Daily Run Plan

Here are details of the daily run plan. See also the Global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.

Previous daily run plans can be found here PreviousRunPlanDaily


Daily Run Plan for PREX   (latest at bottom)
Date (2010) Shift ---------- Activity (Responsible) ---------- --- Status ---
Monday 3 May Owl
  • Production
Monday 3 May Day
  • Hall B Pass change 3 -> 5 until ~1:00PM
  • Compton vacuum, LHRS dipole UPS replacement during the down
  • Bake compton chicane overnight during production, run beam straight through
  • Return to PbD #2 production
  • Large asymmetry run (Jon)
  • Baking started, HRS work completed by Heidi
Monday 3 May Swing
  • Production
Tuesday 4 May Owl
  • Production
Tuesday 4 May Day
  • Work on switch for Pockels cell (start 9:00AM)
  • Complete Compton beam line bake-out, leak check, cavity alignment
  • Pockels cell switch work complete
  • Compton vacuum reopened
Tuesday 4 May Swing
  • Production
  • Continued Compton realignment/laser polarization measurement
Wednesday 5 May Owl
  • Production
  • Stopped work on Compton - still not complete
  • Changed beam spot size to 200x200um
Wednesday 5 May Day
  • 12 hours Moller tests, start 9:00AM (Sasha, Jixie)
Wednesday 5 May Swing
  • Finish Moller tests, 21:00
  • Raster clock tests 22:00-24:00 (KK, Bob, Jon)
  • Production as per raster clock tests
Thursday 6 May Owl
  • Production
Thursday 6 May Day
  • Beam Studies (8 hours controlled access starting 08:15)
    • Finish Compton cavity work (Sirish, Abdurahim)
    • Start Compton pumping, replace leaky upstream valve? (John Heckman et al)
    • Remove GEM(s)?? (Alex, Kiad)
    • Compton Boron installation (Megan)
  • Continued compton cavity alignment
  • Boron installed
  • INFN GEMs removed to EEL, (additional UVA GEM installed?
Thursday 6 May Swing
  • Raster clock tests
  • Production
  • CHL trip
Friday 7 May Owl
  • Raster clock tests (cont?)
  • Production
  • Tests aborted due to network switch failure in the hall
Friday 7 May Day
  • Production
  • Wien flip, QE scan, spot move (nominally 9:00AM)
  • Wien flip, QE scan, spot move completed.
  • Compton valve work continued until 2:00
  • Started detector alignment checks
  • Q2 and establish low-current cavities (Dustin)
Friday 7 May Swing
  • Tests by KK et al
  • Production
Saturday 8 May Owl
  • Production
Saturday 8 May Day
  • Production
  • 2:00PM - Turn off cavity baking
  • 3:00PM - Leak check, turn on ion pumps
  • 4:00PM - Routine Moller Measurement
  • Compton vacuum reestablished
  • Replaced valve opens with sufficient vacuum levels
Saturday 8 May Swing
  • Moller
  • Moller measurement gives 91% polarization
Sunday 9 May Owl
  • Production
Sunday 9 May Day
  • Compton ready?
  • Production
  • Cavity locks at 3kW!
  • Valve upstream of chicane will not open
Sunday 9 May Swing
  • Production
Monday 10 May Owl
  • Production
  • Left dipole down
  • Compton valve stuck
Monday 10 May Day
  • Fix left dipole
  • Fix Compton valve
  • Fix target vacuum
  • Left dipole down
  • Compton valve fixed and tested
  • Target vacuum bad
Monday 10 May Swing
  • Standby
  • Empty or C target oversampling runs if valves can be opened
  • 1-arm production if target vacuum < 5E-5
  • Left dipole down
  • Target vacuum bad
Tuesday 11 May Owl
  • Standby
  • Empty or C target oversampling runs if valves can be opened
  • 1-arm production if target vacuum < 5E-5
Tuesday 11 May Day
  • Wien flip
  • Beam studies -- injector studies
  • Raster setup
  • Fix left dipole
  • Fix target vacuum
Tuesday 11 May Swing
  • Compton tune
  • Oversampling tests
  • Left dipole down
  • Right dipole NMR down
  • Target vacuum bad
Wednesday 12 May Owl
  • Production
  • Left dipole down
  • Right dipole NMR down
  • Target vacuum bad
Wednesday 12 May Day
  • Repair left dipole PS
  • Repair right dipole NMR
  • Repair right Q3 bad bit
  • Target vacuum bad
Wednesday 12 May Swing
  • Standby
  • Left dipole down
  • Left Q3 controls problem
  • Target vacuum bad
Thursday 13 May Owl
  • Standby
  • Left dipole down
  • Left Q3 controls problem
  • Target vacuum bad
Thursday 13 May Day
  • Repair left dipole PS
  • Repair left Q3 controls
  • Find and stop target vacuum leak
  • Warm up target
Thursday 13 May Swing
  • Warm up target
Friday 14 May Owl
  • Pump down target
Friday 14 May Day
  • Pump down target
Friday 14 May Swing
  • Cool target
  • Re-establish beam
  • Raster tests
  • Target vacuum good
  • Both spectrometers good
Saturday 15 May Owl
  • Production
Saturday 15 May Day
  • Access for left dipole regulation
  • Left dipole regulation failed
  • Target vacuum increase, then decrease with added heating
Saturday 15 May Swing
  • Access for left dipole regulation
  • Re-establish beam
  • Møller
  • Left dipole regulation bad
  • Target vacuum varying, mostly < 1e5
Sunday 16 May Owl
  • Møller
  • Left dipole regulation bad
  • Target vacuum varying, mostly < 1e5
Sunday 16 May Day
  • Access for left dipole regulation
  • Target vacuum varying, mostly < 1e5
Sunday 16 May Swing
  • Production
  • Background test (L PMTs on)
  • Left dipole regulation bad
  • Target vacuum varying, mostly < 1e5
Monday 17 May Owl
  • Production
Monday 17 May Day
  • Controlled Access for Left Dipole fix
  • Moller refilled
  • Left dipole working for now
  • Suspect bad silicon-controlled rectifier (SCR)
  • There are 12 needed and only 6 spares
  • Looking for spares and will work during beam studies Tue.
Monday 17 May Swing
  • Production with both arms!
Tuesday 18 May Owl
  • Production (hopefully with both arms!)
  • No Left Dipole issues all night
Tuesday 18 May Day
  • Beam Studies, beginning 9am (8hrs)
  • Wien Flip
  • Maintenance on the Left Dipole Power supply
  • Wien Flip completed before beam studies
  • Beam studies completed
  • Measurements performed on Left Dipole Power supply
Tuesday 18 May Swing
  • Production
  • Oversample tests (Rupesh)
  • Compton not done
  • Oversample tests not done
Wednesday 19 May Owl
  • Production
  • Oversample tests
  • Oversample tests completed
Wednesday 19 May Day
  • Compton Tuning (1-2hrs, start around 10am)
  • Raster tests during 'target vacuum recovery'
  • Production
  • Injector tuning did not help Compton rates
  • Jay and Yan are asking for advice
  • Compton tuning during beam studies tomorrow
Wednesday 19 May Swing
  • Production
  • Q2 and detector alignment (2-3hrs, around 8pm)
  • short Q2 measurement
  • Target vacuum tripped valves closed -> no beam
Thursday 20 May Owl
  • Production
  • No beam - target operator only
Thursday 20 May Day
  • Beam Studies (start at 8:30am, afternoon for Compton tuning)
  • Some measurements on left dipole power supply by Jack in Hall
  • Production
  • Compton tuning needs to be rescheduled
  • Jack did some work in hall
Thursday 20 May Swing
  • Canceled
We lost the target vacuum. Will need to warm up target and replace O-ring after letting radiation subside. Plan to replace O-ring on Monday May 24.
Friday 21 May Owl
  • Canceled
Friday 21 May Day
  • Canceled
Friday 21 May Swing
  • Canceled
Saturday 22 May Owl
  • Canceled
Saturday 22 May Day
  • Canceled
Saturday 22 May Swing
  • Canceled
Sunday 23 May Owl
  • Canceled
Sunday 23 May Day
  • Canceled
Sunday 23 May Swing
  • Canceled
Monday 24 May Owl
  • Canceled
Monday 24 May Day
  • Various tests
    • Pedestal runs
    • linearity studies
    • detector time constant tests
    • GEM studies
  • Target repairs - replace o-ring with silicon one temporarily
  • Keep target warm and pump down
  • Leak check
Monday 24 May Swing
  • Pedestal runs
Tuesday 25 May Owl
  • Canceled
Tuesday 25 May Day
  • Beam Studies (until between 10am and noon)
  • Pedestal runs
Kalres O-ring installed ahead of schedule. Pumping down.
Tuesday 25 May Swing
  • Pedestal runs
Wednesday 26 May Owl
  • Canceled
Wednesday 26 May Day
  • Accelerator Vacuum Group in Hall for Leak checks
  • Switch box arrived for activate remotely the heating and cooling of thetarget
  • Found a leak, but pressure stable at 675 mtor
  • Electrician will install the appropriate outlet; R. Michaels is working on the remote control.
Wednesday 26 May Swing
  • Canceled
Thursday 27 May Owl
  • Canceled
Thursday 27 May Day
  • Accelerator Vacuum Group in Hall for Leak checks
Thursday 27 May Swing
  • Canceled
Friday 28 May Owl
  • Canceled
Friday 28 May Day
  • Shift workers on Standby
  • Accelerator Vacuum Group in Hall for Leak checks
Friday 28 May Swing
  • Canceled
Saturday 29 May Owl
  • Canceled
Saturday 29 May Day
  • Canceled
Saturday 29 May Swing
  • Canceled
Sunday 30 May Owl
  • Canceled
Sunday 30 May Day
  • Canceled
Sunday 30 May Swing
  • Canceled
Monday 31 May Owl
  • Canceled
Monday 31 May Day
  • Canceled
Monday 31 May Swing
  • Canceled
Tuesday 1 June Owl
  • Canceled
Tuesday 1 June Day
  • Canceled
Tuesday 1 June Swing
  • Canceled
Wednesday 2 June Owl
  • Canceled
Wednesday 2 June Day
  • Canceled
Wednesday 2 June Swing
  • canceled
Thursday 3 June Owl
  • Canceled
Thursday 3 June Day
  • Cooling down target (more likely to start on Swing)
  • Day shift on standby.
Thursday 3 June Swing
  • Swing shift workers are needed.
    • PREX detector in counting mode
    • resume beam in Compton chicane ( MCC )
    • harp scan for beam profile and beam position ( Shift crew - MCC )
    • raster check ( Shift crew )
    • Long down target recovery procedure ( Shift crew )
  • Alignment checks, Q2 ( Dustin Mc Nulty ).
    • put sieve in
    • take alignement data
    • put sieve out
    • Q2 measurement
    • Ask for access to go to integrating mode ( Jon Wrexler or Amhed Zafar )
  • Restart Production
  • Production
Friday 4 June Owl
  • Production
Friday 4 June Day
  • Production
Friday 4 June Swing
  • Production
Saturday 5 June Owl
  • Production
Saturday 5 June Day
  • Production
Saturday 5 June Swing
  • Production
Sunday 6 June Owl
  • Production
Sunday 6 June Day
  • Production
Sunday 6 June Swing
  • Production
Monday 7 June Owl
  • Production
Monday 7 June Day
  • Production
Monday 7 June Swing
  • Production
Tuesday 8 June Owl
  • Production
Tuesday 8 June Day
  • Production
Tuesday 8 June Swing
  • Production
Wednesday 9 June Owl
  • Production
Wednesday 9 June Day
  • Production
Wednesday 9 June Swing
  • Production