CREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Comments/Status | ||||
---|---|---|---|---|---|---|---|
Monday, Jan 6 | Owl | ||||||
Day | |||||||
Swing | Moller Lock, FFB low current, Optics | Raster Iy issue resolved, all same as Dec. | |||||
Tuesday, Jan 7 | Owl | Optics | Larm det ul base replaced | ||||
Day | Mott, Spin Dance | Vac gauge readout 1-e12, vac adjacent fine (not urgent, to be fix later) | |||||
Swing | Spin Dance, 150uA to dump | Experts: (Simona, Eric) , (Caryn, Devi) | |||||
Wednesday, Jan 8 | Owl | 150uA, bcm/det calibration, damping measure, bmw initialization...production | Experts: Caryn, Devi, Ye | ||||
Day | Hall Access, fix compton T controller. OPS down:RF recovery, NL RF cav gradient, energy loss, broken klystron, failed arc det. | ||||||
Swing | Tune through chicane attempt, bleed-through from B discovered, returned to straight through end of shift, but compton rates too high | Experts: Compton(Dave, Adam, Amali), BMW(Ye,Victoria,Caryn) | |||||
Thursday, Jan 9 | Owl | Low current BMW tune 1H01 test | Couldn't send beam due to compton rates | ||||
Day | halld laser inj access, bleedthrough B into A injector work prebuncher, chopper. | ||||||
Swing | compton tuning through chicane...but match into hall was wrong. | Couldn't send beam due to spot size limitations. | |||||
Friday, Jan 10 | Owl | Tuning match into Hall | |||||
Day | "Production", injector adjustment, injector match | ||||||
Swing | injector match, hall match, hall on design, lower compton rates straight through, compton chicane tuning attempt ran out of time | ||||||
Sat Jan 11 | Owl | Production, FFB gain issues (hi search limit), yield det decrease and width increase over night | |||||
Day | detector alignment check and left dipole current adjustment. Production. LQ1 trip, recycle. | ||||||
Swing | 7:53PM HA to power permit, beam -> C | ||||||
Sun Jan 12 | Owl | (figure out HC feedback again) | |||||
Day | Radcon survey, Compton Laser work | (TO HC feedback ) | |||||
Swing | Compton Laser work | (TO HC feedback ) | |||||
Mon Jan 13 | Owl | (TO HC feedback ) | |||||
Day | Vacuum group work ion pump, Compton laser work | (TO HC feedback ) | |||||
Swing | Compton laser work, Hall Lockup, tell OPS PQB checkout in INJ when HA coming back online | (TO HC feedback ) | |||||
Tues Jan 14 | Owl | Production, | |||||
Day | Compton chicane tuning, commissioning, Production Don's Run Plan | ||||||
Swing | BMW fine tune, Production Don's Run Plan | ||||||
Wed Jan 15 | Owl | Production, | |||||
Day | Compton chicane tuning, commissioning, Production Don's Run Plan | ||||||
Swing | BMW fine tune, Production Don's Run Plan | ||||||
Th Jan 16 | Owl | Production, | |||||
Day | Hall C tuning, production | ||||||
Swing | Production, | ||||||
Fr Jan 17 | Owl | Compton setup, Production, | |||||
Day | Machine tuning; return to production | ||||||
Swing | Production | ||||||
Sat Jan 18 | Owl | Production, | |||||
Day | Production | ||||||
Swing | Production | ||||||
Sun Jan 19 | Owl | Down due to target issue, controlled access | |||||
Day | Down due to target issue, controlled access | ||||||
Swing | Down due to target issue, controlled access | ||||||
Mon Jan 20 | Owl | Down due to target issue, controlled access | |||||
Day | Down due to target issue, controlled access | ||||||
Swing | Down due to target issue, controlled access | ||||||
Tue Jan 21 | Owl | Down due to target issue, controlled access | |||||
Day | Down due to target issue, controlled access | ||||||
Swing | Down due to target issue, controlled access | ||||||
Wed Jan 22 | Owl | Down due to target issue, controlled access | |||||
Day | Down due to target issue, controlled access | Ca40, Ca48 target reinstalled | |||||
Swing | |||||||
Thu Jan 23 | Owl | ||||||
Day | Target cooldown | ||||||
Swing | Beam restoration, target commissioning, detector alignment check, Qsq measurement | ||||||
Fri Jan 24 | Owl | BMW check, target thermal commissioning | |||||
Day | Production! | ||||||
Swing | Production! | ||||||
Sat Jan 25 | Owl | ||||||
Day | |||||||
Swing |
- |
Sun Jan 26 | Owl | ||||
Day | Moller measurement | ||||||
Swing | Moller measurement |
- |
Sun Jan 27 | Owl | |||
Day | Moller measurement | ||||||
Swing | Moller measurement |
- |
Sun Jan 28 | Owl | |||
Day | Moller measurement | ||||||
Swing | Moller measurement |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history CREX
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting