ||
+ | |- | ||
+ | | Day | ||
+ | |control access for the RHRS Q2 magnet tripping | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | |Bandwidth, BCM, FFB, Left arm only production at 50uA | ||
+ | | | ||
+ | |- | ||
| rowspan="3" | Friday, July 19 | | rowspan="3" | Friday, July 19 | ||
|Owl | |Owl |
Revision as of 08:38, 21 July 2019
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Friday, July 19 | Owl | Moller measurement | ready for the spin dance, may need short measurement to be complete. |
Day | control access for the RHRS Q2 magnet tripping | ||
Swing | Bandwidth, BCM, FFB, Left arm only production at 50uA | ||
Friday, July 19 | Owl | Moller measurement | ready for the spin dance, may need short measurement to be complete. |
Day | control access for the RHRS Q2 magnet tripping | ||
Swing | Bandwidth, BCM, FFB, Left arm only production at 50uA |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting