PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Monday, August 12 | Owl | Production running at 70uA with | |
Day |
|
||
Swing | Production running at 70uA | ||
Tuesday, August 13 | Owl | Production running at 70uA | |
Day |
| ||
Swing | Transverse Polarized Measurement | roduction running until beam was taken away for Hall B. | |
Wednesday, August 14 | Owl | Transverse Polarized Measurement | |
Day |
|
| |
Swing
|
Production running at 70uAroduction running until beam was taken away for Hall B. |
| |
Thursday, August 15 | Owl | Production running at 70uA | |
Day | Production running at 70uA | ||
Swing | Production running at 70uA |
| |
Friday, August 16 | Owl | Production running at 70uA | Beam off at 7 AM to cool down the hall prior to Compton work |
Day |
|
| |
Swing | Production running at 70uA | No beam due to CHL and Hall B restore | |
Saturday, August 17 | Owl | Production running at 70uA | No beam due to CHL and Hall B restore |
Day | Production running at 70uA |
| |
Swing | Production running at 70uA | Garrett | |
Sunday, August 18 | Owl | Production running at 70uA | |
Day | Moller measurement | ||
Swing | Production running at 70uA |
| |
Monday, August 19 | Owl | Production running at 70uA | |
Day | Production running at 70uA | ||
Swing | Production running at 70uA | ||
Tuesday, August 20 | Owl | Production running at 70uA | |
Day | Production running at 70uA | ||
Swing | Production running at 70uA | ||
Wednesday, August 21 | Owl | Production running at 70uA | |
Day | Moller | Moller measurement reproduced the previous results, seeing ~2% difference between IHWP IN/OUT. Compton shows the similar difference. | |
Swing | Q2 measurement | Ran smoothly based on the run plan, measured Qsq for difference Pb targets that were used, initial analysis shows stable Qsq for diff targets. Also took data for C 1% and 40Ca. Wrapped up by midnight. | |
Thursday, August 22 | Owl | Production running at 70uA | Production running on Pb5. High compton background rates observed (3-3.5kHz). Need to address it after Wien flip. |
Day | Wien flip | Beam taken away at 8:30. Mott measurements before Wien flip. MCC will have an access to fix a viewer. Caryn's injector work (IHWP, PC check) in the meantime. | |
Swing | Wien flip and beam restoration | Mott measurement after the Wien flip, shows consistent results between IHWP IN and OUT within uncertainty. Followed by PQB check. | |
Friday, August 23 | Owl | Production, 70uA | Beam restoration starting with Hall B tuning. Beam back to Hall A around the middle of swing, recived 70uA, straight through. |
Day | Production, 70uA | Production running until beam was taken away for Hall B and Hall A Compton. Compton commissioning (to reduce downstream background rates). Injector re-tune. | |
Swing | Production running at 70uA | Beam back to Hall A (mid-swing), sent through the Compton Chicane. Compton backgrounroduction running until beam was taken away for Hall B.d rates are still higher than before (fluctuating between 4-5kHz) | |
Saturday, August 24 | Owl | Production, 70uA | |
Day | Production, 70uA | Beam taken away for Hall B tuning around noon. 6.5hours of total downtime. opportunistic access in the meantime to reset AHU, more shielding added, left side camera control box reset. | |
Swing | Production running at 70uA | Beam back at 6pm. Steady production running since then. | |
Sunday, August 25 | Owl | Production, 70uA | |
Day | Production, 70uA | ||
Swing | Production running at 70uA | ||
Monday, August 26 | Owl | Production, 70uA | |
Day | Moller | ||
Swing | Production, 70uA | No compton, got straight through beam | |
Tuesday, August 27 | Owl | Production, 70uA | No compton, got straight through beam |
Day | Compton tuning | ||
Swing | Production 71uA Energy measurement |
Parasitic energy measurement during production (not completed) | |
Wednesday, August 28 | Owl | Production 70uA | |
Day | Stubby quatz; blinding study | completed | |
Swing | Stubby quatz; blinding study; recovery | completed; recovery took until 2AM. Seen increased widths with 1C19/1C20 10% increase | |
Thursday, August 29 | Owl | Production, 70uA | No compton, got straight through beam |
Day | Compton tuning + Main Exp tuning; | completed intrinsic spot size adjustments by 4 15; | |
Swing | Main experiment width test. Test S0 integrity with short low current run. Pole tip re-scattering | width test showed problems with the dithering sensitivity; S0 test could not be done because LHRS regulator was broken; Pole tip rescattering data taking went well (sieve runs were only with the left arm). | |
Friday, August 30 | Owl | Aux msmts and try different 1H01/1H04 settings to see if they provide changes in sensitivities | this was done with poor sensitivities on dithering and L arm only |
Day | Access to address R arm | plan developed to address dithering | |
Swing | Access wrapped up by 8 pm; implementation of Todd's phase telescope | phase telescope didn't provide the needed sensitivities but proved that we can indeed reconfigure quads to impact sensitivities | |
Saturday, August 31 | Owl | Production 71uA | still with poor sensitivities |
Day | Moller | ||
Swing | Moller | ||
Sunday, September 1 | Owl | Optics | |
Day | Optics wrap up by 11 AM (including preli tgt density study); access to blind ATs and take them out of counting mode; Attempt beam restore through Compton | first settings didn't provide a good solution but clear path | |
Swing | recovered sensitivities; good Compton rates; back to production | ||
Monday, September 1 | Owl | Production 71uA | |
Day | Production 71uA | ||
Swing | Production 71uA | ||
Tuesday, September 3 | Owl | Production 71uA; further 1h tgt density study | |
Day | Production 71uA; injector prebuncher checks; | ||
Swing | Q2; Production 71uA | ||
Wedsday, September 4 | Owl | Production 71uA | |
Day | Moller | ||
Swing | Moller | ||
Thursday, September 5 | Owl | Production 71uA | |
Day | Mott polarimetry measurements | ||
Swing | Production 71uA | ||
Friday, September 6 | Owl | Production 71uA | |
Day | Production 85uA ? | ||
Swing | Production 85uA ? | ||
Saturday, September 7 | Owl | Production 85uA ? | |
Day | Production 85uA ? Rescattering (left arm)?? | ||
Swing | Production 85uA ? | ||
Sunday, September 8 | Owl | Production 85uA ? | |
Day | Moller Polarimetry | ||
Swing | Production 85uA ? | ||
Monday, September 9 | Owl | Production 85uA ? | |
Day | SADness | ||
Swing |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting