Date (2010) Shift ---------- Activity (Responsible) ---------- --- Status ---
Monday 3 May Owl
  • Production
Monday 3 May Day
  • Hall B Pass change 3 -> 5 until ~1:00PM
  • Compton vacuum, LHRS dipole UPS replacement during the down
  • Bake compton chicane overnight during production, run beam straight through
  • Return to PbD #2 production
  • Large asymmetry run (Jon)
  • Baking started, HRS work completed by Heidi
Monday 3 May Swing
  • Production
Tuesday 4 May Owl
  • Production
Tuesday 4 May Day
  • Work on switch for Pockels cell (start 9:00AM)
  • Complete Compton beam line bake-out, leak check, cavity alignment
  • Pockels cell switch work complete
  • Compton vacuum reopened
Tuesday 4 May Swing
  • Production
  • Continued Compton realignment/laser polarization measurement
Wednesday 5 May Owl
  • Production
  • Finished Compton
  • Changed beam spot size to 200x200um
Wednesday 5 May Day
  • 12 hours Moller tests, start 9:00AM (Sasha, Jixie)
  • Start Compton pumping/baking during Moller refill (John Heckman, et al)
Wednesday 5 May Swing
  • Finish Moller tests
  • Production
Thursday 6 May Owl
  • Production
Thursday 6 May Day
  • Beam Studies
  • RQ1 DAC replacement (Jack et al)
  • Remove Compton pumps (John Heckman et al)
Thursday 6 May Swing
  • Production
Friday 7 May Owl
  • Q2 and establish low-current cavities. (Bob)
  • Production
Friday 7 May Day
  • Production
  • Wien flip
Friday 7 May Swing
  • Production
Saturday 8 May Owl
  • Production
Saturday 8 May Day
  • Production
  • Routine Moller Measurement
Saturday 8 May Swing
  • Production
Wednesday 5 May Owl
  • Production
Wednesday 5 May Day
  • Production
Wednesday 5 May Swing
  • Production
Thursday 6 May Owl
  • Production
Thursday 6 May Day
  • Production
Thursday 6 May Swing
  • Production
Friday 7 May Owl
  • Production
Friday 7 May Day
  • Production
Friday 7 May Swing
  • Production
Saturday 8 May Owl
  • Production
Saturday 8 May Day
  • Production
Saturday 8 May Swing
  • Production
Sunday 9 May Owl
  • Production
Sunday 9 May Day
  • Production
Sunday 9 May Swing
  • Production
Monday 10 May Owl
  • Production
Monday 10 May Day
  • Production
Monday 10 May Swing
  • Production
Tuesday 11 May Owl
  • Production
Tuesday 11 May Day
  • Production
Tuesday 11 May Swing
  • Production
Wednesday 12 May Owl
  • Production
Wednesday 12 May Day
  • Production