Difference between revisions of "RunPlanDaily CREX"

From PREX Wiki
Jump to: navigation, search
(Current Daily Run Plans)
(Current Daily Run Plans)
Line 101: Line 101:
 
| Swing
 
| Swing
 
| When beam is back: finish low current plans: Frame finding and centering for C-1%, Ca-40, and Ca-48; verify quartz alignment for Ca-48; do Q^2 measurements (C-1%, Ca-40, Ca-48); quartz rate study for C-1%, Ca-40, and Ca-48;  Expect very similar rates for all three targets: ~700k Hz per uA T1 scalar rate
 
| When beam is back: finish low current plans: Frame finding and centering for C-1%, Ca-40, and Ca-48; verify quartz alignment for Ca-48; do Q^2 measurements (C-1%, Ca-40, Ca-48); quartz rate study for C-1%, Ca-40, and Ca-48;  Expect very similar rates for all three targets: ~700k Hz per uA T1 scalar rate
|   
+
We need to know our target centers, quartz alignment, Q^2 and a focal plane rate estimate before going to high-current integration mode
 
|-
 
|-
 
| rowspan="3" | Wednesday, December 11
 
| rowspan="3" | Wednesday, December 11
Line 113: Line 113:
 
|-
 
|-
 
| Swing
 
| Swing
| /high-current commissioning/pre-production  
+
| high-current commissioning/pre-production  
|
+
| Goal is to get the beamline instrumentation ready for PQB to get a look at regression and widths, etc. (pre-production)
 
|}
 
|}
 
[[Run plan history CREX | <B>Previous Daily Run Plans</B>]]
 
[[Run plan history CREX | <B>Previous Daily Run Plans</B>]]

Revision as of 11:05, 10 December 2019



CREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Comments/Status
Wednesday, December 4 Owl No shift
Day Magnet work...
Swing Magnet work...until Jack ready to leave 4-8pm. Then 5pass tuning into A.
Thursday, December 5 Owl 5pass tuning into A.
Day RF stress test to A/RF fixing Burned up 3 raster power supplies (ended test at 4:15pm!)
Swing Go to 1 pass; Septum problem (only up to 400 A); collimator centering; polarity check Set HRS tune P for this septum setting for polarity check--not conclusive
Friday, December 6 Owl spectrometer setup did not allow target alignment checks Beam gone at 3:40am due to Network issue
Day Hall surveyed and in controlled access all day; remove diffusor at end? Septum control software fix; compton e-det work; network issues run down; raster sync problem fixed
Swing lock up hall; reverse septum polarity; raster size and hole locations Left arm NMR probe lock not working--will have to use Hall probe; couldn't put any beam on Ca-40 due to dump FSDs (and beam optics problem -- MOLLER quads set too high)
Saturday, December 7 Owl Tried ion-chamber calibration, but failed; started spec commissioning First pass optics DB looks good; started septum setting and inner edge searches. Right dipole tripped so need to redo inner edge search
Day Jay re-establishes Yves nominal crex beam transport setup; re-check raster size (1.8 x 1.4 now is ~2 mm x 2 mm); new hole centers (did not change much); ion-chamber calibrations done for No target, C-1%, Ca-40, and Pb#4 (on cold ladder); resumed spec. commissioning Found out reason for raster optics issues: Moller quads not set correctly after 5-pass backout causing wide and short raster settings that evolve to tall and narrow raster at the dump (but 2x2 at the target)...
Swing Re-did inner-edge septum scan, spot minimization chase (Sangwa, Ciprian) with quartz checkout (Devi); (call Bob) start optics commissioning We established the preliminary 2mm x 2mm (+/-0.1mm) raster (1.8 x 1.4 MCC), but should be double checked/tweaked before going high current on Calcium
Sunday, December 8 Owl Continued Optics commissioning: dp scans with water-cell measurements most of shift Experts coming in: Bob, Chandan, and Siyu
Day Authorize 150uA; finish optics commissioning; Followup optics studies performed: Q1 scans (-10 to -20%) at +5% septum, nominal tune "P", find best Q1 setting, then scan Q3's to effectively minimumize the FP y widths The established tune "P" for crex gave large x/th coupling, a lack of the "bow-tie" FP theta v. phi shape, and anomalous structures in the dispersive-x FD distributions; seems to be some quad strength in the septum field that is cancelled out by lowering Q1
Swing Established CREX tune: "tune P" with +5% septum, -17%/-15% LQ1/RQ1, -5% Q3s. Redo dp optics scan but without w-cell runs, y-target reconstruction Right dipole tripped OFF at 10:15pm, started ramping back up at 3AM. Aborted sieve-in optics.
Monday, December 9 Owl Took sieves out and proceeded with frame finding/quartz alignment and rate activities. Bob is working to fix left arm spot. R dipole back and stable by 6am, however N Lical went down at 5:30am due to vacuum issue(s) Experts coming in: Bob, Chandan, and Devi
Day SL shift cancelled; TO still required. Hall surveyed and in Controlled Access for opportunistic work Compton work in the hall; Accelerator down at least until 8 AM next day and may restore beam delivery by 12pm tomorrow
Swing SL shift cancelled; TO still required
Tuesday, December 10 Owl SL shift cancelled; TO still required
Day Still investigating vacuum issues in the N. Linac. Spectrometers up and running smooth Hall in Controlled Access for more Compton e-det and laser work; Hall is ready for beam.
Swing When beam is back: finish low current plans: Frame finding and centering for C-1%, Ca-40, and Ca-48; verify quartz alignment for Ca-48; do Q^2 measurements (C-1%, Ca-40, Ca-48); quartz rate study for C-1%, Ca-40, and Ca-48; Expect very similar rates for all three targets: ~700k Hz per uA T1 scalar rate We need to know our target centers, quartz alignment, Q^2 and a focal plane rate estimate before going to high-current integration mode
Wednesday, December 11 Owl go to high-current checkout: setup 150uA to dump no target (can do first Unser calibration here); set SAM and quartz HVs for integration mode; execute Silviu's slow thermal break-in procedure for Ca-40 (and then Ca-48). What other beam instrumentation could be checked-out during thermal break-ins?
Day high-current commissioning When to do Compton chicane tuning? and ion chamber calibration, FFB, and BMW target out--phase advance setup and for production target. This is the preferred order
Swing high-current commissioning/pre-production Goal is to get the beamline instrumentation ready for PQB to get a look at regression and widths, etc. (pre-production)

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history CREX
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting