RunPlanDaily
From PREX Wiki
Jump to navigationJump to searchThe printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Tuesday, June 25 | Owl | No beam. shift cancelled. | |
Day | Target cooling down. | shift cancelled | |
Swing | Optics. | Vacuum issue. No beam for the whole shift. | |
Wednesday, June 26 | Owl | Optics. | |
Day | Optics. Send beam through Compton chicane. | Optics complete. Vacuum valve VBV1P03 (compton table) can't be opened. | |
Swing | Low current cavity lock test. Optics. Q^2 measurement (Bob or Kent). Opportunistic: SAM test. | Cavity lock commissioning completed | |
Thursday, June 27 | Owl | Optics (db scan), Q2 measurement, detector alignment | db scan, Q2 data taking completed in the morning, detector adjustment needs hall access in the afteroon |
Day | Send beam through Compton chicane, Compton commissioning. | Fail to send beam through compton chicane | |
Swing | Rate scan (Dustin) and SAM shutter test, raster size verification | All completed | |
Friday, June 28 | Owl | Controlled access (SAM shutter removed, detectors to integrating mode), high current test (no FFB ;-() | |
Day | Mostly down due to vacuum problem, shift BMW test with tune beam, Compton commissioning | ||
Swing | Compton commissioning, current + PITA scan, finish up high current test, BMW | Unable to finish any of the task in the list, beam restoration procedure performed throughout the swing shift. Harp scan (similar spot size compared to yesterday, x ~100um, y ~ 550um). Established raster size, FFB. | |
Saturday, June 29 | Owl | Production (natural Pb, Carbon) | Down due to target vacuum problem |
Day | Production with 208Pb? Rate studies, Phase 1. | Down due to target vacuum problem | |
Swing | Sweep + access. Phase 2 rate studies | Down due to target vacuum problem | |
Sunday, June 30 | Owl | 208Pb Production. Target Fleet Commissioning | Down due to target vacuum problem |
Day | Moller commissioning. | Down due to target vacuum problem | |
Swing | Optics - Y target finding, Bandwidth. Collimator heating axis study. | Down due to target vacuum problem | |
Monday, July 1 | Owl | Down due to target vacuum problem | |
Day | Beam Studies | Target vacuum leak source found, recovery in progress | |
Swing | Site power loss while ramping up HRS magnets after target cool down | ||
Tuesday, July 2 | Owl | Down due to the site power loss, https://logbooks.jlab.org/entry/3697845 | |
Day | Down due to the site power loss | ||
Swing | Down due to the site power loss | ||
Wednesday, July 3 | Owl | Down due to the site power loss | |
Day | Still down from the power loss, CHL started CT recovery and perhaps 2K pumpdown in the afternoon | ||
Swing | |||
Thursday, July 4 | Owl | ||
Day | |||
Swing | |||
Friday, July 5 | Owl | ||
Day | |||
Swing |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting